Council planning record

Proposed extraction of concreting aggregate from land at watersplash farm together with the erection of processing plant and associated mineral infrastructure, the provision of a new access from the Gaston Bridge Road/Green Lane roundabout, restoration involving the importation of inert restoration materials to agriculture, flood meadows, lake and reed beds with public access, on a site of 28 ha, and temporary diversion of public footpath 53 for the duration of operations without compliance with Condition 5 (plans and drawings), Condition 32 (reinstatement of footpath), Condition 42 (final restoration contours) and Condition 44 (stages of restoration) of planning permission ref: SP12/01487 dated 12 March 2020. (this application is determined by Surrey County Council under their ref SCCRef-2026-0088)

Land At Watersplash Farm Gaston Bridge Road And Fordbridge Road Shepperton Surrey TW16 6AU

Awaiting decisionReference: 26/00936/SCRVCSpelthorne Borough Council

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Determination Deadline

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Awaiting decision
Application type
SCC Removal or Variation of Condition
Received
7 Sept 2026
Validated
7 Sept 2026
Determination deadline
2 Nov 2026
Local authority
Spelthorne Borough Council

Application overview

Proposed extraction of concreting aggregate from land at watersplash farm together with the erection of processing plant and associated mineral infrastructure, the provision of a new access from the Gaston Bridge Road/Green Lane roundabout, restoration involving the importation of inert restoration materials to agriculture, flood meadows, lake and reed beds with public access, on a site of 28 ha, and temporary diversion of public footpath 53 for the duration of operations without compliance with Condition 5 (plans and drawings), Condition 32 (reinstatement of footpath), Condition 42 (final restoration contours) and Condition 44 (stages of restoration) of planning permission ref: SP12/01487 dated 12 March 2020. (this application is determined by Surrey County Council under their ref SCCRef-2026-0088)

Proposal details

Reference
26/00936/SCRVC

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Land At Watersplash Farm Gaston Bridge Road And Fordbridge Road Shepperton Surrey TW16 6AU

This record has no verified map location.

View council map

Documents 82 of 82

DocumentPublishedAction
ACKFUL ACK LETTER FOR FULLCorrespondence · PDF11 Sept 2026View
STANDARD CONSULTATION LETTERConsultation · PDF11 Sept 2026View
STANDARD CONSULTATION LETTERConsultation · PDF11 Sept 2026View
SITE PLANLandscaping Details · PDF8 Sept 2026View
VISUAL IMPACT ASSESSMENTLandscaping Details · PDF8 Sept 2026View
VISUAL IMPACT ASSESSMENTLandscaping Details · PDF8 Sept 2026View
VISUAL IMPACT ASSESSMENTLandscaping Details · PDF8 Sept 2026View
VISUAL IMPACT ASSESSMENTLandscaping Details · PDF8 Sept 2026View
VISUAL IMPACT ASSESSMENTLandscaping Details · PDF8 Sept 2026View
VISUAL IMPACT ASSESSMENTLandscaping Details · PDF8 Sept 2026View
VISUAL IMPACT ASSESSMENTLandscaping Details · PDF8 Sept 2026View
VISUAL IMPACT ASSESSMENTLandscaping Details · PDF8 Sept 2026View
VISUAL IMPACT ASSESSMENTLandscaping Details · PDF8 Sept 2026View
ADDENDUM TRANSPORT ASSESSMENTTransport Assessment · PDF8 Sept 2026View
EV 4 DATED 8 FEBRUARY 2017 REDACTEDFlood Risk Assessment · PDF8 Sept 2026View
P3/648/2 SITE PLANPlans - Site Layout · PDF8 Sept 2026View
LANDSCAPE AND ECOLOGY MANAGEMENT PLAN AREA AND MANAGEMENT COMPARTMENTSPlans - Site Layout · PDF8 Sept 2026View
FINAL RESTORATION DATED AUGUST 2013Plans - Site Layout · PDF8 Sept 2026View
FINAL RESTRORATION DATED 4 JUNE 2026Plans - Site Layout · PDF8 Sept 2026View
FINAL RESTORATION DATED MAY 2026Plans - Site Layout · PDF8 Sept 2026View
Application FormApplication Form · PDF7 Sept 2026View
ADDENDUM LANDSCAPE AND VISUAL IMPACT ASSESSMENT (LVIA)Landscaping Details · PDF7 Sept 2026View
ENVIRONMENTAL STATEMENTEnvironmental Statement · PDF7 Sept 2026View
NON TECHNICAL SUMMARYEnvironmental Statement · PDF7 Sept 2026View
DATED 12 MARCH 2020 (REF. SP12 01487)Decision Notice · PDF7 Sept 2026View
DATED 21 FEBURARY 2020 REDACTEDSection 106 agreement · PDF7 Sept 2026View
PLANNING STATEMENTPlanning Statement · PDF7 Sept 2026View
VOLUME 2 ENVIRONMENTAL STATEMENT AND TECHNICAL APPENDICESEnvironmental Statement · PDF7 Sept 2026View
VOLUME 2 ENVIRONMENTAL STATEMENT AND TECHNICAL APPENDICESEnvironmental Statement · PDF7 Sept 2026View
VOLUME 2 ENVIRONMENTAL STATEMENT AND TECHNICAL APPENDICESTransport Assessment · PDF7 Sept 2026View
VOLUME 2 ENVIRONMENTAL STATEMENT AND TECHNICAL APPENDICESTransport Assessment · PDF7 Sept 2026View
GROUNDWATER_FLOOD_RISK_ASSESSMENTFlood Risk Assessment · PDF7 Sept 2026View
APPENDIX_6_NOISE_IMPACT_ASSESSMENT_APPENDICESNoise Statement · PDF7 Sept 2026View
VOLUME 2 ENVIRONMENTAL STATEMENT AND TECHNICAL APPENDICESEnvironmental Statement · PDF7 Sept 2026View
VOLUME 2 ENVIRONMENTAL STATEMENT AND TECHNICAL APPENDICESEnvironmental Statement · PDF7 Sept 2026View
VOLUME 2 ENVIRONMENTAL STATEMENT AND TECHNICAL APPENDICESEnvironmental Statement · PDF7 Sept 2026View
VOLUME 2 ENVIRONMENTAL STATEMENT AND TECHNICAL APPENDICESEnvironmental Statement · PDF7 Sept 2026View
VOLUME 2 ENVIRONMENTAL STATEMENT AND TECHNICAL APPENDICESEnvironmental Statement · PDF7 Sept 2026View
VOLUME 3 ENVIRONMENTAL STATEMENTEnvironmental Statement · PDF7 Sept 2026View
VOLUME 4 SUPPLEMENTARY TO PLANNING APPLICATION AND ENVIRONMENTAL STATEMENTEnvironmental Statement · PDF7 Sept 2026View
VOLUME 4 SUPPLEMENTARY TO PLANNING APPLICATION AND ENVIRONMENTAL STATEMENTEnvironmental Statement · PDF7 Sept 2026View
VOLUME 4 SUPPLEMENTARY TO PLANNING APPLICATION AND ENVIRONMENTAL STATEMENTEcological statement · PDF7 Sept 2026View
VOLUME 4 SUPPLEMENTARY TO PLANNING APPLICATION AND ENVIRONMENTAL STATEMENTLandscaping Details · PDF7 Sept 2026View
VOLUME 4 SUPPLEMENTARY TO PLANNING APPLICATION AND ENVIRONMENTAL STATEMENTLandscaping Details · PDF7 Sept 2026View
VOLUME 4 SUPPLEMENTARY TO PLANNING APPLICATION AND ENVIRONMENTAL STATEMENTEnvironmental Statement · PDF7 Sept 2026View
VOLUME 5 SECOND SUPPLEMENTARY TO PLANNING APPLICATION, AND ENVIRONMENTAL STATEMEEnvironmental Statement · PDF7 Sept 2026View
AIR QUALITY ASSESSMENT OF POTENTIAL HGV EMISSIONAir Quality Assessment · PDF7 Sept 2026View
DATED JULY 2015 PART 1 OF 8 REDACTEDReport · PDF7 Sept 2026View
DATED JULY 2015 PART 2 OF 8Report · PDF7 Sept 2026View
DATED JULY 2015 PART 3 OF 8Report · PDF7 Sept 2026View
DATED JULY 2015 PART 4 OF 8Report · PDF7 Sept 2026View
DATED JULY 2015 PART 5 OF 8Report · PDF7 Sept 2026View
DATED JULY 2015 PART 6 OF 8Report · PDF7 Sept 2026View
DATED JULY 2015 PART 7 OF 8Report · PDF7 Sept 2026View
DATED JULY 2015 PART 8 OF 8Report · PDF7 Sept 2026View
HRA APPENDIX AReport7 Sept 2026View
HRA APPENDIX AReport7 Sept 2026View
HRA APPENDIX AReport7 Sept 2026View
HRA APPENDIX AReport7 Sept 2026View
ECOLOGICAL ASSESSMENT OF A PROPOSAL TO EXTRACT MINERALEcological statement · PDF7 Sept 2026View
EIA ADDENDUMEnvironmental Statement · PDF7 Sept 2026View
ADDENDUM TRANSPORT ASSESSMENT NO. 3Transport Assessment · PDF7 Sept 2026View
RESPONSE TO ENVIRONMENT AGENCY RE: WA/20013/113977/01-L01 (12 MARCH 2013), POINTEnvironmental Statement · PDF7 Sept 2026View
ECOLOGICAL ASSESSMENTEcological statement · PDF7 Sept 2026View
APPENDIX TO PLANNING STATEMENT VOLUME 1 WATERSPLASHPlanning Statement · PDF7 Sept 2026View
ATA2 ARCADY 3 ARM NORTH (REV A).Planning Statement7 Sept 2026View
ATA2 ARCADY 4 ARM NORTH (REV A).Planning Statement7 Sept 2026View
ATA2 ARCADY SOUTH (REV A).Planning Statement7 Sept 2026View
BIODIVERSITY ACTION PLANBiodiversity Statement · PDF7 Sept 2026View
CHAPTER 12 AIR QUALITYAir Quality Assessment · PDF7 Sept 2026View
EMAIL FROM TRANSPORT CONSULTANTCorrespondence · PDF7 Sept 2026View
EMAIL FROM TRANSPORT CONSULTANTCorrespondence · PDF7 Sept 2026View
AIR QUALITY ASSESSMENTAir Quality Assessment · PDF7 Sept 2026View
LETTER TO PRINCIPAL PLANNING OFFICER (DL)Correspondence · PDF7 Sept 2026View
LETTER TO PRINCIPAL PLANNING OFFICER (SW)Correspondence · PDF7 Sept 2026View
LETTER TO PRINCIPAL PLANNING OFFICER (SW)Correspondence · PDF7 Sept 2026View
SCC MODEL AUDIT_WATERSPLASHReport7 Sept 2026View
SCC MODEL AUDIT_WATERSPLASHReport7 Sept 2026View
SCC MODEL AUDIT_WATERSPLASHReport7 Sept 2026View
UPDATE CUMULATIVE IMPACT WATERSPLASHEnvironmental Statement · PDF7 Sept 2026View
UPDATE TO ES CHAPTER 12- AIR QUALITYEnvironmental Statement · PDF7 Sept 2026View
LANDSCAPE AND VISUAL IMPACT ASSESSMENT (LVIA) REV ALandscaping Details7 Sept 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Decision not yet published
DATED 12 MARCH 2020 (REF. SP12 01487)
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.