Council planning record

Discharge of Requirement 11(3) (Permanent Surface and Foul Water Drainage) which relate specifically to Work Nos. 1, 3b and 7 of the NZT DCO of reference number EN010103 for the Net Zero Teesside Order 2024 (the ‘Order’), which was made by the Secretary of State for the Department for Energy Securi...

LAND AT AND IN THE VICINITY OF THE FORMER REDCAR STEEL WORKS SITE REDCAR AND STOCKTON ON TEES TEESSIDE

ApprovedReference: R/2025/0259/CDRedcar and Cleveland Borough Council

Last published check: 15 Oct 2026, 14:40. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Decision Date

    Published milestoneCouncil source

Application summary

Status
Approved
Application type
Condition Discharge
Received
14 Apr 2025
Validated
14 Apr 2025
Determination deadline
Not published
Local authority
Redcar and Cleveland Borough Council

Application overview

Discharge of Requirement 11(3) (Permanent Surface and Foul Water Drainage) which relate specifically to Work Nos. 1, 3b and 7 of the NZT DCO of reference number EN010103 for the Net Zero Teesside Order 2024 (the ‘Order’), which was made by the Secretary of State for the Department for Energy Securi...

Proposal details

Reference
R/2025/0259/CD
Agent
DWD PLANNING AND PROPERTY LIMITED

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

LAND AT AND IN THE VICINITY OF THE FORMER REDCAR STEEL WORKS SITE REDCAR AND STOCKTON ON TEES TEESSIDE

This record has no verified map location.

Documents 11 of 11

DocumentPublishedAction
ApplicationFormRedacted.pdfApplication Form14 Apr 2025View
EA_R20250259CD_OFFICIAL_070525.pdfConsultee response - Environment Agency7 May 2025View
NWL.pdfConsultee response - Northumbrian Water20 May 2025View
LLFA.pdfConsultee response - Engineers (Local Lead Flood Authority)2 Jun 2025View
Compliance Decision Notice_R20250259CD.pdfCompliance Decision Notice9 Jun 2025View
Compliance Officer report _R20250259CD.pdfCompliance Officer Report9 Jun 2025View
NZT R.11(3) - Drainage Design - Ref. NS051-CV-PHI-012-A00-00001_B02.pdfNet Zero Teesside – Surface Drainage Philosophy and Design Specification14 Apr 2025View
Scheme-NS051-PR-PHI-012-A00-0001.pdfDrainage Design Specification – Drainage Schematic Diagram14 Apr 2025View
250212 - NZT DCO - Requirement 11(3) - Covering Letter.pdfCovering Letter14 Apr 2025View
NZT-CSW-ATT-01.pdfDrainage Design Specification – Drainage Layout14 Apr 2025View
NZT-GUN-GENERAL-LAYOUT CSW.pdfDrainage Design Specification – General Layout14 Apr 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

CONDITION DISCHARGE GRANTED
Compliance Decision Notice_R20250259CD.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.