England · Local authority

Rossendale planning applications

PlanningTrack collects planning applications and decisions from the public planning register of Rossendale Borough Council. Search an address, application reference or proposal. Official Rossendale website

Collected application statistics

Collected records · All available dates
16,511Searchable applications
397Recorded as pending
83%Approval rate · 13,903 approved or refused records
2,294Refused applications

11,609 approved · 2,294 refused · 701 withdrawn. Received dates in our records: 4 Apr 1975 to 19 Oct 2026. Most recent record check: 23 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas11 mapped area records
Article 4 direction areas7 mapped area records1 identified HMO area records; remaining records unclassified

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Sources: Planning Data conservation areas and Article 4 direction areas. Contains public sector information licensed under the Open Government Licence v3.0.

More application records

  1. DecidedX/2005/536

    Two storey extension to rear of house

    Received 14 Sept 2005
  2. DecidedX/2005/535

    Demolition of existing works and erection of 11 dwellings

    Received 14 Sept 2005
  3. DecidedX/2005/534 LB

    Replacement of degraded windows to match existing windows in terms of design & colour

    Received 13 Sept 2005
  4. DecidedX/2005/533

    Conversion of existing garage to form additional living accommodation including removal of garage door

    Received 13 Sept 2005
  5. DecidedX/2005/532

    First floor extension above garage and lean to conservatory to rear

    Received 13 Sept 2005
  6. DecidedX/2005/531

    Erection of Four Advertisement Hoardings

    Received 12 Sept 2005
  7. DecidedX/2005/530

    Erection of Five Advertisement Hoardings

    Received 12 Sept 2005
  8. DecidedX/2005/529

    Erection of conservatory to side of dwelling

    Received 8 Sept 2005
  9. DecidedX/2005/528

    Outline application for the erection for 4no. bungalows (Site area 0.135 ha)

    Received 8 Sept 2005
  10. DecidedX/2005/527

    Two storey extension to side of house

    Received 8 Sept 2005
  11. DecidedX/2005/526

    Conversion of Agricultural Buildings to Five Dwellings & Erection of new Agricultrual Building

    Received 7 Sept 2005
  12. DecidedX/2005/525 LB

    Change of Use of attached Barn to provide additional living accommodation, internal alterations and elevational changes (This application may affect the setting of Footpath No. 96).

    Received 7 Sept 2005
  13. DecidedX/2005/524

    Change of Use of attached Barn to provide additional living accomodation, (This application may affect the setting of Footpath No. 96).

    Received 7 Sept 2005
  14. DecidedX/2005/523

    Erection of single storey side extension

    Received 7 Sept 2005
  15. DecidedX/2005/517

    Erection of garage including safety rail to roof and formation of steps to provide access to roof

    Received 5 Sept 2005
  16. DecidedX/2005/516

    Outline - Erection of building for industrial use

    Received 5 Sept 2005
  17. DecidedX/2005/515 LB

    Erection of garage

    Received 1 Sept 2005
  18. DecidedX/2005/514

    Erection of garage

    Received 1 Sept 2005
  19. DecidedX/2005/513

    Demolition of outbuildings and erection of stable

    Received 1 Sept 2005
  20. DecidedX/2005/512

    Two storey extension to side elevation

    Received 6 Oct 2005
  21. DecidedX/2005/511

    Creation of fire escape (Amended Plan)

    Received 30 Aug 2005
  22. DecidedX/2005/510 LB

    Erection of a partition wall, installation of air-conditioning ducting and external condenser cabinet

    Received 30 Aug 2005
  23. DecidedX/2005/509

    Prior notification application for 15m high telecommunications mast and associated equipment cabinets & fenced compound

    Received 30 Aug 2005
  24. DecidedX/2005/508

    Two storey extension to side and conservatory to rear

    Received 30 Aug 2005

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Get emailed about new planning applications in Rossendale

Area alerts send a daily or weekly email with new applications and decisions near a postcode, filtered by project type. £29 a month, up to 3 areas. Records are limited to the councils we collect.

Set up an area alert

Researching a proposal in Rossendale Borough Council

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Rossendale Borough Council, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage