Scotland · Local authority

Shetland Islands planning applications

PlanningTrack collects planning applications and decisions from the public planning register of Shetland Islands. Search an address, application reference or proposal. Official Shetland Islands website

Collected application statistics

Collected records · All available dates
12,103Searchable applications
150Recorded as pending
98%Approval rate · 9,224 approved or refused records
163Refused applications

9,061 approved · 163 refused · 372 withdrawn. Received dates in our records: 12 Nov 1999 to 19 Oct 2026. Most recent record check: 22 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas3 mapped area records
Article 4 direction areasBoundary dataset not connected

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.

More application records

  1. Decided2002/095/NS

    To develop (Mussel) site

    N.E of Aithness, The Rona

    Received 4 Dec 2002
  2. Decided2002/094/NS

    To develop (Mussel) site

    N.W of Greena

    Received 4 Dec 2002
  3. Unknown2002/093/NS

    To develop (Mussel) site

    Stromness Voe

    Received 2 Dec 2002
  4. Decided2002/092/VF

    To vary finfish licence (P13/22/2D) by Increasing Cage Number, Changing Cage Type and Siting Feed Barge (Re-Submission)

    Wester Sound

    Received 25 Nov 2002
  5. Unknown2002/091/VS

    To vary shellfish licence (P12/61) by Increasing site area/production

    Lee

    Received 22 Nov 2002
  6. Decided2002/090/VF

    To vary finfish licence (2001/184/NF) by Increasing cage number, Increasing Mooring Area and Increasing Biomas

    Ness of Copister

    Received 20 Nov 2002
  7. Unknown2002/089/NS

    To develop (Mussel) site, East Point of Sletta, Aith Voe

    East of Point of Sletta

    Received 21 Nov 2002
  8. Decided2002/088/VF

    To vary finfish licence P13/08/08 by temporarily siting feed barge for a period of four years

    Hogan

    Received 21 Nov 2002
  9. Decided2002/087/VF

    To vary finfish licence ( 2002/005/NF) by Increasing Cage Number

    Fish Holm

    Received 20 Nov 2002
  10. Decided2003/092/NS

    To develop (Mussel) site

    North Muckle Ness, Dury Voe

    Received 9 May 2003
  11. Decided2003/091/NS

    To develop (Mussel) site

    N.W of Muckle Ness, Dury Voe

    Received 9 May 2003
  12. Decided2003/090/NS

    To develop (Mussel) site

    Bight of Bellister, Dury Voe

    Received 6 May 2003
  13. Decided2003/089/NS

    To develop (Mussel) site

    Glussvoe South

    Received 6 Feb 2003
  14. Decided2003/088/NS

    To develop (Mussel) site

    Glussvoe North

    Received 6 Feb 2003
  15. Decided2003/087/NS

    To develop (Mussel) site

    Collafirth

    Received 6 Feb 2003
  16. Decided2003/086/NS

    To develop (Mussel) site

    Queyfirth

    Received 6 Feb 2003
  17. Decided2003/085/NS

    To develop ( Oyster) site

    Aith Voe, Voxter, Cunningsburgh

    Received 30 Apr 2003
  18. Decided2003/084/NS

    To develop ( Oyster) site

    Effirth Voe

    Received 30 Apr 2003
  19. Decided2003/083/NS

    To develop (Oyster) site

    Scutta Voe

    Received 30 Apr 2003
  20. Decided2000/031/VS

    To transfer and vary works licence (P12/33) for a mussel farm, Foula Wick, Olnafirth

    Foula Wick

    Received 9 Jun 2000
  21. Decided2003/082/NS

    To develop ( Oyster) site

    Seli Voe

    Received 30 Apr 2003
  22. Decided2003/081/NS

    To develop ( Oyster) site

    Loch of Strom

    Received 30 Apr 2003
  23. Decided2003/080/NS

    To develop ( Mussel) site

    North Dales Voe

    Received 28 Apr 2003
  24. Decided2003/079/NS

    To develop ( Mussel) site

    South East Faroness

    Received 28 Apr 2003

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Get emailed about new planning applications in Shetland Islands

Area alerts send a daily or weekly email with new applications and decisions near a postcode, filtered by project type. £29 a month, up to 3 areas. Records are limited to the councils we collect.

Set up an area alert

Researching a proposal in Shetland Islands

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage