Council planning record

Variation of conditions 2 (Site Location and Development Zones Plan), 4 (Details and Layout of Proposed Infrastructure), 5 (Landscape Specification Plan), 6 (Landscape Maintenance and Management Plan), 7 (Arboricultural Method Statement ), 8 (Construction Environmental Management Plan-Biodiversity), 9 (Biodiversity Enhancement Plan), 10 (Ecological Buffer Zones), 11 (Archaeological Field Evaluation), 12 (Written Scheme of Investigation), 13 (Programme of Archaeological Evaluation), 14 (Construction Traffic Management Plan), 15 (Detailed Surface Drainage Scheme) and 18 (Flood Risk Assessment) pursuant to planning permission reference P20/S3245/FUL. (The construction and operation of a solar photovoltaic farm and associated infrastructure, including inverters, substation compound, security cameras, fencing, access tracks and landscaping). (As updated by plans and documents received 23 October 2024, 25 February 2025, 14 March 2025, 04 April 2025, 13 May 2025 and 27 June 2025.)

Harlesford Farm, near Tetsworth, Oxfordshire, OX9 7BX

Decision MadeReference: P24/S1717/S73South Oxfordshire District Council

Last published check: 12 Oct 2026, 21:46. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Issue Date

    Published milestoneCouncil source

Application summary

Status
Decision Made
Application type
Not published
Received
4 Oct 2024
Validated
Not published
Determination deadline
Not published
Local authority
South Oxfordshire District Council

Application overview

Variation of conditions 2 (Site Location and Development Zones Plan), 4 (Details and Layout of Proposed Infrastructure), 5 (Landscape Specification Plan), 6 (Landscape Maintenance and Management Plan), 7 (Arboricultural Method Statement ), 8 (Construction Environmental Management Plan-Biodiversity), 9 (Biodiversity Enhancement Plan), 10 (Ecological Buffer Zones), 11 (Archaeological Field Evaluation), 12 (Written Scheme of Investigation), 13 (Programme of Archaeological Evaluation), 14 (Construction Traffic Management Plan), 15 (Detailed Surface Drainage Scheme) and 18 (Flood Risk Assessment) pursuant to planning permission reference P20/S3245/FUL. (The construction and operation of a solar photovoltaic farm and associated infrastructure, including inverters, substation compound, security cameras, fencing, access tracks and landscaping). (As updated by plans and documents received 23 October 2024, 25 February 2025, 14 March 2025, 04 April 2025, 13 May 2025 and 27 June 2025.)

Proposal details

Reference
P24/S1717/S73
Agent
Louise Braine

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Harlesford Farm, near Tetsworth, Oxfordshire, OX9 7BX

This record has no verified map location.

Documents 85 of 85

DocumentPublishedAction
Application FormApplication FormNot publishedView
Great crested newts - NSP Report Harlesford Farm Solar Site 202011003Other Plans/InformationNot publishedView
Great crested newts - 73 Impact Plan V06Other Plans/InformationNot publishedView
2025-02-25 Cover LetterOther Plans/InformationNot publishedView
SUPERSEDED Landscape Maintenance Rev B March 2025 V1Other Plans/InformationNot publishedView
SUPERSEDED Landscaping Specification Substation Detail drwgno LS01.1 Rev DOther Plans/InformationNot publishedView
SUPERSEDED Landscaping Specification drwgno LS01 Rev DOther Plans/InformationNot publishedView
2025-04-04 Email from AgentOther Plans/InformationNot publishedView
Landscape Maintenance Rev C May 2025 V1Other Plans/InformationNot publishedView
Summary Landscape Management Procedures drwgno LM01Other Plans/InformationNot publishedView
Landscaping Specification Substation Detail drwgno LS01.1 Rev EOther Plans/InformationNot publishedView
Landscaping Specification drwgno LS01 Rev EOther Plans/InformationNot publishedView
Haseley Brook Management PlanOther Plans/InformationNot publishedView
2025-03-14 Email from AgentOther Plans/InformationNot publishedView
2025-05-14 Email from AgentOther Plans/InformationNot publishedView
Flood Risk Assessment Addendum-Issue 2.1-Part 1 of 2Other Plans/InformationNot publishedView
Sustainable Drainage Scheme ISSUE 5.2-Part 2 of 3Other Plans/InformationNot publishedView
SUPERSEDED Landscaping Specification drwgno LS01 Rev BOther Plans/InformationNot publishedView
Flood Risk Assessment Addendum-Issue 2.1-Part 2 of 2Other Plans/InformationNot publishedView
Sustainable Drainage Scheme ISSUE 5.2-Part 3 of 3Other Plans/InformationNot publishedView
Sustainable Drainage Scheme ISSUE 5.2-Part 1 of 3Other Plans/InformationNot publishedView
2024-10-23 Email from AgentOther Plans/InformationNot publishedView
Zone Plan drwgno LCS020-DZ-01 rev 10Other Plans/InformationNot publishedView
SUPERSEDED Landscaping Specification Substation Detail drwgno LS01.1 Rev COther Plans/InformationNot publishedView
Site Layout Plan LCS020-PLE-05 rev 09Other Plans/InformationNot publishedView
SUPERSEDED Landscape Maintenance Feb 2025 V1Other Plans/InformationNot publishedView
SUPERSEDED Landscaping Specification drwgno LS01 Rev COther Plans/InformationNot publishedView
SUPERSEDED Landscaping Specification drwgno LS01 Rev AGeneral PlanNot publishedView
Site Location Plan LCS020-SP-01 rev 01General PlanNot publishedView
SUPERSEDED Site Layout Plan LCS020-PLE-05 rev 08General PlanNot publishedView
SUPERSEDED Zone Plan drwgno LCS020-DZ-01 rev 09General PlanNot publishedView
Security Fence and CCTV Elevation drwgno LCS-SD-04.1 rev 03General PlanNot publishedView
Inverter Station drwgno LCS-SD-35.1 rev 01General PlanNot publishedView
Solar Panel Elevation 2.7mH drwgno LCS-SD-39.1 rev 01General PlanNot publishedView
DNO Access Cross Section drwgno LCS020-SD-04 rev 01General PlanNot publishedView
Inverter Station Front Rear Top Plan drwgno LCS-SD-34.1 rev 01General PlanNot publishedView
Customer Substation Elevations and Dimensions Plan drwgno LCS-SD-02.1 rev 03General PlanNot publishedView
Access Track Cross Section drwgno LCS-SD-06.2 rev 02General PlanNot publishedView
Substation Compound drwgno LCS020-SD-01 rev 01General PlanNot publishedView
OM Building drwgno LCS-SD-36 rev 02General PlanNot publishedView
20ft Spare Parts Container drwgno LCS-SD-33 rev 02General PlanNot publishedView
Customer Control Room drwgno LCS020-SD-06 rev 02General PlanNot publishedView
DNO Substation Elevations drwgno LCS020-SD-05 rev 02General PlanNot publishedView
Harlesford CTMP Addendum Sept 2024Supporting documentationNot publishedView
CEMP Biodiversity Part 1 Rev cSupporting documentationNot publishedView
Biodiversity Enhancement Plan BEP Appendix 2 & 3 Rev cSupporting documentationNot publishedView
Biodiversity Enhancement Plan BEP Rev cSupporting documentationNot publishedView
CEMP Biodiversity Part 2 Rev cSupporting documentationNot publishedView
CEMP Biodiversity Part 3 Rev cSupporting documentationNot publishedView
Biodiversity Enhancement Plan BEP Appendix 1 Rev cSupporting documentationNot publishedView
Biodiversity Enhancement Plan BEP Plans Rev cSupporting documentationNot publishedView
Harlesford CTMP Rev cSupporting documentationNot publishedView
Harlesford Solar Farm - Cover Letter 4th October 2024Supporting documentationNot publishedView
Environmental Impact Assessment - Statement of ConformitySupporting documentationNot publishedView
Mitigation Strategy and Written Scheme of InvestigationSupporting documentationNot publishedView
Landscape Maintenance & Management Plan v3Supporting documentationNot publishedView
Arboricultural Method StatementSupporting documentationNot publishedView
Addendum to Ecological Assessment ReportSupporting documentationNot publishedView
SUPERSEDED Sustainable Drainage Scheme D247-DOC01-DISCON 15 - ISSUE 4 - Part 2 of 3Supporting documentationNot publishedView
SUPERSEDED Sustainable Drainage Scheme D247-DOC01-DISCON 15 - ISSUE 4 - Part 3 of 3Supporting documentationNot publishedView
SUPERSEDED Flood Risk Assessment-Part 1Supporting documentationNot publishedView
SUPERSEDED Sustainable Drainage Scheme D247-DOC01-DISCON 15 - ISSUE 4 - Part 1 of 3Supporting documentationNot publishedView
SUPERSEDED Flood Risk Assessment-Part 2Supporting documentationNot publishedView
SUPERSEDED Haseley Brook Management Plan 140323Supporting documentationNot publishedView
Archaeological Evaluation ReportSupporting documentationNot publishedView
Validation ChecklistSupporting documentationNot publishedView
Letter to accompany decision notice P24 S1717 S73DecisionNot publishedView
Site Location Plan LCS020-SP-01 rev 01DecisionNot publishedView
Landscaping Specification drwgno LS01 Rev EDecisionNot publishedView
Decision NoticeDecisionNot publishedView
Delegated ReportDecisionNot publishedView
Solar Panel Elevation 2.7mH drwgno LCS-SD-39.1 rev 01DecisionNot publishedView
Inverter Station drwgno LCS-SD-35.1 rev 01DecisionNot publishedView
Access Track Cross Section drwgno LCS-SD-06.2 rev 02DecisionNot publishedView
Security Fence and CCTV Elevation drwgno LCS-SD-04.1 rev 03DecisionNot publishedView
Inverter Station Front Rear Top Plan drwgno LCS-SD-34.1 rev 01DecisionNot publishedView
Customer Substation Elevations and Dimensions Plan drwgno LCS-SD-02.1 rev 03DecisionNot publishedView
Substation Compound drwgno LCS020-SD-01 rev 01DecisionNot publishedView
OM Building drwgno LCS-SD-36 rev 02DecisionNot publishedView
DNO Access Cross Section drwgno LCS020-SD-04 rev 01DecisionNot publishedView
20ft Spare Parts Container drwgno LCS-SD-33 rev 02DecisionNot publishedView
Zone Plan drwgno LCS020-DZ-01 rev 10DecisionNot publishedView
Site Layout Plan LCS020-PLE-05 rev 09DecisionNot publishedView
Customer Control Room drwgno LCS020-SD-06 rev 02DecisionNot publishedView
DNO Substation Elevations drwgno LCS020-SD-05 rev 02DecisionNot publishedView

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Planning Permission is Granted
Letter to accompany decision notice P24 S1717 S73 Site Location Plan LCS020-SP-01 rev 01 Landscaping Specification drwgno LS01 Rev E Decision Notice Delegated Report Solar Panel Elevation 2.7mH drwgno LCS-SD-39.1 rev 01 Inverter Station drwgno LCS-SD-35.1 rev 01 Access Track Cross Section drwgno LCS-SD-06.2 rev 02 Security Fence and CCTV Elevation drwgno LCS-SD-04.1 rev 03 Inverter Station Front Rear Top Plan drwgno LCS-SD-34.1 rev 01 Customer Substation Elevations and Dimensions Plan drwgno LCS-SD-02.1 rev 03 Substation Compound drwgno LCS020-SD-01 rev 01 OM Building drwgno LCS-SD-36 rev 02 DNO Access Cross Section drwgno LCS020-SD-04 rev 01 20ft Spare Parts Container drwgno LCS-SD-33 rev 02 Zone Plan drwgno LCS020-DZ-01 rev 10 Site Layout Plan LCS020-PLE-05 rev 09 Customer Control Room drwgno LCS020-SD-06 rev 02 DNO Substation Elevations drwgno LCS020-SD-05 rev 02
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.