Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
AVG IMPERIAL LTD IMPERIAL AVENUE SOUTH BANK MIDDLESBROUGH TS6 6BA
Last published check: 20 Oct 2026, 13:51. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceProposed Expansion to existing Anaerobic Digester Plant (AVG Imperial), including a new treatment plant, new solid and liquid waste reception hall, digestate concentration process, new tank storage, biogas upgrading system, digestate offtake point, gas grid entry unit (propane mixing and metering), ...
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsAVG IMPERIAL LTD IMPERIAL AVENUE SOUTH BANK MIDDLESBROUGH TS6 6BA
This record has no verified map location.
| Document | Published | Action |
|---|---|---|
| ApplicationFormRedacted.pdfApplication Form | 11 May 2026 | View |
| R-2026-0341-FFM.pdfConsultee response - Northumbrian Water (1) | 3 Jun 2026 | View |
| R-2026-0341-FFM Imperial Avenue South Bank.pdfConsultee response - Strategic Planning (Policy) | 4 Jun 2026 | View |
| Planning Nuisance.pdfConsultee response - Environmental Protection (Nuisance)(1) | 9 Jun 2026 | View |
| BCO00077 Cont land.pdfConsultee response - Environmental Protection (Contaminated Land)(1) | 9 Jun 2026 | View |
| Consultee Response Greener Futures.pdfConsultee response - Greener Futures Climate Change | 10 Jun 2026 | View |
| QBE-JBA-XX-XX-TN-Z-0068-S3-P01-R20260341FFM_SuDS_Assessment.pdfConsultee response - Engineers (Local Lead Flood Authority) | 11 Jun 2026 | View |
| 549666 - R_2026_0341_FFM - Natural England.pdfConsultee response - Natural England | 16 Jun 2026 | View |
| Response 19-6-26.pdfConsultee response - Environment Agency | 22 Jun 2026 | View |
| QBE-JBA-XX-XX-TN-Z-0068-S3-P02-R20260341FFM_SuDS_Assessment.pdfConsultee response - Engineers (Local Lead Flood Authority) | 24 Jun 2026 | View |
| Planning Nuisance(1).pdfConsultee response - Environmental Protection (Nuisance)(2) | 24 Jun 2026 | View |
| Planning Con Land.pdfConsultee response - Environmental Protection (Contaminated Land)(2) | 24 Jun 2026 | View |
| R-2026-0341-FFM June 2026.pdfConsultee response - Northumbrian Water (2) | 30 Jun 2026 | View |
| CR highways.pdfConsultee response - Engineering Team (Highways) | 2 Jul 2026 | View |
| CR Ward Members.pdfConsultee response - Ward Members | 3 Jul 2026 | View |
| Consultee Response - Income Funding Officer.pdfConsultee Response Income Funding Officer | 28 Jul 2026 | View |
| Network Rail.pdfConsultee response - Network Rail(1) | 14 Aug 2026 | View |
| QBE-JBA-XX-XX-TN-Z-0068-S3-P03-R20260341FFM_SuDS_Assessment.pdfConsultee response - Engineers (Local Lead Flood Authority) | 9 Oct 2026 | View |
| Network Rail(1).pdfConsultee response - Network Rail(2) | 19 Oct 2026 | View |
| LocationPlan.pdfLocation plan | 11 May 2026 | View |
| 256088-BGP-01-XX-T-C-0001-Drainage Philosophy-P01.pdfDrainage Philosophy | 9 Jun 2026 | View |
| 256088-BGP-01-XX-T-C-0003-SuDSManagementPlan-P01.pdfSUDS Management Plan | 9 Jun 2026 | View |
| 256088-BGP-ZZ-00-D-C-0132_P01 - Drainage Plan - Sheet 2.pdfDrainage Plan Sheet 2 | 9 Jun 2026 | View |
| 256088-BGP-ZZ-00-D-C-0145_P01 - SUDS Managment Plan.pdfSuds Managment Plan | 9 Jun 2026 | View |
| 256088-BGP-ZZ-00-D-C-0131_P01 - Drainage Plan - Sheet 1.pdfDrainage Plan Sheet 1 | 9 Jun 2026 | View |
| 256088-BGP-ZZ-00-D-C-0102_P01 - Exceedance Route Plan.pdfExceedance Route Plan | 9 Jun 2026 | View |
| 256088-BGP-ZZ-00-D-C-0139_P01 - Manhole Schedule.pdfManhole Schedule | 9 Jun 2026 | View |
| 256088-BGP-ZZ-00-D-C-0130_P01 - Drainage Plan - Overall.pdfDrainage Plan Overall | 9 Jun 2026 | View |
| 256088-BGP-ZZ-00-D-C-0101_P01 - Impermeable Areas Plan.pdfImpermeable Areas Plan | 9 Jun 2026 | View |
| 25-019-CAL-SI-ZZ-DR-A-00-100_P2 - Location Plan.pdfLocation Plan | 11 May 2026 | View |
| 25-019-CAL-ZZ-SI-DR-A-00-101_P3 - Proposed Block Plan.pdfProposed Block Plan | 11 May 2026 | View |
| 25-019-CAL-ZZ-SI-DR-A-00-102_P7 - Proposed Site Plan.pdfProposed Site Plan | 11 May 2026 | View |
| 25-019-CAL-B1-ZZ-DR-A-00-200_P2 - Proposed Ground Floor Plan.pdfProposed Ground Floor Plan - loading bays | 11 May 2026 | View |
| 25-019-CAL-B1-ZZ-DR-A-00-201_P1 - Proposed Roof Plan.pdfProposed Roof Plan - loading bays | 11 May 2026 | View |
| 25-019-CAL-ZZ-ZZ-DR-A-00-204_P1 - Proposed Plan - External Tanks.pdfProposed Plan External Tanks | 11 May 2026 | View |
| 25-019-CAL-ZZ-ZZ-DR-A-00-207_P1 - Proposed Contextual Elevation 1.pdfProposed Contextual Elevation 1 | 11 May 2026 | View |
| 25-019-CAL-ZZ-ZZ-DR-A-00-208_P1 - Proposed Contextual Elevation 2.pdfProposed Contextual Elevation 2 | 11 May 2026 | View |
| 25-019-CAL-ZZ-ZZ-DR-A-00-800_P2 - Proposed 3D Views - Sheet 01.pdfProposed 3d Views Sheet 01 | 11 May 2026 | View |
| 25-019-CAL-ZZ-ZZ-DR-A-00-801_P2 - Proposed 3D Views - Sheet 02.pdfProposed 3d Views Sheet 02 | 11 May 2026 | View |
| 25-019-CAL-B1-ZZ-DR-A-00-203_P2 - Proposed Elevations - Building 1.pdfProposed Elevations - Building 1 | 11 May 2026 | View |
| 25-019-CAL-B2-ZZ-DR-A-00-202_P2 - Proposed Plans and Elevations.pdfProposed Plans And Elevations - Building 2 | 11 May 2026 | View |
| 25-019-CAL-B1-ZZ-DR-A-00-700_P2 - Proposed GA Sections - Building 1.pdfProposed GA Sections - Building 1 | 11 May 2026 | View |
| 25-019-CAL-ZZ-ZZ-DR-A-00-205_P1 - Proposed Elevations - External Tanks - Sheet 01.pdfProposed Elevations External Tanks Sheet 01 | 11 May 2026 | View |
| 25-019-CAL-B2-ZZ-DR-A-00-701_P2 - Proposed GA Sections - Building 2.pdfProposed GA Sections - Building 2 | 11 May 2026 | View |
| 1819-SINE-EX-SL-DR-E-7101.pdfProposed External Lighting Plan | 11 May 2026 | View |
| 25-019-CAL-ZZ-ZZ-DR-A-00-206_P1 - Proposed Elevations - External Tanks - Sheet 02.pdfProposed Elevations External Tanks Sheet 02 | 11 May 2026 | View |
| 256088-BGP-ZZ-00-D-C-0135_P01 - Drainage Details - Sheet 1..pdfDrainage Details Sheet 1 | 9 Jun 2026 | View |
| 256088-BGP-ZZ-00-D-C-0136_P01 - Drainage Details - Sheet 2.pdfDrainage Details Sheet 2 | 9 Jun 2026 | View |
| 256088-BGP-ZZ-00-D-C-0101_P02 - Impermeable Areas Plan.pdfImpermeable Areas Plan Amended | 23 Sept 2026 | View |
| 256088-BGP-ZZ-00-D-C-0102_P02 - Exceedance Route Plan.pdfExceedance Route Plan Amended | 23 Sept 2026 | View |
| 256088-BGP-ZZ-00-D-C-0130_P02 - Drainage Plan - Overall.pdfDrainage Plan Overall Amended | 23 Sept 2026 | View |
| 256088-BGP-ZZ-00-D-C-0131_P02 - Drainage Plan - Sheet 1.pdfDrainage Plan Sheet 1 Amended | 23 Sept 2026 | View |
| 256088-BGP-ZZ-00-D-C-0132_P02 - Drainage Plan - Sheet 2.pdfDrainage Plan Sheet 2 Amended | 23 Sept 2026 | View |
| 256088-BGP-ZZ-00-D-C-0139_P02 - Manhole Schedule.pdfManhole Schedule Amended | 23 Sept 2026 | View |
| 256088-BGP-ZZ-00-D-C-0145_P02 - SUDS Managment Plan.pdfSuds Managment Plan Amended | 23 Sept 2026 | View |
| 25-019 - AVG_Imperial Avenue - Design and Access Statement_compressed-1-15.pdfDesign And Access Statement Compressed Pages 1 - 15 | 11 May 2026 | View |
| 25-019 - AVG_Imperial Avenue - Design and Access Statement_compressed-16-27.pdfDesign And Access Statement Compressed Pages 16 - 27 | 11 May 2026 | View |
| 25-019 - AVG_Imperial Avenue - Design and Access Statement_compressed-28-32.pdfDesign And Access Statement Compressed Pages 28 - 32 | 11 May 2026 | View |
| 25-019 - AVG_Imperial Avenue - Design and Access Statement_compressed-33-44.pdfDesign And Access Statement Compressed Pages 33 - 44 | 11 May 2026 | View |
| 001R Imperial Park Noise Final V2.pdfNoise Asessment (Final V2) | 11 May 2026 | View |
| 416.066887.00001_Imperial Park AD_AQA_v1.1.pdfAir Quality Assessment (V1.1) | 11 May 2026 | View |
| 5164.TN01F.pdfTransport Note (5164.tn01f) | 11 May 2026 | View |
| Imperial Park Biodiversity Net Gain Statement R2 Final.pdfBiodiversity Net Gain Statement (R2 Final) | 11 May 2026 | View |
| Imperial Park Middlesbrough PEA R2 Final.pdfPreliminary Ecological Appraisal (R2 Final) | 11 May 2026 | View |
| 25-019 - Planning Application - Covering Letter - Planning Statement.pdfCovering Letter - Planning Statement | 15 May 2026 | View |
| Imperial Park The_Statutory_Metric_Macro_Enabled_1.0.4 Final R2.xlsbBNG The Statutory Metric Macro Enabled 1.0.4 Final R2 | 15 May 2026 | View |
| 256088-BGP-01-XX-T-C-0002-FloodRiskAssessment-P01.pdfFlood Risk Assessment | 9 Jun 2026 | View |
| ABS006_PIR-02 Imperial Park, Middlesbrough_compressed.pdfPreliminary Investigation Report | 11 Jun 2026 | View |
| 25-019_AVG IMPERIAL AVENUE - COVERING LETTER - RESPONSE TO NETWORK RAIL_Rev1.pdfCover Letter - Response to Network Rail Consultation Comments | 23 Sept 2026 | View |
| 256088-BGP-01-XX-T-C-0001-Drainage Philosophy-P02.pdfDrainage Philosophy Amended | 23 Sept 2026 | View |
| 256088-BGP-01-XX-T-C-0003-SuDSManagementPlan-P02.pdfSUDS Management Plan Amended | 23 Sept 2026 | View |
Documents open on the council website. Browse council documents if a link has changed.
We haven’t collected any decision conditions for this application.
Related records could not be loaded.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.