Partial Discharge of Requirement 3 (Detailed Design), paragraph 1 and 8 of reference number EN010103 for The Net Zero Teesside Order 2024 (the ‘Order’), which was made by the Secretary of State for the Department for Energy Security and Net Zero pursuant to section 114 ‘Grant or refusal of developme...

LAND AT AND IN THE VICINITY OF THE FORMER REDCAR STEEL WORKS SITE REDCAR AND STOCKTON ON TEES TEESSIDE

ApprovedReference: R/2024/0852/CDRedcar and Cleveland Borough Council

Last published check: 15 Oct 2026, 21:45. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Decision Date

    Published milestoneCouncil source

Application summary

Status
Approved
Application type
Condition Discharge
Received
20 Dec 2024
Validated
20 Dec 2024
Determination deadline
Not published
Local authority
Redcar and Cleveland Borough Council

Application overview

Partial Discharge of Requirement 3 (Detailed Design), paragraph 1 and 8 of reference number EN010103 for The Net Zero Teesside Order 2024 (the ‘Order’), which was made by the Secretary of State for the Department for Energy Security and Net Zero pursuant to section 114 ‘Grant or refusal of developme...

Proposal details

Reference
R/2024/0852/CD
Agent
DWD Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

LAND AT AND IN THE VICINITY OF THE FORMER REDCAR STEEL WORKS SITE REDCAR AND STOCKTON ON TEES TEESSIDE

This record has no verified map location.

Documents 33 of 33

DocumentPublishedAction
NZT - Req 3(1) and (8) Forms(1).pdfApplication Form21 Jan 2025View
Consultee Response - NSMP Entities.pdfConsultee Response - NSMP Entities15 Jan 2025View
Decision Notice(2).pdfDecision Notice24 Feb 2025View
Officer Report.pdfOfficer Report20 Feb 2025View
ApplicationFormRedacted.pdfApplication Form20 Dec 2024View
DCO-21774C-002 NZT SITE PLAN - ELEVATION SOUTH 1.pdfRequirement 3 - DCO 21774c 002 Nzt Site Plan Elevation South 120 Dec 2024View
DCO-21774C-003 NZT SITE PLAN - ELEVATION NORTH 1.pdfRequirement 3 - DCO 21774c 003 Nzt Site Plan Elevation North 120 Dec 2024View
DCO-21774C-004 NZT SITE PLAN - ELEVATION WEST 1.pdfRequirement 3 - DCO 21774c 004 Nzt Site Plan Elevation West 120 Dec 2024View
DCO-21774C-005 NZT SITE PLAN - ELEVATION EAST 1.pdfRequirement 3 - DCO 21774c 005 Nzt Site Plan Elevation East 120 Dec 2024View
DCO-21774C-006 OVERALL PLOT PLAN FOR DCO (1).pdfRequirement 3 - DCO 21774c 006 Overall Plot Plan For DCO20 Dec 2024View
DCO-21774C-007 CIVIL AREA PLAN 1.pdfRequirement 3 - DCO 21774c 007 Civil Area Plan 120 Dec 2024View
NZT - Architectural Elevation Control Building (NS051-AR-GAS-012-A02-06300-003).pdfRequirement 3 - Architectural Elevation Control Building (ns051 Ar Gas 012 A02 06300 003)20 Dec 2024View
NZT - Architectural Elevation Substation and LER SS-01 (NS051-AR-GAS-012-B15-01300-003).pdfRequirement 3 - Architectural Elevation Substation And Ler Ss 01 (ns051 Ar Gas 012 B15 01300 003)20 Dec 2024View
NZT - Architectural Elevations Chemical Store Building (NS051-AR-GAS-012-A02-13300-002).pdfRequirement 3 - Architectural Elevations Chemical Store Building (ns051 Ar Gas 012 A02 13300 002)20 Dec 2024View
NZT - Architectural Elevations Lab Building (NS051-AR-GAS-012-A02-08300-002).pdfRequirement 3 - Architectural Elevations Lab Building (ns051 Ar Gas 012 A02 08300 002)20 Dec 2024View
NZT - Architectural Elevations Refuge Building B30 (NS051-AR-GAS-012-A02-09300-002).pdfRequirement 3 - Architectural Elevations Refuge Building B30 (ns051 Ar Gas 012 A02 09300 002)20 Dec 2024View
NZT - Architectural Elevations Refuge Building C50 (NS051-AR-GAS-012-A02-10300-002).pdfRequirement 3 - Architectural Elevations Refuge Building C50 (ns051 Ar Gas 012 A02 10300 002)20 Dec 2024View
NZT - Architectural Elevations Substation and LER SS-02 (NS051-AR-GAS-012-B30-02300-004).pdfRequirement 3 - Architectural Elevations Substation And Ler Ss 02 (ns051 Ar Gas 012 B30 02300 004)20 Dec 2024View
NZT - Architectural Elevations Substation SS-03 (NS051-AR-GAS-012-C50-03300-004).pdfRequirement 3 - Architectural Elevations Substation Ss 03 (ns051 Ar Gas 012 C50 03300 004)20 Dec 2024View
NZT - Architectural Elevations Workshop Warehouse (NS051-AR-GAS-012-A02-15300-003).pdfRequirement 3 - Architectural Elevations Workshop Warehouse (ns051 Ar Gas 012 A02 15300 003)20 Dec 2024View
NZT - Architectural Material Sample Board (NS051-AR-DTL-012-A00-19000-001).pdfRequirement 3 - Architectural Material Sample Board (ns051 Ar Dtl 012 A00 19000 001)20 Dec 2024View
NZT - Architectural Site Plan Chemical Store Lab Warehouse (NS051-AR-GAS-012-A02-08000-002).pdfRequirement 3 - Architectural Site Plan Chemical Store Lab Warehouse (ns051 Ar Gas 012 A02 08000 002)20 Dec 2024View
NZT - Architectural Site Plan Control Building (NS051-AR-GAS-012-A02-06000-002).pdfRequirement 3 - Architectural Site Plan Control Building (ns051 Ar Gas 012 A02 06000 002)20 Dec 2024View
NZT - Architectural Elevations Gatehouse (NS051-AR-GAS-012-A30-14300-002).pdfRequirement 3 - Architectural Elevations Gatehouse (ns051 Ar Gas 012 A30 14300 002)20 Dec 2024View
NZT - Architectural Site Plan Gatehouse (NS051-AR-GAS-012-A30-14000-002).pdfRequirement 3 - Architectural Site Plan Gatehouse (ns051 Ar Gas 012 A30 14000 002)20 Dec 2024View
NZT - Architectural Site Plan Refuge Building B30 (NS051-AR-GAS-012-A02-09000-002).pdfRequirement 3 - Architectural Site Plan Refuge Building B30 (ns051 Ar Gas 012 A02 09000 002)20 Dec 2024View
NZT - Architectural Site Plan Refuge Building C50 (NS051-AR-GAS-012-A02-10000-002).pdfRequirement 3 - Architectural Site Plan Refuge Building C50 (ns051 Ar Gas 012 A02 10000 002)20 Dec 2024View
NZT - Architectural Site Plan Substation and LER SS-01 (NS051-AR-GAS-012-B15-01000-002).pdfRequirement 3 - Architectural Site Plan Substation And Ler Ss 01 (ns051 Ar Gas 012 B15 01000 002)20 Dec 2024View
NZT - Architectural Site Plan Substation and LER SS-02 (NS051-AR-GAS-012-B30-02000-002).pdfRequirement 3 - Architectural Site Plan Substation And Ler Ss 02 (ns051 Ar Gas 012 B30 02000 002)20 Dec 2024View
NZT - Architectural Site Plan Substation and LER SS-03 (NS051-AR-GAS-012-C50-03000-002).pdfRequirement 3 - Architectural Site Plan Substation And Ler Ss 03 (ns051 Ar Gas 012 C50 03000 002)20 Dec 2024View
NZT - Architectural Elevations Gas Turbine Hall.pdfRequirement 3 - Architectural Elevations Gas Turbine Hall20 Dec 2024View
NZT - Architectural Site Plan Gas Turbine Hall.pdfRequirement 3 - Architectural Site Plan Gas Turbine Hall20 Dec 2024View
NZT DCO - Requirement 3(1) and (8) (Detailed Design) Covering Letter DRAFT.pdfRequirement 3(1) And (8) (detailed Design) Covering Letter21 Jan 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

CONDITION DISCHARGE GRANTED
Decision Notice(2).pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.