Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Land to the south of High Street, Drayton
Last published check: 24 Oct 2026, 12:36. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
Discharge of Condition 3 - materials, Condition 4 - boundary details at main access, Condition 9 - pedestrian access / cycleway, Condition 13 - archaeology and Condition 14 - archaeology, Condition 15 - sustainable drainage, Condition 16 - off site foul drainage and Condition 17 - on site foul drainage on application P15/V2447/FUL. 'Erection of 140 new dwellings, extension of the existing access with High Street, creation of new pedestrian and cycle routes, formation of public open space, construction on internal access roads, surface water attenuation, landscaping features and ancillary development. (As amended by plans received 13 January 2016).'
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsLand to the south of High Street, Drayton
This record has no verified map location.
| Document | Published | Action |
|---|---|---|
| Application FormApplication Form | Not published | View |
| SUPERSEDED 2017-04-03 flood risk technical noteOther Plans/Information | Not published | View |
| SM547-EN-191(Misc Engineering+14-0153 INF 191 P1 Overland surface water routing plan)Other Plans/Information | Not published | View |
| SM547-EN-107d(General Arrangement+14-0153 INF 107 P4 Proposed Levels and Road Contours Sheet 6)Other Plans/Information | Not published | View |
| SM547-EN-105d(General Arrangement+14-0153 INF 105 P4 Proposed Levels and Road Contours Sheet 4)Other Plans/Information | Not published | View |
| Drayton - Watercourse Management and MaintenanceOther Plans/Information | Not published | View |
| SM547-EN-104e(General Arrangement+14-0153 INF 104 P5 Proposed Levels and Road Contours Sheet 3)Other Plans/Information | Not published | View |
| 2017 02 08 agent email re additional drainage informationOther Plans/Information | Not published | View |
| SM547-EN-106d(General Arrangement+14-0153 INF 106 P4 Proposed Levels and Road Contours Sheet 5)Other Plans/Information | Not published | View |
| Drayton - SUDs Management and Maintenance DocumentOther Plans/Information | Not published | View |
| 2017 02 08 agent email update on drainage survey workOther Plans/Information | Not published | View |
| 04 2017-04-04 photographic recordOther Plans/Information | Not published | View |
| 05 SM547-EN-039 - Off Site Watercourse Long SectionOther Plans/Information | Not published | View |
| 02 19569 T REV4 TOPOOther Plans/Information | Not published | View |
| 03 19569 T REV4 SECTIONSOther Plans/Information | Not published | View |
| 07 Thames Water Sewer Map Drayton[76]Other Plans/Information | Not published | View |
| 06 apparatus plansOther Plans/Information | Not published | View |
| 08 SM547-EN-038 - Thames Water Overlay PlanOther Plans/Information | Not published | View |
| 01 SUPERSEDED 2017-04-03 flood risk technical note Rev AOther Plans/Information | Not published | View |
| SM547-EN-191b(Misc Engineering+14-0153 INF 191 P2 Overland surface water...Other Plans/Information | Not published | View |
| 2017 05 09 agent email reponse to drainage engineer queriesOther Plans/Information | Not published | View |
| 05 SM547-EN-039 - Off Site Watercourse Long SectionOther Plans/Information | Not published | View |
| Thames water email to developerOther Plans/Information | Not published | View |
| 08 SM547-EN-038 - Thames Water Overlay PlanOther Plans/Information | Not published | View |
| 2017-04-03 flood risk technical note Rev AOther Plans/Information | Not published | View |
| Proposed Levels Road Contours Layout drwgno 14-0153 INF 104 P3General Plan | Not published | View |
| Proposed General Arrangement Layout drwgno 14-0153 INF 109 P2General Plan | Not published | View |
| Proposed External Finishes and Kerb Layout drwgno 14-0153 INF 148 P3General Plan | Not published | View |
| Proposed External Finishes and Kerb Layout drwgno 14-0153 INF 147 P3General Plan | Not published | View |
| Materials Plan drwgno SM547-SL-001General Plan | Not published | View |
| Proposed Levels & Road Contours Layout drwgno 14-0153 INF 105 P2General Plan | Not published | View |
| Proposed External Finishes and Kerb Layout drwgno 14-0153 INF 144 P3General Plan | Not published | View |
| Proposed Catchment Area Plan drwgno 14-0153 INF 119 P1General Plan | Not published | View |
| Block Plan drwgno B0381 4General Plan | Not published | View |
| Proposed Levels & Road Contours Layout drwgno 14-0153 INF 107 P2General Plan | Not published | View |
| Proposed Catchment Area Plan drwgno 14-0153 INF 118 P1General Plan | Not published | View |
| Adoptable Drainage Layout Section 104 Agreement Plan 2 of 2 drwgno 14-0153 INF 165 P3General Plan | Not published | View |
| Adoptable Drainage Layout Section 104 Agreement Plan 1 of 2 drwgno 14-0153 INF 164 P3General Plan | Not published | View |
| Proposed Levels & Road Contours Layout drwgno 14-0153 INF 106 P2General Plan | Not published | View |
| Proposed External Finishes and Kerb Layout drwgno 14-0153 INF 146 P3General Plan | Not published | View |
| Proposed External Finishes and Kerb Layout drwgno 14-0153 INF 145 P3General Plan | Not published | View |
| Block Plan drwgno 14-0153-INF-61General Plan | Not published | View |
| Proposed Levels & Road Contours Layout drwgno 14-0153 INF 102General Plan | Not published | View |
| Proposed Levels & Raod Contours Layout drwgno 14-0153 INF 103 P2General Plan | Not published | View |
| Proposed General Arrangement Layout drwgno 14-0153 INF 108 P2General Plan | Not published | View |
| Proposed External Finsihes and Kerb Layout drwgno +14-0153 INF 143 P3General Plan | Not published | View |
| Written Scheme of InvestigationSupporting documentation | Not published | View |
| Thames Water Statement Regarding Requirement for Offsite Foul Sewer Reinforcement workSupporting documentation | Not published | View |
| Entrance Stone WallSupporting documentation | Not published | View |
| Archaeological Evaluation ReportSupporting documentation | Not published | View |
| Drainage CalculationsSupporting documentation | Not published | View |
| evaluation reportSupporting documentation | Not published | View |
| DIS Letter Approval 22052017115802Decision | Not published | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.