Council planning record

Decommissioning of existing 20 wind turbines (blade tip height of 53.5m), transformers, substation & other infrastructure and proposed erection of 7 wind turbines (blade tip height of 110m) to form scheme known as 'Headwind Taff Ely Wind Farm'. Proposal also includes transformers, substation, permanent and temporary anemometry masts, new access tracks, upgrade of existing tracks and other associated developments.

Tynewydd And Maendy Farms Gilfach Goch

DecidedReference: 11/1468/FULRhondda Cynon Taf County Borough Council

Last published check: 18 Oct 2026, 19:15. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Registered

    Published milestoneCouncil source
  3. Application Validated

    Published milestoneCouncil source
  4. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Actual Committee Date

    Published milestoneCouncil source
  6. Decision Issued Date

    Published milestoneCouncil source

Application summary

Status
Decided
Application type
Full Application
Received
23 Dec 2011
Validated
7 Mar 2012
Determination deadline
27 Jun 2012
Local authority
Rhondda Cynon Taf County Borough Council

Application overview

Decommissioning of existing 20 wind turbines (blade tip height of 53.5m), transformers, substation & other infrastructure and proposed erection of 7 wind turbines (blade tip height of 110m) to form scheme known as 'Headwind Taff Ely Wind Farm'. Proposal also includes transformers, substation, permanent and temporary anemometry masts, new access tracks, upgrade of existing tracks and other associated developments.

Proposal details

Reference
11/1468/FUL
Ward
Gilfach Goch

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Tynewydd And Maendy Farms Gilfach Goch

This record has no verified map location.

View council map

Documents 213 of 213

DocumentPublishedAction
Conditions od ApprovalCONREA · PDF15 Jan 2015View
Post Decision letter to Welsh GovernmentCONREA15 Jan 2015View
BRIDGEND C B C LETTERCONSULTN · PDF12 Feb 2013View
NATS SafeguardingCONSULTN10 Jan 2013View
CCW LETTER & COMMENTSCONSULTN · PDF31 Aug 2012View
CONSULTNCONSULTN20 Jun 2012View
CONSULTNCONSULTN18 Jun 2012View
CONSULTNCONSULTN18 Jun 2012View
CONSULTNCONSULTN18 Jun 2012View
CONSULTNCONSULTN18 Jun 2012View
CONSULTNCONSULTN13 Jun 2012View
CONSULTNCONSULTN12 Jun 2012View
Appendix J5 - PhotosSUPPINFO · PDF16 May 2012View
Viewpoints - 15e Hendreforgan Community FacilitiesSUPPINFO · PDF16 May 2012View
Viewpoints - 9a Hirwaun CommonSUPPINFO · PDF16 May 2012View
Viewpoints - 15b Hendreforgan Community FacilitiesSUPPINFO · PDF16 May 2012View
Viewpoints - 10d Tyla Gwyn, South of M4SUPPINFO · PDF16 May 2012View
Appendix G3 - Borrow Pit AssessmentSUPPINFO · PDF16 May 2012View
Viewpoints - 5a EvanstownSUPPINFO · PDF16 May 2012View
Viewpoints - 16c Stalling DownSUPPINFO · PDF16 May 2012View
Appendix F6 - WireframesSUPPINFO · PDF16 May 2012View
Viewpoints - 17b Mynydd Llangeinwyr Rhiw FerSUPPINFO · PDF16 May 2012View
Appendix H6 - Bat Survey (SKM)SUPPINFO · PDF16 May 2012View
Viewpoints - 6e Car Park on Ogwr Ridgeway WalkSUPPINFO · PDF16 May 2012View
Environmental Statement: 17. Climate ChangeSUPPINFO · PDF16 May 2012View
Appendix Q1 - Carbon Balance DataSUPPINFO · PDF16 May 2012View
Viewpoints - 17e Mynydd Llangeinwyr Rhiw FerSUPPINFO · PDF16 May 2012View
Viewpoints - 2a BrynnaSUPPINFO · PDF16 May 2012View
Viewpoints - 5d EvanstownSUPPINFO · PDF16 May 2012View
Viewpoints - 13c A4233 North of TonyrefailSUPPINFO · PDF16 May 2012View
Viewpoints - 11c Parc Bryn Derwen, BryncaeSUPPINFO · PDF16 May 2012View
Appendix H9 - ReptilesSUPPINFO · PDF16 May 2012View
Appendix F4 - Designated Landscape SLA's & LCA'sSUPPINFO · PDF16 May 2012View
Viewpoints - 8b The Meadows, ThomastownSUPPINFO · PDF16 May 2012View
Viewpoints - 7c Y Billy Wynt, Llantrisant CommonSUPPINFO · PDF16 May 2012View
Viewpoints - 3a A4093 Weat of GlynogwrSUPPINFO · PDF16 May 2012View
Appendix J3 - Direct Gazetteer BSUPPINFO · PDF16 May 2012View
Viewpoints - 14c Mountain View, East of HendreforganSUPPINFO · PDF16 May 2012View
Non-Technical SummarySUPPINFO · PDF16 May 2012View
Viewpoints - 16d Stalling DownSUPPINFO · PDF16 May 2012View
Viewpoints - 10b Tyla Gwyn, South of M4SUPPINFO · PDF16 May 2012View
Viewpoints - 9b Hirwaun CommonSUPPINFO · PDF16 May 2012View
Appendix I4 - Bird Collision Risk AssessmentSUPPINFO · PDF16 May 2012View
Viewpoints - 1b Fern Street, HendreforganSUPPINFO · PDF16 May 2012View
Viewpoints - 5b EvanstownSUPPINFO · PDF16 May 2012View
Viewpoints - 13a A4233 North of TonyrefailSUPPINFO · PDF16 May 2012View
Appendix Q2a - Carbon Calculator Input DataSUPPINFO · PDF16 May 2012View
Appendix F7 - Cumulative Sequential Effects During OperationSUPPINFO · PDF16 May 2012View
Viewpoints - 11a Parc Bryn Derwen, BryncaeSUPPINFO · PDF16 May 2012View
Viewpoints - 4b Highlands Close TonyrefailSUPPINFO · PDF16 May 2012View
Appendix H4 - Aquatic Invertebrate ReportSUPPINFO · PDF16 May 2012View
Appendix L- Noise and Vibration Technical ReportSUPPINFO · PDF16 May 2012View
Viewpoints - 15d Hendreforgan Community FacilitiesSUPPINFO · PDF16 May 2012View
Appendix F2 - Regional Landscape CharacterSUPPINFO · PDF16 May 2012View
Viewpoints - 9c Hirwaun CommonSUPPINFO · PDF16 May 2012View
Viewpoints - 3e A4093 Weat of GlynogwrSUPPINFO · PDF16 May 2012View
Appendix H7 - Bat Survey Report (RSK)SUPPINFO · PDF16 May 2012View
Viewpoints - 16a Stalling DownSUPPINFO · PDF16 May 2012View
Viewpoints - 7a Y Billy Wynt, Llantrisant CommonSUPPINFO · PDF16 May 2012View
Appendix H2 - Extended Phase 1 Habitat Survey (SKM)SUPPINFO · PDF16 May 2012View
Viewpoints - 12b Cae Abbot, South of Mynydd LlangeinorSUPPINFO · PDF16 May 2012View
Viewpoints - 6a Car Park on Ogwr Ridgeway WalkSUPPINFO · PDF16 May 2012View
Viewpoints - 17f Mynydd Llangeinwyr Rhiw FerSUPPINFO · PDF16 May 2012View
Viewpoints - 3c A4093 Weat of GlynogwrSUPPINFO · PDF16 May 2012View
Viewpoints - 14a Mountain View, East of HendreforganSUPPINFO · PDF16 May 2012View
Appendix A1 - Scoping OpinionSUPPINFO · PDF16 May 2012View
Viewpoints - 6c Car Park on Ogwr Ridgeway WalkSUPPINFO · PDF16 May 2012View
Viewpoints - 8a The Meadows, ThomastownSUPPINFO · PDF16 May 2012View
Viewpoints - 8c The Meadows, ThomastownSUPPINFO · PDF16 May 2012View
Viewpoints - 2b BrynnaSUPPINFO · PDF16 May 2012View
Appendix H11 - NVC SurveySUPPINFO · PDF16 May 2012View
Viewpoints - 4c Highlands Close TonyrefailSUPPINFO · PDF16 May 2012View
Viewpoints - 3b A4093 Weat of GlynogwrSUPPINFO · PDF16 May 2012View
Appendix J1 - Archaeology and Cultural Heritage Baseline ReportSUPPINFO · PDF16 May 2012View
Appendix F5 - Representative Viewpoint AssessmentSUPPINFO · PDF16 May 2012View
Appendix Q2b - Carbon Calculator Output DataSUPPINFO · PDF16 May 2012View
Appendix I1 - Wintering Bird SurveySUPPINFO · PDF16 May 2012View
Viewpoints - 11b Parc Bryn Derwen, BryncaeSUPPINFO · PDF16 May 2012View
Appendix G1 - Flood Consequence AssessmentSUPPINFO · PDF16 May 2012View
Appendix M1 - Community BenefitsSUPPINFO · PDF16 May 2012View
Viewpoints - 17d Mynydd Llangeinwyr Rhiw FerSUPPINFO · PDF16 May 2012View
Appendix H5 - Great Crested Newt SurveySUPPINFO · PDF16 May 2012View
Viewpoints - 16b Stalling DownSUPPINFO · PDF16 May 2012View
Appendix A2 - Consultation MatrixSUPPINFO · PDF16 May 2012View
Viewpoints - 6d Car Park on Ogwr Ridgeway WalkSUPPINFO · PDF16 May 2012View
Appendix H8 - Otter & Water VoleSUPPINFO · PDF16 May 2012View
Viewpoints - 2c BrynnaSUPPINFO · PDF16 May 2012View
Environmental Statement: 18. Environmetal ManagementSUPPINFO · PDF16 May 2012View
Appendix I2 - Breeding Bird SurveySUPPINFO · PDF16 May 2012View
Viewpoints - 14b Mountain View, East of HendreforganSUPPINFO · PDF16 May 2012View
Appendix J2 - Direct GazetteerSUPPINFO · PDF16 May 2012View
Appendix F3 - VSAA's Key Characteristics & SensitivitySUPPINFO · PDF16 May 2012View
Viewpoints - 10a Tyla Gwyn, South of M4SUPPINFO · PDF16 May 2012View
Viewpoints - 4a Highlands Close TonyrefailSUPPINFO · PDF16 May 2012View
Viewpoints - 1a Fern Street, HendreforganSUPPINFO · PDF16 May 2012View
Viewpoints - 12c Cae Abbot, South of Mynydd LlangeinorSUPPINFO · PDF16 May 2012View
Viewpoints - 6b Car Park on Ogwr Ridgeway WalkSUPPINFO · PDF16 May 2012View
Appendix H3 - Parc Erin Phase 1 SurveySUPPINFO · PDF16 May 2012View
Viewpoints - 3d A4093 Weat of GlynogwrSUPPINFO · PDF16 May 2012View
Appendix H12 - NVC (RSK)SUPPINFO · PDF16 May 2012View
Appendix F1 - Assessment MethodologySUPPINFO · PDF16 May 2012View
Viewpoints - 15c Hendreforgan Community FacilitiesSUPPINFO · PDF16 May 2012View
Appendix H1 - Background Data SearchSUPPINFO · PDF16 May 2012View
Viewpoints - 5e EvanstownSUPPINFO · PDF16 May 2012View
Viewpoints - 17c Mynydd Llangeinwyr Rhiw FerSUPPINFO · PDF16 May 2012View
Environmental Statement: 18. Cumulative EffectsSUPPINFO · PDF16 May 2012View
Viewpoints - 7d Y Billy Wynt, Llantrisant CommonSUPPINFO · PDF16 May 2012View
Appendix H10 - Marsh Fritillary Butterfly SurveySUPPINFO · PDF16 May 2012View
Viewpoints - 12a Cae Abbot, South of Mynydd LlangeinorSUPPINFO · PDF16 May 2012View
Appendix J4 - Archaeological EvaluationSUPPINFO · PDF16 May 2012View
Viewpoints - 15a Hendreforgan Community FacilitiesSUPPINFO · PDF16 May 2012View
Viewpoints - 5c EvanstownSUPPINFO · PDF16 May 2012View
Environmental Statement: 16. DecommissioningSUPPINFO · PDF16 May 2012View
Viewpoints - 17a Mynydd Llangeinwyr Rhiw FerSUPPINFO · PDF16 May 2012View
Viewpoints - 10c Tyla Gwyn, South of M4SUPPINFO · PDF16 May 2012View
Viewpoints - 13b A4233 North of TonyrefailSUPPINFO · PDF16 May 2012View
Viewpoints - 7b Y Billy Wynt, Llantrisant CommonSUPPINFO · PDF16 May 2012View
Viewpoints - 1c Fern Street, HendreforganSUPPINFO · PDF16 May 2012View
Environmental Statement: Figure 3.3 - Layout 3SUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 6.17 - Consented (Under Construction) Mynydd Portref ZTVSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 6.41 - Visual & Sensory Aspect Areas Evaluation (10km Radius)SUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 11.4 - Wilfred Way Swept Path AnalysisSUPPINFO · PDF15 May 2012View
Environmental Statement: 4. Project DescriptionSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 6.20 - Consented Maerdy ZTVSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 6.44 - Landscape Designations (35km Radius) with ZTVSUPPINFO · PDF15 May 2012View
Environmental Statement: 8. Ecology (Figures)SUPPINFO · PDF15 May 2012View
Taff Ely Wind Farm LayoutPLAN · PDF15 May 2012View
Environmental Statement: Figure 6.38 - Cultural Landscape (2km Radius) with ZTVSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 13.1 - Public Rights of Way and Named Walks (1)SUPPINFO · PDF15 May 2012View
Planning StatementSUPPINFO · PDF15 May 2012View
Flood Consequence AssessmentSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 6.9 - Operational Taff Ely ZTVSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 6.2 - ZTV (35km Radius) to Blade Tip HeightSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 6.27 - In Planning Pen y Cymoedd ZTVSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 15 - Existing Shadow FlickerSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 6.6 - ZTV (2km Radius) to Hub HeightSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 7.4 - Conceptual Site ModelSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 6.39 - Visual & Sensory Aspect Areas Evaluation (35km Radius)SUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 6.30 - In Planning Hirfynydd ZTVSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 11.2 - Location of Strategic Corridors StudiesSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 3.1 - Layout 1SUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 6.15 - Operational Swansea Docks ZTVSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 3.4 - Final LayoutSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 6.25 - In Planning Llynfi Afan ZTVSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 6.36 - Geological Landscape Evaluation (2km Radius) with ZTVSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 7.2 - Geological Information PlanSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 14.2 - Telecommunication LinkSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 10.3 - Historical Surface Ground Workings Known from AP/Historical Mapping/ FRS AssessmentsSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 6.12 - Operational Maesgwyn ZTVVSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 6.1 - Cumulative Wind Farm PlanSUPPINFO · PDF15 May 2012View
Non-Technical SummarySUPPINFO · PDF15 May 2012View
APPFORMAPPFORM · PDF15 May 2012View
Environmental Statement: Figure 6.18 - Consented Pant Y Wal ZTVSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 13.1 - Public Rights of Way and Named Walks (2)SUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 6.2 - ZTV (10km Radius) to Hub HeightSUPPINFO · PDF15 May 2012View
Environmental Statement: 2. Legislative Framework of EIASUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 6.21 - Consented Fochriw ZTVSUPPINFO · PDF15 May 2012View
Environmental Statement: 7. Physical ConditionsSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 6.34 - Regional Landscape Character Areas with ZTVSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 6.13 - Operational Wentloog ZTVSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 7.6 - Existing WatercoursesSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 6.45 - Landscape Designations (10km Radius)SUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 1.2 - Existing InfrastructureSUPPINFO · PDF15 May 2012View
Environmental Statement: 9. Avian Ecology (Figures)SUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 10.1 - Potential Direct Constraints from Site Infrastructure, Known Heritage Assets Within Study Area ASUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 6.43 - Landscape Designations (35km Radius)SUPPINFO · PDF15 May 2012View
Environmental Statement: 5. Planning Policy ContextSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 6.22 - Consented Clearwell Farm ZTVSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 15 - Proposed Shadow FlickerSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 6.10 - Operational Ferndale Power Factory ZTVSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 6.8 - Viewpoint Location PlanSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 6.32 - In Planning Unit 15 Rassau ZTVSUPPINFO · PDF15 May 2012View
Environmental Statement: 11. TransportSUPPINFO · PDF15 May 2012View
Environmental Statement: 1. IntroductionSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 6.28 - In Planning Kenfig ZTVSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 6.19 - Consented Fforch Nest ZTVSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 3.2 - Layout 2SUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 6.37 - Historic Landscape (2km Radius) with ZTVSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 3.5 - Constraints MapSUPPINFO · PDF15 May 2012View
Environmental Statement: 13. Public Access, Amenity & SocioeconomicsSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 6.2 - ZTV (35km Radius) to Hub HeightSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 13.2 - Public Rights of Way ReferencesSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 7.3 - Annotated Aerial PhotoSUPPINFO · PDF15 May 2012View
EIA Quality Mark StatementSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 11.1 - Proposed Route AccessSUPPINFO · PDF15 May 2012View
Environmental Statement: 8. EcologySUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 6.46 - Landscape Designations (10km Radius) With ZTVSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 6.11 - Operational Ffynnon Oer ZTVSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 6.35 - Visual & Sensory Aspect Areas Evaluation (2km Radius) with ZTVSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 6.29 - In Planning Bedlinog ZTVSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 10.2 - Designated Heritage Assets Within Study Area BSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 7.1 - Site Layout PlanSUPPINFO · PDF15 May 2012View
Environmental Statement: 14. TelecommunicationsSUPPINFO · PDF15 May 2012View
Environmental Statement: 6. Landscape and VisualSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 6.23 - Consented P & P ZTVSUPPINFO · PDF15 May 2012View
Environmental Statement: 10. Archaeology and Cultural HeritageSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 6.33 - Regional Landscape Character AreasSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 1.1 - Location Plan Rev01SUPPINFO · PDF15 May 2012View
Environmental Statement: 12. Noise & VibrationSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 6.42 - Visual & Sensory Aspect Areas Evaluation (10km Radius) with ZTVSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 4.1 - Final Infrastructure PlanSUPPINFO · PDF15 May 2012View
Environmental Statement: 9. Avian EcologySUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 6.7 - ZTV (2km Radius) to Blade TipSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 6.31 - In Planning Mynydd Marchywel ZTVSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 6.16 - Operational Solutia ZTVSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 6.40 - Visual & Sensory Aspect Areas Evaluation (35km Radius) with ZTVSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 11.3 - Junction 6-14 Swept Path AnalysisSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 6.26 - In Planning Maerdy ZTVSUPPINFO · PDF15 May 2012View
Environmental Statement: 15. Shadow FlickerSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 6.5 - ZTV (10km Radius) to Blade TipSUPPINFO · PDF15 May 2012View
DESIGNDESIGN · PDF15 May 2012View
Environmental Statement: 3. Project design and alternativesSUPPINFO · PDF15 May 2012View
Environmental Statement: Figure 6.14 - Operational Bassaleg ZTVSUPPINFO · PDF15 May 2012View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Granted
Post Decision letter to Welsh Government
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.