Council planning record

Erection of 15 wind turbines (maximum height to tip 126.5m), access tracks, substation and other associated infrastructure and wood fuel drying facility

Douglas West And Dalquhandy DP Renewable Energy Project Former Dalquhandy Opencast Coal Site West Of Junction 11 Of M74

DecidedReference: CL/15/0273South Lanarkshire

Last published check: 17 Oct 2026, 08:55. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Last Advertised In Press Date

    Published milestoneCouncil source
  4. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Decision Issued Date

    Published milestoneCouncil source
  7. Decision Made Date

    Published milestoneCouncil source
  8. Permission Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided
Application type
Detailed planning application
Received
9 Jul 2015
Validated
13 Jul 2015
Determination deadline
13 Nov 2015
Local authority
South Lanarkshire

Application overview

Erection of 15 wind turbines (maximum height to tip 126.5m), access tracks, substation and other associated infrastructure and wood fuel drying facility

Proposal details

Reference
CL/15/0273
Alternative references
000125632001
Ward
04 Clydesdale South
Agent
3R Energy Solutions Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Douglas West And Dalquhandy DP Renewable Energy Project Former Dalquhandy Opencast Coal Site West Of Junction 11 Of M74

This record has no verified map location.

View council map

Documents 303 of 303

DocumentPublishedAction
Figure 3.4 site layout_revision a_170322 - variation - approvedP-Plans · PDF23 Mar 2017View
Consent to vary no.2 approved 21march17P-Variations · PDF22 Mar 2017View
Variation decision notice no.2 march17P-Variations21 Mar 2017View
M16.120.d.004 site plan inc turbine locationsP-Variations · PDF21 Mar 2017View
R - consent to vary no.1 approved 31may16P-R-Variations · PDF7 Jun 2016View
Approved variation - figure 1.3 typical turbine elevation drawing amended dimensP-Plans · PDF31 May 2016View
Approved variation - figure 1.3 typical turbine elevation drawing amended dimensP-Plans · PDF31 May 2016View
Application to vary supporting information no.1 march16P-Variations · PDF13 May 2016View
Appendix 1 1 application to vary figures 1.1 - 1.3P-Variations · PDF13 May 2016View
Appendix 2 1h application to vary figs 2 8 - 2 12P-Variations · PDF13 May 2016View
Appendix 4 1 application to varyP-Variations · PDF13 May 2016View
Appendix 2 1e application to vary figure 2.5P-Variations · PDF13 May 2016View
Appendix 8 1 applicaiton to varyP-Variations · PDF13 May 2016View
Appendix 2 1g application to vary figure 2.7P-Variations · PDF13 May 2016View
Appendix 2 1b application to vary figure 2.2P-Variations · PDF13 May 2016View
Appendix 2 1c application to vary figure 2.3P-Variations · PDF13 May 2016View
Appendix 2 1d application to vary figure 2.4P-Variations · PDF13 May 2016View
Appendix 2 1a application to vary figure 2.1P-Variations · PDF13 May 2016View
Appendix 2 1f application to vary figure 2.6P-Variations · PDF13 May 2016View
Eia final decision advert - lanark gazetteP-R-Application Mail · PDF16 Feb 2016View
Eia final decision advert - edinburgh gazetteP-R-Application Mail · PDF16 Feb 2016View
Decision notice - grant conditional planning permissionP-Application Mail2 Feb 2016View
Compliance with conditions letterP-Application Mail2 Feb 2016View
Decision notice - grant conditional planning permissionP-Application Mail2 Feb 2016View
Consultation response - the coal authorityP-Consultations · PDF6 Nov 2015View
Coal authority letterP-Application Mail30 Oct 2015View
R - consultation response - rspbP-R-Consultations · PDF30 Oct 2015View
R - consultation response nats oct15P-R-Consultations · PDF30 Oct 2015View
Officer reportP-Application Mail29 Oct 2015View
R - representation - derek mcguinnessP-R-Representations · PDF26 Oct 2015View
Consultation response - natsP-Consultations · PDF26 Oct 2015View
Consultation response - the scottish governmentP-Consultations · PDF22 Oct 2015View
R - representation - robin scottP-R-Representations · PDF20 Oct 2015View
Consultation response - scottish natural heritageP-Consultations · PDF19 Oct 2015View
R - correspondence from agentP-R-Application Mail · PDF15 Oct 2015View
Consultation response - sepaP-Consultations · PDF14 Oct 2015View
R - representation - andrew campbellP-R-Representations · PDF13 Oct 2015View
R - representation - allan whiteP-R-Representations · PDF12 Oct 2015View
R - representation - alasdair morrisonP-R-Representations · PDF12 Oct 2015View
R - consultation response - baa glasgow airportP-R-Consultations · PDF25 Sept 2015View
Eia advert - edinburgh gazetteP-R-Application Mail · PDF25 Sept 2015View
Eia press advert - lanark gazetteP-R-Application Mail · PDF23 Sept 2015View
Sei_figure 3 6_2015_wader_atriskP-Supporting Information · PDF22 Sept 2015View
Sei_figure 3 4_2015_goose_atriskP-Supporting Information · PDF22 Sept 2015View
Sei_figure 2 4_2015_btnP-Supporting Information · PDF22 Sept 2015View
Sei_figure 3 1_2015_gooseP-Supporting Information · PDF22 Sept 2015View
Sei_figure 3 7_2015_raptorP-Supporting Information · PDF22 Sept 2015View
Sei_figure 3 8_2015_mbsP-Supporting Information · PDF22 Sept 2015View
Sei_figure 2 2_2015_resultsP-Supporting Information · PDF22 Sept 2015View
Sei_figure 3 2_2015_raptorP-Supporting Information · PDF22 Sept 2015View
Sei_appendix 2 1_bat survey report_150916P-Supporting Information · PDF22 Sept 2015View
Sei_figure 2 3_2015_temporalP-Supporting Information · PDF22 Sept 2015View
Sei_appendix 2 5_snh response 150821P-Supporting Information · PDF22 Sept 2015View
Sei_figure 2 1_2015_smtmP-Supporting Information · PDF22 Sept 2015View
Sei_douglaswest and dal dp_sept 15_finalP-Supporting Information · PDF22 Sept 2015View
Sei_appendix 2 2_sepa response 150813P-Supporting Information · PDF22 Sept 2015View
Sei_appendix 2 3_applicants response to sepa 150824P-Supporting Information · PDF22 Sept 2015View
Sei_figure 3 3_2015_waderP-Supporting Information · PDF22 Sept 2015View
Sei_figure 2 5_2015_bufferzonesP-Supporting Information · PDF22 Sept 2015View
Sei_figure 3 5_2015_raptor_atriskP-Supporting Information · PDF22 Sept 2015View
Sei_contents page_finalP-Supporting Information · PDF22 Sept 2015View
Sei_appendix 2 4_sepa response 150828P-Supporting Information · PDF22 Sept 2015View
Consultation response - the scottish natural hertigateP-Consultations · PDF8 Sept 2015View
R - representation - sabre sysatems uk ltdP-R-Representations · PDF2 Sept 2015View
R - representation - craig drummondP-R-Representations · PDF31 Aug 2015View
Consultation response - sepaP-Consultations · PDF28 Aug 2015View
R - representation - enclosure-tec limitedP-R-Representations · PDF28 Aug 2015View
R - representation - lanark rugby clubP-R-Representations · PDF25 Aug 2015View
R - representation - malcolm scottP-R-Representations · PDF25 Aug 2015View
R - representation - graeme taitP-R-Representations · PDF21 Aug 2015View
R - representation - charlotte taitP-R-Representations · PDF21 Aug 2015View
Representation - amy sutherlandP-Representations · PDF19 Aug 2015View
R - representation - eve trakwayP-R-Representations · PDF18 Aug 2015View
R - representation - neil taitP-R-Representations · PDF18 Aug 2015View
R - representation - hadrian m and eP-R-Representations · PDF18 Aug 2015View
R - representation - maggie martinP-R-Representations · PDF17 Aug 2015View
R - consultation response - ministry of defenceP-R-Consultations · PDF17 Aug 2015View
R - representation - eco-heatplus ltdP-R-Representations · PDF17 Aug 2015View
Consultation response - sepaP-Consultations · PDF14 Aug 2015View
R - representation - r j doak & sons ltdP-R-Representations · PDF14 Aug 2015View
R - representation - mres-vpdfP-R-Representations · PDF14 Aug 2015View
Consultation response - historic scotlandP-Consultations · PDF13 Aug 2015View
Consultation response - west of scotland archaeology serviceP-Consultations · PDF11 Aug 2015View
R - representation - ace contracts scotland ltdP-R-Representations · PDF11 Aug 2015View
R - consultation response - glasgow airportP-R-Consultations · PDF6 Aug 2015View
R - appendix 9.8_noise calibration certs_v1_150616-vpdfP-R-Supporting Information · PDF31 Jul 2015View
R - representation - mrs gillian clementson-vpdfP-R-Representations · PDF31 Jul 2015View
R - appendix 4.2_scoping responses-vpdfP-R-Supporting Information · PDF31 Jul 2015View
Appendix 11.2_flood risk assessment_draft v4P-Supporting Information · PDF30 Jul 2015View
Appendix 9.5_wind directions during surveys_v4P-Supporting Information · PDF30 Jul 2015View
R - consultation response - transport scotlandP-R-Consultations · PDF30 Jul 2015View
Appendix 9.4_noise scatter plots_v4P-Supporting Information · PDF30 Jul 2015View
Appendix 12.1_traffic and trans volumesP-Supporting Information · PDF30 Jul 2015View
Appendix 7.9_species protection planP-Supporting Information · PDF30 Jul 2015View
03 contents pageP-Supporting Information · PDF30 Jul 2015View
Appendix 8.1_ornithology tehchnical report_fullP-Supporting Information · PDF30 Jul 2015View
Appendix 6.4_rvas_lrP-Supporting Information · PDF30 Jul 2015View
Appendix 9.7_information for cumulative noise assessment_v4P-Supporting Information · PDF30 Jul 2015View
Appendix 10.1_he gazetteerP-Supporting Information · PDF30 Jul 2015View
Appendix 6.1_assessment criteriaP-Supporting Information · PDF30 Jul 2015View
Appendix 9.2_noise monit location photos_v4P-Supporting Information · PDF30 Jul 2015View
Press advert - edinburgh gazetteP-R-Application Mail · PDF30 Jul 2015View
Appendix 7.4_gcn edna survey 2015 fullP-Supporting Information · PDF30 Jul 2015View
Appendix 15.1_sf met dataP-Supporting Information · PDF30 Jul 2015View
Appendix 6.2_info for visualisationsP-Supporting Information · PDF30 Jul 2015View
Appendix 9.3_background noise time histories_v4P-Supporting Information · PDF30 Jul 2015View
Appendix 9.1_noise assessment locations_v4P-Supporting Information · PDF30 Jul 2015View
Appendix 7.8_outline habitat management planP-Supporting Information · PDF30 Jul 2015View
Appendix 13.1_responsible contracting policyP-Supporting Information · PDF30 Jul 2015View
Press advert - eia - edinburgh gazetteP-R-Application Mail · PDF30 Jul 2015View
Appendix 6.3_viewpoint assessmentP-Supporting Information · PDF30 Jul 2015View
Appendix 4.3_addiitonal consultation_2015P-Supporting Information · PDF30 Jul 2015View
Appendix 4.1_scoping opinionP-Supporting Information · PDF30 Jul 2015View
Appendix 9.6_predicted noise immission levels_v4P-Supporting Information · PDF30 Jul 2015View
Appendix 7.3_gcn hsi survey 2014_lrP-Supporting Information · PDF30 Jul 2015View
Appendix 7.7_fish surveyP-Supporting Information · PDF30 Jul 2015View
Appendix 15.2_sf graphsP-Supporting Information · PDF30 Jul 2015View
Appendix 3.1_access strategy_lrP-Supporting Information · PDF30 Jul 2015View
Appendix 11.1_water crossing schedule_v4P-Supporting Information · PDF30 Jul 2015View
Appendix 7.1_habitat survey 2014_lrP-Supporting Information · PDF30 Jul 2015View
Consultation response - sp energy networksP-Consultations · PDF23 Jul 2015View
R - representation - peter murrayP-R-Representations · PDF22 Jul 2015View
Press adverts - lanark gazetteP-R-Application Mail · PDF22 Jul 2015View
Press advert - eia - lanark gazetteP-R-Application Mail · PDF22 Jul 2015View
Nats technical reportP-Supporting Information · PDF21 Jul 2015View
Holding response - forestry commission scotlandP-Consultations · PDF21 Jul 2015View
Consultation response - joint radio companyP-Consultations · PDF17 Jul 2015View
Eia valid letterP-Application Mail16 Jul 2015View
AdvertP-Application Mail16 Jul 2015View
R - correspondence from agentP-R-Application Mail · PDF14 Jul 2015View
Figure 15.1 - shadow flicker mapP-Supporting Information · PDF13 Jul 2015View
17 schedule of env commitmentsP-Supporting Information · PDF13 Jul 2015View
Figure 10.5_he earl of angus visual 08.06.15P-Supporting Information · PDF13 Jul 2015View
Figure 1.1 - site location planP-Supporting Information · PDF13 Jul 2015View
Fig 6.56-vp12 cumulative wfr 150515P-Supporting Information · PDF13 Jul 2015View
Figure 3.2 - env designationsP-Supporting Information · PDF13 Jul 2015View
Fig 6.3 other wind farms within 10km 18.06.15 sfsP-Supporting Information · PDF13 Jul 2015View
Vp3 visualisation rev b 19-06-15 sfsP-Supporting Information · PDF13 Jul 2015View
Fig 6.40 -cztv -broken cross 150515 sfsP-Supporting Information · PDF13 Jul 2015View
Vp6 visualisation rev b 19-06-15 sfsP-Supporting Information · PDF13 Jul 2015View
Fig 6.6 landscape character within 10km 21.05.15 sfsP-Supporting Information · PDF13 Jul 2015View
Separate a1 - wfdf_elevation_1P-Supporting Information · PDF13 Jul 2015View
15 shadow flickerP-Supporting Information · PDF13 Jul 2015View
Fig 6.21 topography 21.05.15 sfsP-Supporting Information · PDF13 Jul 2015View
Vp19 visualisation rev b 19-06-15 sfsP-Supporting Information · PDF13 Jul 2015View
Fig 6.11 blade tip ztv nw quadrant 21.05.15 sfsP-Supporting Information · PDF13 Jul 2015View
Fig 6.45-vp01 cumulative wfr 150515P-Supporting Information · PDF13 Jul 2015View
Fig 6.8 blade tip ztv ne quadrant 21.05.15 sfsP-Supporting Information · PDF13 Jul 2015View
07 ecology and nature conservationP-Supporting Information · PDF13 Jul 2015View
Figure 10.1_he study areas_v3P-Supporting Information · PDF13 Jul 2015View
02 design iterationP-Supporting Information · PDF13 Jul 2015View
08 ornithologyP-Supporting Information · PDF13 Jul 2015View
Fig 6.42 -cztv -glentaggart 180515 sfsP-Supporting Information · PDF13 Jul 2015View
Figure 3.13a - wfpf elevationsP-Supporting Information · PDF13 Jul 2015View
Figure 3.4 - site layout planP-Supporting Information · PDF13 Jul 2015View
04 approach to eiaP-Supporting Information · PDF13 Jul 2015View
Vp13 visualisation rev b 19-06-15 sfsP-Supporting Information · PDF13 Jul 2015View
Figure 3.5 - wtg elevationsP-Supporting Information · PDF13 Jul 2015View
Fig 6.16 hub height ztv sw quadrant 21.05.15 sfsP-Supporting Information · PDF13 Jul 2015View
Fig 6.38 -cztv -clyde extension 150515 sfsP-Supporting Information · PDF13 Jul 2015View
Figure 10.3_he middle study area_v3P-Supporting Information · PDF13 Jul 2015View
13 socio-economic tourism and recreationP-Supporting Information · PDF13 Jul 2015View
Vp1 visualisation rev b 19-06-15 sfsP-Supporting Information · PDF13 Jul 2015View
Planning statementP-Supporting Information · PDF13 Jul 2015View
Fig 6.31 -cztv -galawhistle 150515 sfsP-Supporting Information · PDF13 Jul 2015View
Vp14 visualisation rev b 19-06-15 sfsP-Supporting Information · PDF13 Jul 2015View
Figure 7.2_p1hs.mxdP-Supporting Information · PDF13 Jul 2015View
Figure 2.3b - hill street_v1P-Supporting Information · PDF13 Jul 2015View
Vp4 visualisation rev b 19-06-15 sfsP-Supporting Information · PDF13 Jul 2015View
Figure 7.8_batbuffers_dwP-Supporting Information · PDF13 Jul 2015View
00 contents pageP-Supporting Information · PDF13 Jul 2015View
Fig 6.36 -cztv -letham farm etc 150515 sfsP-Supporting Information · PDF13 Jul 2015View
11 hydrology hydrogeology and geologyP-Supporting Information · PDF13 Jul 2015View
Fig 6.10 blade tip ztv sw quadrant 21.05.15 sfsP-Supporting Information · PDF13 Jul 2015View
Fig 6.49-vp05 cumulative wfr 150515P-Supporting Information · PDF13 Jul 2015View
Fig 6.55-vp11 cumulative wfr 180515P-Supporting Information · PDF13 Jul 2015View
Volumes 4b - front covers, contents and minimaps 230615 - sfsP-Supporting Information · PDF13 Jul 2015View
Vp5 visualisation rev b 19-06-15 sfsP-Supporting Information · PDF13 Jul 2015View
Fig 6.25 -cztv - nutberry 150515 sfsP-Supporting Information · PDF13 Jul 2015View
Figure 11.2_superficial deposits_v1P-Supporting Information · PDF13 Jul 2015View
Fig 6.23 viewpoints overlaid on ztv 01.07.15 sfsP-Supporting Information · PDF13 Jul 2015View
Fig 6.17 hub height ztv nw quadrant 21.05.15 sfsP-Supporting Information · PDF13 Jul 2015View
Vp17 visualisation rev b 19-06-15 sfsP-Supporting Information · PDF13 Jul 2015View
Fig 6.26 -cztv - birkhill 150515 sfsP-Supporting Information · PDF13 Jul 2015View
Vp16 visualisation rev b 19-06-15 sfsP-Supporting Information · PDF13 Jul 2015View
18 summary of residual effectsP-Supporting Information · PDF13 Jul 2015View
Separate a1 - wfdf_elevation_2P-Supporting Information · PDF13 Jul 2015View
Pre application consulation report - 54-80P-Supporting Information · PDF13 Jul 2015View
Pre application consultation report 1-53P-Supporting Information · PDF13 Jul 2015View
Fig 6.53-vp09 cumulative wfr 150515P-Supporting Information · PDF13 Jul 2015View
Fig 6.4 landscape designations 24.06.15 sfsP-Supporting Information · PDF13 Jul 2015View
Figure 3.9 - substation and control roomP-Supporting Information · PDF13 Jul 2015View
Figure 7.9_ohmp_management_areasP-Supporting Information · PDF13 Jul 2015View
Figure 1.2 - site layout plan aerialP-Supporting Information · PDF13 Jul 2015View
Vp18 visualisation rev c 01-07-15 sfsP-Supporting Information · PDF13 Jul 2015View
Fig 6.59-vp15 cumulative wfr 150515P-Supporting Information · PDF13 Jul 2015View
Fig 6.24 -cztv - hagsahw hill & ext 180615 sfsP-Supporting Information · PDF13 Jul 2015View
Vp9 visualisation rev b 19-06-15 sfsP-Supporting Information · PDF13 Jul 2015View
12 traffic and transportP-Supporting Information · PDF13 Jul 2015View
Fig 6.14 hub height ztv ne quadrant 21.05.15 sfsP-Supporting Information · PDF13 Jul 2015View
Figure 10.2_he inner study area_v3P-Supporting Information · PDF13 Jul 2015View
Vp7 visualisation rev b 19-06-15 sfsP-Supporting Information · PDF13 Jul 2015View
Figure 3.8 - track and cable designP-Supporting Information · PDF13 Jul 2015View
Figure 10.4_he st brides chapel visual 08.06.15P-Supporting Information · PDF13 Jul 2015View
Vp10 visualisation rev b 19-06-15 sfsP-Supporting Information · PDF13 Jul 2015View
03 proposed developmentP-Supporting Information · PDF13 Jul 2015View
Fig 6.2 other wind farms 35km 18.06.15 sfsP-Supporting Information · PDF13 Jul 2015View
Fig 6.44 -cztv -kype muir ext 150515 sfsP-Supporting Information · PDF13 Jul 2015View
05 energy and planning policyP-Supporting Information · PDF13 Jul 2015View
Fig 6.5 landscape character within 35km 21.05.15 sfsP-Supporting Information · PDF13 Jul 2015View
Fig 6.9 blade tip ztv se quadrant 21.05.15 sfsP-Supporting Information · PDF13 Jul 2015View
Figure 3.7 - access routeP-Supporting Information · PDF13 Jul 2015View
Fig 6.50-vp06 cumulative wfr 150515P-Supporting Information · PDF13 Jul 2015View
09 noise and vibrationP-Supporting Information · PDF13 Jul 2015View
14 aviation radar and telecommunicationsP-Supporting Information · PDF13 Jul 2015View
Figure 11.3_soils_v1P-Supporting Information · PDF13 Jul 2015View
Figure 3.14 - wfdf floor planP-Supporting Information · PDF13 Jul 2015View
Fig 6.12 blade tip ztv 10km centred 21.05.15 sfsP-Supporting Information · PDF13 Jul 2015View
01 introductionP-Supporting Information · PDF13 Jul 2015View
Fig 6.1 site location plan - 21.05.15 sfsP-Supporting Information · PDF13 Jul 2015View
Fig 6.58-vp14 cumulative wfr 190615P-Supporting Information · PDF13 Jul 2015View
Fig 6.27 -cztv - clyde & glenkerie 150515 sfsP-Supporting Information · PDF13 Jul 2015View
Figure 8.2_pdb_sa_dwP-Supporting Information · PDF13 Jul 2015View
Fig 6.52-vp08 cumulative wfr 150515P-Supporting Information · PDF13 Jul 2015View
Fig 6.29 -cztv -dalquhandy 150515 sfsP-Supporting Information · PDF13 Jul 2015View
Figure 7.1_designated sitesP-Supporting Information · PDF13 Jul 2015View
Fig 6.20 local landscape context 22.06.15 sfsP-Supporting Information · PDF13 Jul 2015View
Figure 8.4_lwp_dwP-Supporting Information · PDF13 Jul 2015View
Figure 3.13b - wfpf elevations 2P-Supporting Information · PDF13 Jul 2015View
Fig 6.64-vp20 cumulative wfr 150515P-Supporting Information · PDF13 Jul 2015View
Vp11 visualisation rev b 19-06-15 sfsP-Supporting Information · PDF13 Jul 2015View
Fig 6.32-cztv -auchrobert group 150515 sfsP-Supporting Information · PDF13 Jul 2015View
Fig 6.63-vp19cumulative wfr 150515P-Supporting Information · PDF13 Jul 2015View
Fig 6.34 -cztv -andershaw & middle muir 150515 sfsP-Supporting Information · PDF13 Jul 2015View
02 contents pageP-Supporting Information · PDF13 Jul 2015View
Fig 6.48-vp04 cumulative wfr 150515P-Supporting Information · PDF13 Jul 2015View
Fig 6.37 -cztv -hazelside farm 150515 sfsP-Supporting Information · PDF13 Jul 2015View
Fig 6.43 -cztv -leadhills 150515 sfsP-Supporting Information · PDF13 Jul 2015View
Fig 6.13 hub height ztv to 35km 21.05.15 sfsP-Supporting Information · PDF13 Jul 2015View
Fig 6.62-vp18cumulative wfr 180515P-Supporting Information · PDF13 Jul 2015View
Application formP - Application Form · PDF13 Jul 2015View
Figure 2.2a - turbine layoutsP-Supporting Information · PDF13 Jul 2015View
Fig 6.30 -cztv - poniel 150515 sfsP-Supporting Information · PDF13 Jul 2015View
16 summary of cumulative effectsP-Supporting Information · PDF13 Jul 2015View
Pre application consulation report - 94-106P-Supporting Information · PDF13 Jul 2015View
Figure 2.4 - infrastructure iterationsP-Supporting Information · PDF13 Jul 2015View
Volumes 4a - front covers, contents and minimaps 230615 - sfsP-Supporting Information · PDF13 Jul 2015View
Figure 2.3d - wire from a70 glespin_v1P-Supporting Information · PDF13 Jul 2015View
Fig 6.60-vp16 cumulative wfr 150515P-Supporting Information · PDF13 Jul 2015View
Fig 6.61-vp17cumulative wfr 150515P-Supporting Information · PDF13 Jul 2015View
Swept path analysis of wind turbine - figure 12.1P-Supporting Information · PDF13 Jul 2015View
Vp2 visualisation rev b 19-06-15 sfsP-Supporting Information · PDF13 Jul 2015View
06 landscape and visualP-Supporting Information · PDF13 Jul 2015View
Vp8 visualisation rev b 19-06-15 sfsP-Supporting Information · PDF13 Jul 2015View
Vp15 visualisation rev b 19-06-15 sfsP-Supporting Information · PDF13 Jul 2015View
Figure 3.10 - met mastP-Supporting Information · PDF13 Jul 2015View
Figure 3.12a - wfdf gen layoutP-Supporting Information · PDF13 Jul 2015View
Figure 7.5_gcn_dwP-Supporting Information · PDF13 Jul 2015View
Fig 6.33 -cztv -penbreck 150515 sfsP-Supporting Information · PDF13 Jul 2015View
swept path analysis of wind turbine - figure 12.2P-Supporting Information · PDF13 Jul 2015View
Fig 6.57-vp13 cumulative wfr 150515P-Supporting Information · PDF13 Jul 2015View
Fig 6.41 -cztv - kennoxhead 180515 sfsP-Supporting Information · PDF13 Jul 2015View
Figure 7.3_nvc_dwP-Supporting Information · PDF13 Jul 2015View
Figure 3.3 - cumulative developmentsP-Supporting Information · PDF13 Jul 2015View
Designaccess statementP-Supporting Information · PDF13 Jul 2015View
Fig 6.46-vp02 cumulative wfr 150515P-Supporting Information · PDF13 Jul 2015View
Figure 11.5 bedrock geology_v1P-Supporting Information · PDF13 Jul 2015View
Figure 7.4_gwdte_dwP-Supporting Information · PDF13 Jul 2015View
Fig 6.18 hub height ztv to 10km centred 21.05.15 sfsP-Supporting Information · PDF13 Jul 2015View
Fig 6.28 -cztv - bankend rig 150515 sfsP-Supporting Information · PDF13 Jul 2015View
Figure 2.2b - turbine layoutsP-Supporting Information · PDF13 Jul 2015View
Figure 2.3a - wire from station rd_v2P-Supporting Information · PDF13 Jul 2015View
Pre application consulation report - 81-93P-Supporting Information · PDF13 Jul 2015View
Fig 6.39 -cztv -cumberhead 150515 sfsP-Supporting Information · PDF13 Jul 2015View
Figure 11.4_probe depth survey_v1P-Supporting Information · PDF13 Jul 2015View
Figure 8.1_ds_dwP-Supporting Information · PDF13 Jul 2015View
Separate a1 - wfdf_floor planP-Supporting Information · PDF13 Jul 2015View
Fig 6.22 principal visual recptors 21.05.15 sfsP-Supporting Information · PDF13 Jul 2015View
Fig 6.35 -cztv -auchren etc 150515 sfsP-Supporting Information · PDF13 Jul 2015View
Figure 8.3_vpvs_dwP-Supporting Information · PDF13 Jul 2015View
Approved - land ownership planP-Plans · PDF13 Jul 2015View
Fig 6.19 lcts and ztv to 10km sfsP-Supporting Information · PDF13 Jul 2015View
10 historic environmentP-Supporting Information · PDF13 Jul 2015View
Figure 3.1 - mining areasP-Supporting Information · PDF13 Jul 2015View
Fig 6.7 blade tip ztv to 35km 21.05.15 sfsP-Supporting Information · PDF13 Jul 2015View
Fig 6.54-vp10 cumulative wfr 150515P-Supporting Information · PDF13 Jul 2015View
Figure 3.15 - pd processesP-Supporting Information · PDF13 Jul 2015View
Fig 6.51-vp07 cumulative wfr 150515P-Supporting Information · PDF13 Jul 2015View
Figure 10.6_he wireline from thorril castle 29.06.15P-Supporting Information · PDF13 Jul 2015View
Figure 3.12b - wfdf site layoutP-Supporting Information · PDF13 Jul 2015View
Figure 2.3c - wire from m74 bridge_v1P-Supporting Information · PDF13 Jul 2015View
Figure 11.1_hydrology study area_v2P-Supporting Information · PDF13 Jul 2015View
Vp20 visualisation rev c 23-06-15 sfsP-Supporting Information · PDF13 Jul 2015View
Fig 6.47-vp03 cumulative wfr 150515P-Supporting Information · PDF13 Jul 2015View
Figure 3.11 - construction compoundP-Supporting Information · PDF13 Jul 2015View
Vp12 visualisation rev b 19-06-15 sfsP-Supporting Information · PDF13 Jul 2015View
Figure 2.1 - local env contraintsP-Supporting Information · PDF13 Jul 2015View
Nontechnical summaryP-Supporting Information · PDF13 Jul 2015View
Figure 3.6 - wtg foundations_150521P-Supporting Information · PDF13 Jul 2015View
Fig 6.15 hub height ztv se quadrant 21.05.15 sfsP-Supporting Information · PDF13 Jul 2015View
Application formP - Application Form · PDF9 Jul 2015View
Approved - location plan - drg no 1.1P-Plans · PDF9 Jul 2015View
Neighbour notification mapGeneral Documents9 Jul 2015View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Application approved
Variation decision notice no.2 march17 Eia final decision advert - lanark gazette Eia final decision advert - edinburgh gazette Decision notice - grant conditional planning permission Decision notice - grant conditional planning permission
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.