Council planning record

Extraction of coal and other minerals by opencast methods, retention and modification of conveyor, retention and extension to coal dispatch area and restoration to grazing land and nature conservation (Section 42 application to amend conditions 2 and 25 of CL/11/0198 to amend internal coal haulage from conveyor to road haulage)

Glentaggart East Land Lying South Of Townhead And Weston Woods Near Douglas

WithdrawnReference: CL/16/0051South Lanarkshire

Last published check: 16 Oct 2026, 13:57. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Last Advertised In Press Date

    Published milestoneCouncil source
  4. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Standard Consultation Date

    Published milestoneCouncil source
  7. Decision Issued Date

    Published milestoneCouncil source
  8. Decision Made Date

    Published milestoneCouncil source
  9. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  10. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Permission Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Withdrawn
Application type
Further application
Received
16 Feb 2016
Validated
17 Feb 2016
Determination deadline
17 Apr 2016
Local authority
South Lanarkshire

Application overview

Extraction of coal and other minerals by opencast methods, retention and modification of conveyor, retention and extension to coal dispatch area and restoration to grazing land and nature conservation (Section 42 application to amend conditions 2 and 25 of CL/11/0198 to amend internal coal haulage from conveyor to road haulage)

Proposal details

Reference
CL/16/0051
Alternative references
100002729-001
Ward
04 Clydesdale South
Agent
Hargreaves Surface Mining Limited

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Glentaggart East Land Lying South Of Townhead And Weston Woods Near Douglas

This record has no verified map location.

View council map

Documents 293 of 293

DocumentPublishedAction
Withdrawal of application by applicantDecision18 Feb 2020View
Officer reportP-Application Mail1 Jun 2016View
P - additional transportation information - haulage routeP-Supporting Information4 Mar 2016View
Consultation response - historic scotlandP-Consultations · PDF3 Mar 2016View
Consultation response - west of scotland archaeology serviceP-Consultations · PDF3 Mar 2016View
Consultation response - sepaP-Consultations · PDF3 Mar 2016View
Consultation response - the coal authorityP-Consultations · PDF25 Feb 2016View
Neighbour notification notice (new)P-Application Mail19 Feb 2016View
AdvertP-Application Mail19 Feb 2016View
Valid letterP-Application Mail19 Feb 2016View
R - appendix 4 - assessment of emissions from mobile plant-vpdfP-R-Supporting Information · PDF18 Feb 2016View
R - app 13 land capability for agriculture and peat resource analysis-vpdfP-R-Supporting Information · PDF18 Feb 2016View
R - appendix 1 - gte planning consent cl.11P-R-Supporting Information · PDF18 Feb 2016View
R - app 2 - scoping responses-vpdfP-R-Supporting Information · PDF18 Feb 2016View
R - appendix 5 - revised noise assessmentP-R-Supporting Information · PDF18 Feb 2016View
R - transport reportP-R-Supporting Information · PDF18 Feb 2016View
R - appendix 3 - red moss dust impact assessment report-vpdfP-R-Supporting Information · PDF18 Feb 2016View
R - pac appendix b - pre-application consultation-vpdfP-R-Supporting Information · PDF18 Feb 2016View
R - appendix 1 - noise assessment letterP-R-Supporting Information · PDF18 Feb 2016View
R - extraction of coal (cl-11-0198)P-R-Supporting Information · PDF18 Feb 2016View
R - appendix 1 - planning consent (cl-11-0198)P-R-Supporting Information · PDF18 Feb 2016View
R - planning condition submissionto slc 17.7P-R-Supporting Information · PDF18 Feb 2016View
Red moss dust impact assessment report-vpdfP-R-Supporting Information · PDF18 Feb 2016View
R - app 11 sepa responses-vpdfP-R-Supporting Information · PDF18 Feb 2016View
Glentaggart east additional informationP-Supporting Information · PDF17 Feb 2016View
4.10b weston hill (enlarged)P-Supporting Information · PDF17 Feb 2016View
Es figure 16.1 communities within 5kmP-Supporting Information · PDF17 Feb 2016View
27530_figure 6 �?? indicative layout 6 months a3 (1)P-Supporting Information · PDF17 Feb 2016View
Figure 2 option 2 conveyor and dump truckP-Supporting Information · PDF17 Feb 2016View
4.11a pagie hillP-Supporting Information · PDF17 Feb 2016View
4.14b viewpoint 5 glepsin, hillview crescent (enlarged photomontage)P-Supporting Information · PDF17 Feb 2016View
Enzygo hydraulic modelling reportlP-Supporting Information · PDF17 Feb 2016View
Es figure 12.1 surface water monitoring points and catchment areasP-Supporting Information · PDF17 Feb 2016View
6.3 - shiel burn - cross-sections_3P-Supporting Information · PDF17 Feb 2016View
Figure 5 option 5 north to to a70P-Supporting Information · PDF17 Feb 2016View
27543 rev a_figure 16 - restoration proposals a3 (1)P-Supporting Information · PDF17 Feb 2016View
Es figure 11.3 hydrogeology plan shwing groundwater contoursP-Supporting Information · PDF17 Feb 2016View
Pac appendix f - pre-application consultationP-Supporting Information · PDF17 Feb 2016View
Es figure 3.2 geological cross sectionsP-Supporting Information · PDF17 Feb 2016View
Wmp figure 9 indicative layout 84 monthsP-Supporting Information · PDF17 Feb 2016View
10.1 - shiel burn diversion 1 plan and cross-sectionsP-Supporting Information · PDF17 Feb 2016View
Ps figure 16 restoration proposalsP-Supporting Information · PDF17 Feb 2016View
Es figure 3.4e indicative layout 48 monthsP-Supporting Information · PDF17 Feb 2016View
4.16b prow near crawfordjohn (enlarged)P-Supporting Information · PDF17 Feb 2016View
4.17a viewpoint 8 hagshaw hill wind farmP-Supporting Information · PDF17 Feb 2016View
Figure 9 �?? indicative layout 36 months a3 (1) 27533P-Supporting Information · PDF17 Feb 2016View
Figure 1 option 1 conveyor to kennoxP-Supporting Information · PDF17 Feb 2016View
27535_figure 11 �?? indicative layout 60 months a3 (1)P-Supporting Information · PDF17 Feb 2016View
Es figure 11.2 geology mapP-Supporting Information · PDF17 Feb 2016View
Es figure 3.6 mid rig site support areaP-Supporting Information · PDF17 Feb 2016View
Appendix 5.1 bmwp pressure sensitivity scores for individual taxaP-Supporting Information · PDF17 Feb 2016View
AppendicesP-Supporting Information · PDF17 Feb 2016View
Glentaggart east surface groundwater management plan_v3-coP-Supporting Information · PDF17 Feb 2016View
4.15a station road near scrogton farmP-Supporting Information · PDF17 Feb 2016View
4.14a glespin hillview crescentP-Supporting Information · PDF17 Feb 2016View
Es figure 10.2 - automatic traffic counter locationsP-Supporting Information · PDF17 Feb 2016View
4.15b viewpoint 6 station road near scrogton farm (enlarged photomontage)P-Supporting Information · PDF17 Feb 2016View
Chapter 16 - cumulative effectsP-Supporting Information · PDF17 Feb 2016View
Es figure 11.5 dewatering zone of influenceP-Supporting Information · PDF17 Feb 2016View
Ps figure 2 site planP-Supporting Information · PDF17 Feb 2016View
4.16a prow near crawfordjohnP-Supporting Information · PDF17 Feb 2016View
Chapter 2 - eia scoping processP-Supporting Information · PDF17 Feb 2016View
Figure 16 rev a- restoration proposalsP-Supporting Information · PDF17 Feb 2016View
Fra drawingsP-Supporting Information · PDF17 Feb 2016View
4.5 landscape planning designationsP-Supporting Information · PDF17 Feb 2016View
Figure 8 �?? indicative layout 24 months a3 (1) 27532P-Supporting Information · PDF17 Feb 2016View
4.8 landscape section (a-a)P-Supporting Information · PDF17 Feb 2016View
Es figure 9.1 sensory receptors - air qualityP-Supporting Information · PDF17 Feb 2016View
Assesment of likely significant effectP-Supporting Information · PDF17 Feb 2016View
Transport statement-vpdfP-Supporting Information · PDF17 Feb 2016View
Ps figure 13 indicative layout 84 monthsP-Supporting Information · PDF17 Feb 2016View
Appendix 3 - floodingP-Supporting Information · PDF17 Feb 2016View
4.7 landscape mitigationP-Supporting Information · PDF17 Feb 2016View
Figure 14.1 cultural heritage internal and external receptoP-Supporting Information · PDF17 Feb 2016View
005 site featuresP-Supporting Information · PDF17 Feb 2016View
Ps figure 11 indicative layout 60 monthsP-Supporting Information · PDF17 Feb 2016View
Chapter 4 - lansdcape and visual amenityP-Supporting Information · PDF17 Feb 2016View
6.4 - shiel burn - cross-sections_4P-Supporting Information · PDF17 Feb 2016View
27537_figure 13 �?? indicative layout 84 months a3 (1)P-Supporting Information · PDF17 Feb 2016View
Chapter 8 - vibrationP-Supporting Information · PDF17 Feb 2016View
Es figure 6.7 glentaggart surface mine restoration schemeP-Supporting Information · PDF17 Feb 2016View
Chapter 9 - air qualityP-Supporting Information · PDF17 Feb 2016View
9.1 - moss burn - cross-sections_1P-Supporting Information · PDF17 Feb 2016View
Glentaggart east planning statementP-Supporting Information · PDF17 Feb 2016View
Ps figure 18 mid rig site support areaP-Supporting Information · PDF17 Feb 2016View
Chapter 11 - geology and hydrogeologyP-Supporting Information · PDF17 Feb 2016View
Ps figure 7 indicative layout 12 monthsP-Supporting Information · PDF17 Feb 2016View
4.17b hagshaw hill wind farm (enlarged)P-Supporting Information · PDF17 Feb 2016View
10.3 - shiel burn diversion 2 additional cross-sectionsP-Supporting Information · PDF17 Feb 2016View
Chapter 6 - ornithologyP-Supporting Information · PDF17 Feb 2016View
Chapter 10 - transportation and accessP-Supporting Information · PDF17 Feb 2016View
002 application boundaryP-Supporting Information · PDF17 Feb 2016View
Chapter 3 - project descriptionP-Supporting Information · PDF17 Feb 2016View
004 peat depth contoursP-Supporting Information · PDF17 Feb 2016View
27540_figure 2 �?? site plan a3 (1)P-Supporting Information · PDF17 Feb 2016View
Non-technical summaryP-Supporting Information · PDF17 Feb 2016View
6.5 - shiel burn - cross-sections_5P-Supporting Information · PDF17 Feb 2016View
Figure 11 �?? indicative layout 60 months a3 (1) 27535P-Supporting Information · PDF17 Feb 2016View
Appendix 2 - andershaw access road location planP-Supporting Information · PDF17 Feb 2016View
Ps figure 1 location planP-Supporting Information · PDF17 Feb 2016View
6.2 - shiel burn - cross-sections_2P-Supporting Information · PDF17 Feb 2016View
4.9 landscape section (b-b)P-Supporting Information · PDF17 Feb 2016View
27535_figure 11 �?? indicative layout 60 months a3 (1)P-Supporting Information · PDF17 Feb 2016View
Pac appendix c - pre-application consultationP-Supporting Information · PDF17 Feb 2016View
Revised ecology chapterP-Supporting Information · PDF17 Feb 2016View
Appendix 2_water quality sampling dataP-Supporting Information · PDF17 Feb 2016View
Es figure 3.4h indicative layout 84 monthsP-Supporting Information · PDF17 Feb 2016View
Wmp figure 12 existing ground conditionsP-Supporting Information · PDF17 Feb 2016View
27534_figure 10 �?? indicative layout 48 months a3 (1)P-Supporting Information · PDF17 Feb 2016View
27536_figure 12 �?? indicative layout 72 months a3 (1)P-Supporting Information · PDF17 Feb 2016View
Ps figure 15 geological cross sectionsP-Supporting Information · PDF17 Feb 2016View
Es figure 14.1 cultural heritage internal and external receptorsP-Supporting Information · PDF17 Feb 2016View
ContentsP-Supporting Information · PDF17 Feb 2016View
Es figure 1.2 site planP-Supporting Information · PDF17 Feb 2016View
Chapter 15 - economic and community effectsP-Supporting Information · PDF17 Feb 2016View
5.2 - shiel burn - long-section_2P-Supporting Information · PDF17 Feb 2016View
4.17a hagshaw hill wind farmP-Supporting Information · PDF17 Feb 2016View
Wmp figure 7 indicative layout 60 monthsP-Supporting Information · PDF17 Feb 2016View
Ps figure 12 indicative layout 72 monthsP-Supporting Information · PDF17 Feb 2016View
4.4 detailed landscape characterP-Supporting Information · PDF17 Feb 2016View
Figure 1 �?? location planP-Supporting Information · PDF17 Feb 2016View
Flood risk assessmentP-Supporting Information · PDF17 Feb 2016View
Chapter 15 - economic and community effectsP-Supporting Information · PDF17 Feb 2016View
Chapter 5 - updated ecologyP-Supporting Information · PDF17 Feb 2016View
Es figure 3.3 generalised vertical sectionP-Supporting Information · PDF17 Feb 2016View
4.11b viewpoint 2 pagie hill (enlarged photomontage)P-Supporting Information · PDF17 Feb 2016View
Appendix 1 sepa correspondenceP-Supporting Information · PDF17 Feb 2016View
App 12.3 water quality sampling dataP-Supporting Information · PDF17 Feb 2016View
10.2 - shiel burn diversion 2 plan and cross-sectionsP-Supporting Information · PDF17 Feb 2016View
Pac appendix e - pre-application consultationP-Supporting Information · PDF17 Feb 2016View
Ps figure 4 aerial viewsP-Supporting Information · PDF17 Feb 2016View
Pac appendix d - pre-application consultationP-Supporting Information · PDF17 Feb 2016View
Es figure 1.1 location planP-Supporting Information · PDF17 Feb 2016View
Chapter 14 - cultural heritageP-Supporting Information · PDF17 Feb 2016View
WheelwashP-Supporting Information · PDF17 Feb 2016View
Es figure 3.4g indicative layout 72 monthsP-Supporting Information · PDF17 Feb 2016View
Es figure 5.2 nature conservation sites within 5kmP-Supporting Information · PDF17 Feb 2016View
001 site locationP-Supporting Information · PDF17 Feb 2016View
Es figure 11.1 licensed and private abstractionsP-Supporting Information · PDF17 Feb 2016View
27530_figure 6 �?? indicative layout 6 months a3 (1)P-Supporting Information · PDF17 Feb 2016View
Chapter 9 - air qualityP-Supporting Information · PDF17 Feb 2016View
Ps figure 6 indicative layout 6 monthsP-Supporting Information · PDF17 Feb 2016View
Appendix - pac reportP-Supporting Information · PDF17 Feb 2016View
4.10b viewpoint 1 weston hill (enlarged photomontage)P-Supporting Information · PDF17 Feb 2016View
Shiel burn geomorphhological studyP-Supporting Information · PDF17 Feb 2016View
Chapter 12 -hydrologyP-Supporting Information · PDF17 Feb 2016View
Figure 2 aquatic macro invertebrate survey 2011 a3P-Supporting Information · PDF17 Feb 2016View
Es figure 12.2 sepa gauging stations and surface water abstraction locationsP-Supporting Information · PDF17 Feb 2016View
4.10a viewpoint 1 weston hillP-Supporting Information · PDF17 Feb 2016View
27541_figure 14 �?? geological plan a3 (1)P-Supporting Information · PDF17 Feb 2016View
Glentaggart east planning statement april 2011aP-Supporting Information · PDF17 Feb 2016View
Archaeological wsiP-Supporting Information · PDF17 Feb 2016View
9.3 - moss burn - cross-sections_3P-Supporting Information · PDF17 Feb 2016View
Wmp figure 4 indicative layout 24 monthsP-Supporting Information · PDF17 Feb 2016View
App 14.1 and app 14.2P-Supporting Information · PDF17 Feb 2016View
Chapter 13 - soils and agricultureP-Supporting Information · PDF17 Feb 2016View
7.0 - moss burn - plan viewP-Supporting Information · PDF17 Feb 2016View
4.7 landscape mitigationP-Supporting Information · PDF17 Feb 2016View
Ps figure 17 peat retention bundP-Supporting Information · PDF17 Feb 2016View
Chapter 12 - hydrologyP-Supporting Information · PDF17 Feb 2016View
Ps figure 9 indicative layout 36 monthsP-Supporting Information · PDF17 Feb 2016View
4.3 landscape character typesP-Supporting Information · PDF17 Feb 2016View
Fra appendices 1 to 5P-Supporting Information · PDF17 Feb 2016View
10.4 - shiel burn diversion 2 planP-Supporting Information · PDF17 Feb 2016View
Wmp figure 8 indicative layout 60 monthsP-Supporting Information · PDF17 Feb 2016View
Landscape & visualP-Supporting Information · PDF17 Feb 2016View
6.1 - shiel burn - cross-sections_1P-Supporting Information · PDF17 Feb 2016View
Figure 6 �?? indicative layout 6 months a3 (1)P-Supporting Information · PDF17 Feb 2016View
4.16a viewpoint 7 prow near crawfordjohnP-Supporting Information · PDF17 Feb 2016View
Es figure 3.5 peat bund cross sectionP-Supporting Information · PDF17 Feb 2016View
App 7.1 and app 7.2 - noise monitoringP-Supporting Information · PDF17 Feb 2016View
Ps figure 8 indicative layout 24 monthsP-Supporting Information · PDF17 Feb 2016View
Appendix c - wmp figure 11 waste facility areasP-Supporting Information · PDF17 Feb 2016View
8.0 - moss burn - long-sectionP-Supporting Information · PDF17 Feb 2016View
Pac appendix g - pre-application consultationP-Supporting Information · PDF17 Feb 2016View
Wmp figure 3 indicative layout 12 monthsP-Supporting Information · PDF17 Feb 2016View
Es figure 3.7 restoration proposalsP-Supporting Information · PDF17 Feb 2016View
Es figure 6.1 andershaw and glentaggart windfarms bird survey areaP-Supporting Information · PDF17 Feb 2016View
Figure 7 �?? indicative layout 12 months a3 (1) 27531P-Supporting Information · PDF17 Feb 2016View
4.16b viewpoint 7 prow near crawfordjohn (enlarged photomontage)P-Supporting Information · PDF17 Feb 2016View
27542_ figure 15 �?? geological cross sections a3 (1)P-Supporting Information · PDF17 Feb 2016View
Figure 13 �?? indicative layout 84 months a3 (1) 27537P-Supporting Information · PDF17 Feb 2016View
Figure 4 option 4 c15 to a70P-Supporting Information · PDF17 Feb 2016View
Figure 10 �?? indicative layout 48 months a3 (1) 27534P-Supporting Information · PDF17 Feb 2016View
Chapter 3 - project descriptionP-Supporting Information · PDF17 Feb 2016View
4.1 landscape and visual study areaP-Supporting Information · PDF17 Feb 2016View
Chapter 4 - landscape and visual amenityP-Supporting Information · PDF17 Feb 2016View
Figure 2 surface water monitoring locations a2P-Supporting Information · PDF17 Feb 2016View
Figure 1 �?? location plan 27538P-Supporting Information · PDF17 Feb 2016View
Es figure 3.4d indicative layout 36 monthsP-Supporting Information · PDF17 Feb 2016View
4.9 cross section b-bP-Supporting Information · PDF17 Feb 2016View
Chapter 6 - updated ornithologyP-Supporting Information · PDF17 Feb 2016View
Chapter 5 - ecologyP-Supporting Information · PDF17 Feb 2016View
Ps figure 10 indicative layout 48 monthsP-Supporting Information · PDF17 Feb 2016View
27532_figure 8 �?? indicative layout 24 months a3 (1)P-Supporting Information · PDF17 Feb 2016View
Wmp figure 5 indicative layout 36 monthsP-Supporting Information · PDF17 Feb 2016View
Es figure 16.2 cumulative sitesP-Supporting Information · PDF17 Feb 2016View
Cover pageP-Supporting Information · PDF17 Feb 2016View
Es figure 1.5 indicative site layoutP-Supporting Information · PDF17 Feb 2016View
App 11.3 permeability and dewatering calculationsP-Supporting Information · PDF17 Feb 2016View
Chapter 14 - cultural heritageP-Supporting Information · PDF17 Feb 2016View
Non technical summaryP-Supporting Information · PDF17 Feb 2016View
Ps figure 14 geological planP-Supporting Information · PDF17 Feb 2016View
4.12a viewpoint 3 a70, near earls mill junctionP-Supporting Information · PDF17 Feb 2016View
27534_figure 10 �?? indicative layout 48 months a3 (1)P-Supporting Information · PDF17 Feb 2016View
4.14a viewpoint 5 glepsin, hillview crescentP-Supporting Information · PDF17 Feb 2016View
Chapter 7 - noiseP-Supporting Information · PDF17 Feb 2016View
Chapter 1 - hsml introductionP-Supporting Information · PDF17 Feb 2016View
Es figure 6.3 viewsheds from vantage points winter 2010-11P-Supporting Information · PDF17 Feb 2016View
Es figure 3.4b indicative layout 12 monthsP-Supporting Information · PDF17 Feb 2016View
Figure 12 �?? indicative layout 72 months a3 (1) 27536P-Supporting Information · PDF17 Feb 2016View
Figure 2.1 designated areasP-Supporting Information · PDF17 Feb 2016View
Es figure 3.4c indicative layout 24 monthsP-Supporting Information · PDF17 Feb 2016View
4.2 zone of theoretical visibility with viewpoint locationsP-Supporting Information · PDF17 Feb 2016View
27537_figure 13 �?? indicative layout 84 months a3 (1)P-Supporting Information · PDF17 Feb 2016View
Chapter 2 -environmental impact assessment & scoping responsesP-Supporting Information · PDF17 Feb 2016View
Es figure 1.4b aerial viewsP-Supporting Information · PDF17 Feb 2016View
10.5 - shiel burn diversion 2 cross-sectionsP-Supporting Information · PDF17 Feb 2016View
27531_figure 7 �?? indicative layout 12 months a3 (1)P-Supporting Information · PDF17 Feb 2016View
4.11b a70pagie hill (enlarged))P-Supporting Information · PDF17 Feb 2016View
003 land capability classificationP-Supporting Information · PDF17 Feb 2016View
App 10 - transport statementP-Supporting Information · PDF17 Feb 2016View
Es figure 8.1 sensory receptors - vibrationP-Supporting Information · PDF17 Feb 2016View
5.1 - shiel burn - long-section_1P-Supporting Information · PDF17 Feb 2016View
Ps figure 3 aerial photograph and indicative site layoutP-Supporting Information · PDF17 Feb 2016View
4.8 cross section a-aP-Supporting Information · PDF17 Feb 2016View
Es figure 7.1 sensory receptors - noiseP-Supporting Information · PDF17 Feb 2016View
11.0 - moss burn diversion 3P-Supporting Information · PDF17 Feb 2016View
Chapter 13 - soils and agricultureP-Supporting Information · PDF17 Feb 2016View
Es figure 3.4a indicative layout 6 monthsP-Supporting Information · PDF17 Feb 2016View
4.15b station road near scrogton farm (enlarged)P-Supporting Information · PDF17 Feb 2016View
Figure 1-5 �?? indicative site layoutP-Supporting Information · PDF17 Feb 2016View
27532_figure 8 �?? indicative layout 24 months a3 (1)P-Supporting Information · PDF17 Feb 2016View
Waste management planP-Supporting Information · PDF17 Feb 2016View
Es figure 3.1 geological planP-Supporting Information · PDF17 Feb 2016View
27531_figure 7 �?? indicative layout 12 months a3 (1)P-Supporting Information · PDF17 Feb 2016View
4.14b glespin hillview crescent (enlarged)P-Supporting Information · PDF17 Feb 2016View
Es figure 1.3 aerial photographP-Supporting Information · PDF17 Feb 2016View
Wmp figure 2 indicative layout 6 monthsP-Supporting Information · PDF17 Feb 2016View
4.6 cumulative mineral sitesP-Supporting Information · PDF17 Feb 2016View
Figure 1-5 �?? indicative site layout 27539P-Supporting Information · PDF17 Feb 2016View
Figure 1 groundwater monitoring locations a3P-Supporting Information · PDF17 Feb 2016View
4.15a viewpoint 6 station road near scrogton farmP-Supporting Information · PDF17 Feb 2016View
Es figure 5.1 survey boundariesP-Supporting Information · PDF17 Feb 2016View
Appendix 2 - andershaw access roadP-Supporting Information · PDF17 Feb 2016View
Figure 3 option 3 dump truckP-Supporting Information · PDF17 Feb 2016View
Glentaggart east gw and sw mgt plan cov pageP-Supporting Information · PDF17 Feb 2016View
Chapter 8 - vibrationP-Supporting Information · PDF17 Feb 2016View
4.12b a70 near earls mill junction (enlarged)P-Supporting Information · PDF17 Feb 2016View
4.13a b7078 & national cycle route 74P-Supporting Information · PDF17 Feb 2016View
4.0 - shiel burn - plan viewP-Supporting Information · PDF17 Feb 2016View
App 9.2 - monitoring and management schemeP-Supporting Information · PDF17 Feb 2016View
Appendix 6P-Supporting Information · PDF17 Feb 2016View
27536_figure 12 �?? indicative layout 72 months a3 (1)P-Supporting Information · PDF17 Feb 2016View
4.17b viewpoint 8 hagshaw hill wind farm (enlarged photomontage)P-Supporting Information · PDF17 Feb 2016View
Es figure 1.4a photographs-vpdfP-Supporting Information · PDF17 Feb 2016View
Es figure 10.1 access optionsP-Supporting Information · PDF17 Feb 2016View
6.7 - shiel burn - cross-sections_7P-Supporting Information · PDF17 Feb 2016View
Es figure 11.4 cross sections showing groundwater levelsP-Supporting Information · PDF17 Feb 2016View
Appendix 8- figure 3.4f indicative layout 60 monthsP-Supporting Information · PDF17 Feb 2016View
Es figure 3.4f indicative layout 60 monthsP-Supporting Information · PDF17 Feb 2016View
6.6 - shiel burn - cross-sections_6P-Supporting Information · PDF17 Feb 2016View
4.2 ztv + vpsP-Supporting Information · PDF17 Feb 2016View
Figure 1 habitat surveyP-Supporting Information · PDF17 Feb 2016View
Glentaggart east - ornithology chapter review final 28-01-2016P-Supporting Information · PDF17 Feb 2016View
Appendix 2 - andershaw access road cross sectionsP-Supporting Information · PDF17 Feb 2016View
Appendix 7 - scottish waterP-Supporting Information · PDF17 Feb 2016View
Wmp figure 1 indicative site layoutP-Supporting Information · PDF17 Feb 2016View
4.12a a70 near earls mill junctionP-Supporting Information · PDF17 Feb 2016View
4.12b viewpoint 3 a70, near earls mill junction (enlarged photomontage)P-Supporting Information · PDF17 Feb 2016View
4.13a viewpoint 4 b7078 national cycle route 74P-Supporting Information · PDF17 Feb 2016View
Pac appendix a - pre-application consultationP-Supporting Information · PDF17 Feb 2016View
4.13b viewpoint 4 b7078 national cycle route 74 (enlarged photomontage)P-Supporting Information · PDF17 Feb 2016View
27533_figure 9 �?? indicative layout 36 months a3 (1)P-Supporting Information · PDF17 Feb 2016View
9.2 - moss burn - cross-sections_2P-Supporting Information · PDF17 Feb 2016View
27533_figure 9 �?? indicative layout 36 months a3 (1)P-Supporting Information · PDF17 Feb 2016View
Chapter 7 - noise assessmentP-Supporting Information · PDF17 Feb 2016View
Chapter 10 - hsml transportation and accessP-Supporting Information · PDF17 Feb 2016View
Es figure 9.2 drumalbin wind roseP-Supporting Information · PDF17 Feb 2016View
App 11.2 backfill risk assessmentP-Supporting Information · PDF17 Feb 2016View
Wmp figure 6 indicative layout 48 monthsP-Supporting Information · PDF17 Feb 2016View
R - application formP-R-Application Form · PDF17 Feb 2016View
Chapter 11 - geology and hydrogeologyP-Supporting Information · PDF17 Feb 2016View
4.13b b7078 & national cycle route 74 (enlarged)P-Supporting Information · PDF17 Feb 2016View
Chapter 1 - introductionP-Supporting Information · PDF17 Feb 2016View
4.10a weston hillP-Supporting Information · PDF17 Feb 2016View
Geomorphological drawings 1 to 6P-Supporting Information · PDF17 Feb 2016View
Chapter16 - cumulative effectsP-Supporting Information · PDF17 Feb 2016View
Ps figure 5 designated areasP-Supporting Information · PDF17 Feb 2016View
4.11a viewpoint 2 pagie hillP-Supporting Information · PDF17 Feb 2016View
Wmp figure 10 restoration proposalsP-Supporting Information · PDF17 Feb 2016View
Neighbour notification mapGeneral Documents16 Feb 2016View
Application summaryP-Application Mail · PDF16 Feb 2016View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Application withdrawn
Withdrawal of application by applicant
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.