Scotland · Local authority

Shetland Islands
Planning applications.

Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
11,443Searchable applications
145Recorded as pending
98%Approval rate · 8,773 approved or refused records
158Refused applications

8,615 approved · 158 refused · 367 withdrawn. Received dates in our records: 19 Jun 2001 to 19 Oct 2026. Most recent record check: 21 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas3 mapped area records
Article 4 direction areasBoundary dataset not connected

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.

More application records

  1. Unknown2003/6/PCD

    Erect a dwellinghouse

    South Voxter Cunningsburgh ZE2 9HF

    Received 10 Jan 2003
  2. Unknown2010/5/PCD

    Erect dwellinghouse

    Site Swinster Sandwick ZE2 9HH

    Received 6 Jan 2010
  3. Unknown2009/5/PCD

    To extend and alter existing masts for replacement and new antennas and satellite dishes and ancillary works

    Aquiva Services Ltd Ward Hill Telecommunication Tower Bressay ZE2 9ER

    Received 13 Jan 2009
  4. Unknown2007/5/PCO

    Erect dwellinghouse (in outline)

    Cauldhame Trondra ZE1 0XL

    Received 15 Jan 2007
  5. Unknown2004/5/PCD

    Erect dwellinghouse, South West of Atlaness

    Atlaness Hamnavoe Burra Shetland ZE2 9XW

    Received 15 Jan 2004
  6. Unknown2003/5/LBC

    Replace windows

    Anderson & Co 60-62 Commercial Street Lerwick ZE1 0BD

    Received 9 Jan 2003
  7. Unknown2002/5/PCD

    Retain caravan

    Dunrossness Riding Club Dunrossness ZE2 9JQ

    Received 9 Jan 2002
  8. Unknown2010/4/PCD

    Change of use from grazing land to community allotments

    Fraser Peterson Centre Firth Mossbank ZE2 9RB

    Received 6 Jan 2010
  9. Unknown2009/4/PCD

    To renew 5 windows

    2 Anderson Place Lerwick ZE1 0JE

    Received 13 Jan 2009
  10. Unknown2007/4/PCO

    Erect dwellinghouse (in outline)

    Cauldhame Trondra ZE1 0XL

    Received 15 Jan 2007
  11. Unknown2005/4/PCD

    Change of use from office to office/residential

    10A Charlotte Street Lerwick ZE1 0JL

    Received 13 Jan 2005
  12. Unknown2004/4/PCD

    Erect 37 dwellinghouse (phase 1)

    Quoys Upper Sound Lerwick Shetland ZE1 0SP

    Received 12 Jan 2004
  13. Unknown2003/4/PCD

    Erect double garage

    Chorale House Brae ZE2 9QJ

    Received 9 Jan 2003
  14. Unknown2002/4/PCD

    Erect porch/conservatory extension

    Chalet 2 Kelda Baltasound Unst ZE2 9DS

    Received 9 Jan 2002
  15. Unknown2011/3/PCD

    Form park and ride facility, Sellaness Industrial Estate, Sellaness, Graven, Mossbank

    Sella Ness Industrial Estate Graven Mossbank ZE2 9QR

    Received 12 Jan 2011
  16. Unknown2010/3/PCD

    Erect 3 20/25kW wind turbines to 30m maximum height and site switchgear building. Removal of redundant turbine, switchgear building and mast. Use of existing cable between South Biggins and turbine, including repair/replacement of faulty sections. Establish new access gate in existing field boundary dyke. Use existing field access route, to new access gate and strengthened with hardcore in front of South Biggins buildings. Ongoing access across grazed land with possible minor infill with sand/gravel on areas of softer ground if required.

    South Biggins Foula ZE2 9PN

    Received 6 Jan 2010
  17. Unknown2009/3/ADV

    To erect a hanging sign

    British Red Cross Service Office Reform Lane Lerwick ZE1 0DL

    Received 8 Jan 2009
  18. Unknown2007/3/LBC

    Creation of advertising silhouette on camping bod

    Sail Loft Camping Bod Lower Voe Voe ZE2 9PX

    Received 15 Jan 2007
  19. Unknown2005/3/PCD

    Erect 15 metre (base to hub) wind turbine (19.8 metres overall)

    Hill of Ollaberry Ollaberry ZE2 9RT

    Received 13 Jan 2005
  20. Unknown2004/3/PCD

    Extend dwellinghouse

    Shalders Levenwick Shetland ZE2 9HX

    Received 12 Jan 2004
  21. Unknown2003/3/PCD

    Demolish existing single storey storage building and erect new store with mezzanine floor

    General Merchants Vidlin ZE2 9QB

    Received 7 Jan 2003
  22. Unknown2011/2/PCD

    Form a car park

    Sella Ness Industrial Estate Graven Mossbank ZE2 9QR

    Received 12 Jan 2011
  23. Unknown2009/2/PCD

    To demolish existing porch, erect new sun room, replace roof cladding and install ground source heat pump

    Da Noup Southerhouse Scousburgh Dunrossness ZE2 9JE

    Received 7 Jan 2009
  24. Unknown2008/2/PCD

    Erect dwellinghouse

    Bridge End Burra ZE2 9LD

    Received 4 Jan 2008

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Shetland Islands

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage