Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Land at the Foundry Site (Foundry Central), Teesworks, other land at Teesworks and land in the vicinity of and at Wilton International site and Lackenby
Last published check: 29 Oct 2026, 13:23. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceConstruction of an electrolytic low carbon hydrogen production facility, hydrogen export pipeline network, electricity and water connections, including water supply and effluent discharge, above ground installations, construction and laydown areas, and ancillary development
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsLand at the Foundry Site (Foundry Central), Teesworks, other land at Teesworks and land in the vicinity of and at Wilton International site and Lackenby
This record has no verified map location.
| Document | Published | Action |
|---|---|---|
| ApplicationFormRedacted.pdfApplication Form | 22 Apr 2024 | View |
| Covering Letter.pdfCovering Letter | 22 Apr 2024 | View |
| HyGreen CIL form.pdfApplication Form - CIL Form | 22 Apr 2024 | View |
| Redcar BC Electrolytic low carbon hydrogen facility Teeworks RC011.pdfConsultee response - Sabic Pipeline Operator (TPEP) | 25 Apr 2024 | View |
| 1400020761(5).pdfConsultee response - Northern Gas Network Map 1 | 30 Apr 2024 | View |
| NGN Map 2.pdfConsultee response - Northern Gas Network Map 2 | 30 Apr 2024 | View |
| 1400020761.pdfConsultee response - Northern Gas Network Map 3 | 30 Apr 2024 | View |
| 1400020761(2).pdfConsultee response - Northern Gas Network Map 4 | 30 Apr 2024 | View |
| 1400020761(3).pdfConsultee response - Northern Gas Network Map 5 | 30 Apr 2024 | View |
| 1400020761(4).pdfConsultee response - Northern Gas Network Map 6 | 30 Apr 2024 | View |
| Planning Strategy.pdfConsultee response - Strategic Planning (Policy) | 8 May 2024 | View |
| MGE05267 Contaminated Land.pdfConsultee response - Environmental Protection (Contaminated Land) | 13 May 2024 | View |
| HSE LUP team response to RCBC - R-2024-0271-ERM - 15 May 2024.pdfConsultee response - Health & Safety Executive LUP team | 15 May 2024 | View |
| 0271 Nusiance.pdfConsultee response - Environmental Protection (Nuisance) | 16 May 2024 | View |
| Police ALO Comments.pdfConsultee response - Cleveland Police | 17 May 2024 | View |
| Consultee Response North East Archaeological Research Limited.pdfConsultee Response - North East Archaeological Research Limited | 21 May 2024 | View |
| R20240271ESM - Planning Objection - Hygreen.pdfConsultee response - Wood Group CATS Pipeline | 22 May 2024 | View |
| NWL.pdfConsultee response - Northumbrian Water | 22 May 2024 | View |
| 2024 05 22 HyGreenHydrogen NoObj.pdfConsultee response - National Highways | 24 May 2024 | View |
| 474303_R_2024_0271_ESM_HyGreen_NEresponse_24.5.24.pdfConsultee response - Natural England | 28 May 2024 | View |
| EA_R.2024.0271.ESM_Official_31.05.2024.pdfConsultee response - Environment Agency | 31 May 2024 | View |
| Consultee Response - Network Rail.pdfConsultee Response - Network Rail | 14 Jun 2024 | View |
| LLFA response.pdfConsultee response - Engineers (Local Lead Flood Authority) | 17 Sept 2024 | View |
| 490618_R_2024_0271_ESM_HyGreen_AdditonalInfo_NEresponse_15.11.24.pdfConsultee response - Natural England | 18 Nov 2024 | View |
| Highways.pdfConsultee response - Engineering Team (Highways) | 16 Dec 2024 | View |
| 494675_R_2024_0271_ESM_HyGreen_AdditonalInfo_NEresponse_19.12.24.pdfConsultee response - Natural England | 19 Dec 2024 | View |
| 504617_R_2024_0271_ESM_HyGreen_NE_response30.4.25.pdfConsultee response - Natural England | 1 May 2025 | View |
| Location Plan.pdfLocation Plan (Sheet 1 of 23) | 23 Apr 2024 | View |
| Page 4 location.pdfLocation Plan Page 4 of 23 | 23 Apr 2024 | View |
| Page 5 location.pdfLocation Plan Page 5 of 23 | 23 Apr 2024 | View |
| Page 6 location.pdfLocation Plan Page 6 of 23 | 23 Apr 2024 | View |
| Page 7 location.pdfLocation Plan Page 7 of 23 | 23 Apr 2024 | View |
| Page 8 location.pdfLocation Plan Page 8 of 23 | 23 Apr 2024 | View |
| Page 9 location.pdfLocation Plan Page 9 of 23 | 23 Apr 2024 | View |
| Page 10 location.pdfLocation Plan Page 10 of 23 | 23 Apr 2024 | View |
| Page 11 location.pdfLocation Plan Page 11 of 23 | 23 Apr 2024 | View |
| Page 12 location.pdfLocation Plan Page 12 of 23 | 23 Apr 2024 | View |
| Page 13 location.pdfLocation Plan Page 13 of 23 | 23 Apr 2024 | View |
| Page 14 location.pdfLocation Plan Page 14 of 23 | 23 Apr 2024 | View |
| Page 15 location.pdfLocation Plan Page 15 of 23 | 23 Apr 2024 | View |
| Page 16 location.pdfLocation Plan Page 16 of 23 | 23 Apr 2024 | View |
| Page 17 location.pdfLocation Plan Page 17 of 23 | 23 Apr 2024 | View |
| Page 18 location.pdfLocation Plan Page 18 of 23 | 23 Apr 2024 | View |
| Page 19 location.pdfLocation Plan Page 19 of 23 | 23 Apr 2024 | View |
| Page 20 location.pdfLocation Plan Page 20 of 23 | 23 Apr 2024 | View |
| Page 21 location.pdfLocation Plan Page 21 of 23 | 23 Apr 2024 | View |
| Page 22 location.pdfLocation Plan Page 22 of 23 | 23 Apr 2024 | View |
| Page 23 location.pdfLocation Plan Page 23 of 23 | 23 Apr 2024 | View |
| Page 2 location.pdfLocation Plan Page 2 of 23 | 23 Apr 2024 | View |
| Page 3 location.pdfLocation Plan Page 3 of 23 | 23 Apr 2024 | View |
| COMMENTS Ineos.pdfNeighbour Comments - INEOS UK SNS Limited | 24 Apr 2024 | View |
| 50303-24 - AA Representation - App R_24_0271_ESM - RCBC - 080524(32130394.1).pdfNeighbour Comments - Lichfields on Behalf of Anglo American | 8 May 2024 | View |
| Neighbour Comments British Steel(1).pdfNeighbour Comments - British Steel | 9 May 2024 | View |
| Planning_Application_Objection_Letter_(ref__R_2024_2071_ESM).docx(1).pdfNeighbour Comments - Mishcon de Reya LLP on behalf of Redcar Bulk Terminal | 9 May 2024 | View |
| neighbour comments - Cartman B.pdfNeighbour Comments - Cartman B | 31 May 2024 | View |
| HyGreen ES APPENDIX 11-A baseline appendix_Ornithology REDACTED_Optimized.pdfEnvironmental Statement Appendix 11 A Baseline Appendix Ornithology Redacted Optimized | 22 Apr 2024 | View |
| HyGreen - 41500-00414-PT-DGA-00006 - Plan View and Isometric view .pdfPlan View And Isometric View | 22 Apr 2024 | View |
| HyGreen - 415000-00414 - PL - DLP - 00001_A - HYGREEN PIPELINES AND INFRASTRUCTURE DRAWING OVERALL LAYOUT.pdfPipelines And Infrastructure Drawing Overall Layout | 22 Apr 2024 | View |
| HyGreen - 415000-00414-00-EL-DGA-00001-001 Connection Cable Routing.pdfConnection Cable Routing | 22 Apr 2024 | View |
| HyGreen - 416041-50717-01-CI-DAL-00001 -OVERALL FOUNDATION LAYOUT FOR HYGREEN AT FOUNDRY.pdfOverall Foundation Layout | 22 Apr 2024 | View |
| HyGreen - 416041-50717-01-PI-DPP-00001-01_Rev-B (004)- Plot Plan for HyGreen at Foundry.pdfPlot Plan For Hygreen At Foundry | 22 Apr 2024 | View |
| HyGreen - 416041-50717-01-PI-DPP-00001-02_Rev-B-Plot Plan Layout for HyGreen at Foundry.pdfPlot Plan Layout For Hygreen At Foundry | 22 Apr 2024 | View |
| HyGreen - 415000-00414-PL-DGA-00001-001 and 002 AGI GENERAL ARRANGMENT.pdfAGI General Arrangment Plant End Of Line Sheet 1 | 22 Apr 2024 | View |
| HyGreen - Access Plan for HyGreen.pdfAccess Plan For Hygreen | 22 Apr 2024 | View |
| HyGreen - Access South.pdfAccess South | 22 Apr 2024 | View |
| HyGreen - Access North.pdfAccess North | 22 Apr 2024 | View |
| HyGreen - Figure 1 - Outline Landscape and Management Plan.pdfFigure 1 Outline Landscape And Management Plan | 22 Apr 2024 | View |
| HyGreen - 416041-50717-01-CI-DAL-11002 - DRAINAGE LAYOUT.pdfDrainage Layout | 22 Apr 2024 | View |
| HyGreen - 41500-00414-PT-DGA-00009 - Elevation and Section Views Sections A and B.pdfElevation And Section Views Sections A And B | 22 Apr 2024 | View |
| HyGreen - 41500-00414-PT-DGA-00008 - Elevation and Section Views Looking South and West .pdfElevation And Section Views Looking South And West | 22 Apr 2024 | View |
| HyGreen - 41500-00414-PT-DGA-00007 - Elevation and Section Views Looking North and East.pdfElevation And Section Views Looking North And East | 22 Apr 2024 | View |
| Construction Area Yard Layout 1 of 5.pdfConstruction Area Yard Layout 1 of 5 | 22 Apr 2024 | View |
| Construction Area Yard Layout 2 of 5.pdfConstruction Area Yard Layout 2 of 5 | 22 Apr 2024 | View |
| Construction Area Yard Layout 3 of 5.pdfConstruction Area Yard Layout 3 of 5 | 22 Apr 2024 | View |
| Construction Area Yard Layout 4 of 5.pdfConstruction Area Yard Layout 4 of 5 | 22 Apr 2024 | View |
| Construction Area Yard Layout 5 of 5.pdfConstruction Area Yard Layout 5 of 5 | 22 Apr 2024 | View |
| Typical Construction Right of Way Buried Open Cut Sheet 1 of 3.pdfTypical Construction Right of Way Buried Open Cut Sheet 1 of 3 | 22 Apr 2024 | View |
| Typical Construction Right of Way ABOVE GROUND PIPE CORRIDOR Sheet 2 of 3.pdfTypical Construction Right of Way above ground pipe corridor Sheet 2 of 3 | 22 Apr 2024 | View |
| Typical Construction Right of Way Pipe Racking and Pipe Bridges Sheet 3 of 3.pdfTypical Construction Right of Way Pipe Racking and Pipe Bridges Sheet 3 of 3 | 22 Apr 2024 | View |
| AGI General Arrangement Sheet NGN End of Line Sheet 2.pdfAGI General Arrangement NGN End of Line Sheet 2 | 22 Apr 2024 | View |
| Pipelines and Infrastructure Plant Approach 1 of 5.pdfPipelines and Infrastructure Plant Approach 1 of 5 | 22 Apr 2024 | View |
| Pipelines and Infrastructure Plant Approach 2 of 5.pdfPipelines and Infrastructure Plant Approach 2 of 5 | 22 Apr 2024 | View |
| Pipelines and Infrastructure Plant Approach 3 of 5.pdfPipelines and Infrastructure Plant Approach 3 of 5 | 22 Apr 2024 | View |
| Pipelines and Infrastructure Plant Approach 4 of 5.pdfPipelines and Infrastructure Plant Approach 4 of 5 | 22 Apr 2024 | View |
| Pipelines and Infrastructure Plant Approach 5 of 5.pdfPipelines and Infrastructure Plant Approach 5 of 5 | 22 Apr 2024 | View |
| Pipelines and Infrastructure Overall AGI Layout Sheet 1 of 4.pdfPipelines and Infrastructure Overall AGI Layout Sheet 1 of 4 | 22 Apr 2024 | View |
| Pipelines and Infrastructure Overall AGI Layout Sheet 2 of 4.pdfPipelines and Infrastructure Overall AGI Layout Sheet 2 of 4 | 22 Apr 2024 | View |
| Pipelines and Infrastructure Overall AGI Layout Sheet 3 of 4.pdfPipelines and Infrastructure Overall AGI Layout Sheet 3 of 4 | 22 Apr 2024 | View |
| Pipelines and Infrastructure Overall AGI Layout Sheet 4 of 4.pdfPipelines and Infrastructure Overall AGI Layout Sheet 4 of 4 | 22 Apr 2024 | View |
| Planning Application Site Boundary Sheet 3 of 8.pdfFigure 1 Planning Application Site Boundary Sheet 3 of 8 | 22 Apr 2024 | View |
| Planning Application Site Boundary Sheet 2 of 8.pdfFigure 1 Planning Application Site Boundary Sheet 2 of 8 | 22 Apr 2024 | View |
| Planning Application Site Boundary Sheet 1 of 8.pdfFigure 1 Planning Application Site Boundary Sheet 1 of 8 | 22 Apr 2024 | View |
| Planning Application Site Boundary Sheet 8 of 8.pdfFigure 1 Planning Application Site Boundary Sheet 8 of 8 | 22 Apr 2024 | View |
| Planning Application Site Boundary Sheet 7 of 8.pdfFigure 1 Planning Application Site Boundary Sheet 7 of 8 | 22 Apr 2024 | View |
| Planning Application Site Boundary Sheet 6 of 8.pdfFigure 1 Planning Application Site Boundary Sheet 6 of 8 | 22 Apr 2024 | View |
| Planning Application Site Boundary Sheet 5 of 8.pdfFigure 1 Planning Application Site Boundary Sheet 5 of 8 | 22 Apr 2024 | View |
| Planning Application Site Boundary Sheet 4 of 8.pdfFigure 1 Planning Application Site Boundary Sheet 4 of 8 | 22 Apr 2024 | View |
| HyGreen ES Report Chapter 1 INTRODUCTION_FINAL.pdfEnvironmental Statement Report - Chapter 1 Introduction Final | 22 Apr 2024 | View |
| Hygreen ES Report Chapter 11 Ornithology REDACTED.pdfEnvironmental Statement Report - Chapter 11 Ornithology Redacted | 22 Apr 2024 | View |
| HyGreen ES Report Chapter 7 PLANNING POLICY CONTEXT_FINAL.pdfEnvironmental Statement Report - Chapter 7 Planning Policy Context Final | 22 Apr 2024 | View |
| HyGreen ES Report Chapter 8 WATER ENVIRONMENT FINAL.pdfEnvironmental Statement Report - Chapter 8 Water Environment Final | 22 Apr 2024 | View |
| HyGreen ES Report Chapter 9 GEOLOGY - FINAL.pdfEnvironmental Statement Report - Chapter 9 Geology Final | 22 Apr 2024 | View |
| HyGreen ES Report Chapter 10 ECOLOGY AND NATURE CONSERVATION_FINAL.pdfEnvironmental Statement Report - Chapter 10 Ecology And Nature Conservation Final | 22 Apr 2024 | View |
| HyGreen ES Report Chapter 2 ASSESSMENT METHODOLOGY_FINAL.pdfEnvironmental Statement Report - Chapter 2 Assessment Methodology Final | 22 Apr 2024 | View |
| HyGreen ES Report Chapter 3 DESCRIPTION OF THE EXISTING ENVIRONMENT_FINAL.pdfEnvironmental Statement Report - Chapter 3 Description Of The Existing Environment Final | 22 Apr 2024 | View |
| HyGreen ES Report Chapter 4 PROPOSED DEVELOPMENT_FINAL.pdfEnvironmental Statement Report - Chapter 4 Proposed Development Final | 22 Apr 2024 | View |
| HyGreen ES Report Chapter 5 CONSTRUCTION - FINAL.pdfEnvironmental Statement Report - Chapter 5 Construction Final | 22 Apr 2024 | View |
| HyGreen ES Report Chapter 6 ALTERNATIVES AND DESIGN EVOLUTION_FINAL.pdfEnvironmental Statement Report - Chapter 6 Alternatives And Design Evolution Final | 22 Apr 2024 | View |
| HyGreen ES Report Chapter 17 SOCIO-ECONOMICS AND LAND USE_FINAL.pdfEnvironmental Statement Report - Chapter 17 Socio Economics And Land Use Final | 22 Apr 2024 | View |
| HyGreen ES Report Chapter 18 MAJOR ACCIDENTS AND DISASTERS_FINAL.pdfEnvironmental Statement Report - Chapter 18 Major Accidents And Disasters Final | 22 Apr 2024 | View |
| HyGreen ES Report Chapter 19 MATERIALS AND WASTE_FINAL.pdfEnvironmental Statement Report - Chapter 19 Materials And Waste Final | 22 Apr 2024 | View |
| HyGreen ES Report Chapter 20 Human Health_FINAL.pdfEnvironmental Statement Report - Chapter 20 Human Health Final | 22 Apr 2024 | View |
| HyGreen ES Report Chapter 21 CLIMATE CHANGE_FINAL.pdfEnvironmental Statement Report - Chapter 21 Climate Change Final | 22 Apr 2024 | View |
| HyGreen ES Report Chapter 23 Summary of Significant Effects_FINAL.pdfEnvironmental Statement Report - Chapter 23 Summary Of Significant Effects Final | 22 Apr 2024 | View |
| HyGreen ES Report Chapter 12 LANDSCAPE AND VISUAL AMENITY_FINAL.pdfEnvironmental Statement Report - Chapter 12 Landscape And Visual Amenity Final | 22 Apr 2024 | View |
| HyGreen ES Report Chapter 13 Cultural Heritage_FINAL.pdfEnvironmental Statement Report - Chapter 13 Cultural Heritage Final | 22 Apr 2024 | View |
| HyGreen ES Report Chapter 14 TRAFFIC AND TRANSPORTATION_FINAL.pdfEnvironmental Statement Report - Chapter 14 Traffic And Transportation Final | 22 Apr 2024 | View |
| HyGreen ES Report Chapter 15 AIR QUALITY_FINAL.pdfEnvironmental Statement Report - Chapter 15 Air Quality Final | 22 Apr 2024 | View |
| HyGreen ES Report Chapter 16 NOISE AND VIBRATION_FINAL.pdfEnvironmental Statement Report - Chapter 16 Noise And Vibration Final | 22 Apr 2024 | View |
| Figure 1-1 - The Proposed Development Site.pdfEnvironmental Statement Figure 1 1 The Proposed Development Site | 22 Apr 2024 | View |
| Figure 3-1 - Areas of the Proposed Development Site.pdfEnvironmental Statement Figure 3 1 Areas Of The Proposed Development Site | 22 Apr 2024 | View |
| Figure 4-2 - Electricity Connection Corridor.pdfEnvironmental Statement Figure 4 2 Electricity Connection Corridor | 22 Apr 2024 | View |
| Figure 4-3 - Water Connection Corridor.pdfEnvironmental Statement Figure 4 3 Water Connection Corridor | 22 Apr 2024 | View |
| Figure 4-5 - Water Process Schematic.pdfEnvironmental Statement Figure 4 5 Water Process Schematic | 22 Apr 2024 | View |
| Figure 4-6 - Indicative Plot Layout (Main Site).pdfEnvironmental Statement Figure 4 6 Indicative Plot Layout (main Site) | 22 Apr 2024 | View |
| Figure 4-1 - Hydrogen Export Pipeline Corridor.pdfEnvironmental Statement Figure 4 1 Hydrogen Export Pipeline Corridor | 22 Apr 2024 | View |
| Figure 5-2 - Indicative Pipeline Routings and Construction Methodologies.pdfEnvironmental Statement Figure 5 2 Indicative Pipeline Routings And Construction Methodologies | 22 Apr 2024 | View |
| Figure 5-1 - Construction Compound and Laydown Areas.pdfEnvironmental Statement Figure 5 1 Construction Compound And Laydown Areas | 22 Apr 2024 | View |
| Figure 8-2 - Groundwater Features and their Attributes.pdfEnvironmental Statement Figure 8 2 Groundwater Features And Their Attributes | 22 Apr 2024 | View |
| Figure 8-3 - Fluvial Flood Risk.pdfEnvironmental Statement Figure 8 3 Fluvial Flood Risk | 22 Apr 2024 | View |
| Figure 8-4 - Surface Water Flood Risk.pdfEnvironmental Statement Figure 8 4 Surface Water Flood Risk | 22 Apr 2024 | View |
| Figure 8-1 - Surface Water Features and their Attributes.pdfEnvironmental Statement Figure 8 1 Surface Water Features And Their Attributes | 22 Apr 2024 | View |
| Figure 9-16 - Groundwater Abstraction.pdfEnvironmental Statement Figure 9 16 Groundwater Abstraction | 22 Apr 2024 | View |
| Figure 9-17- Surface Water Abstraction.pdfEnvironmental Statement Figure 9 17 Surface Water Abstraction | 22 Apr 2024 | View |
| Figure 9-18a - NGS Collapsible Deposits.pdfEnvironmental Statement Figure 9 18a Natural Ground Subsidence Collapsible Deposits | 22 Apr 2024 | View |
| Figure 9-18b - NGS Compressible Deposits.pdfEnvironmental Statement Figure 9 18b Natural Ground Subsidence Compressible Deposits | 22 Apr 2024 | View |
| Figure 9-18c - NGS Ground Dissolution of Soluble Rocks.pdfEnvironmental Statement Figure 9 18c Natural Ground Subsidence Ground Dissolution Of Soluble Rocks | 22 Apr 2024 | View |
| Figure 9-18d - NGS Landslides.pdfEnvironmental Statement Figure 9 18d Natural Ground Subsidence Landslides | 22 Apr 2024 | View |
| Figure 9-18e - NGS Running Sand.pdfEnvironmental Statement Figure 9 18e Natural Ground Subsidence Running Sand | 22 Apr 2024 | View |
| Figure 9-18f - NGS Shrink Swell Clays.pdfEnvironmental Statement Figure 9 18f Natural Ground Subsidence Shrink Swell Clays | 22 Apr 2024 | View |
| Figure 9-19a - Agricultural Land Classification - Main Site.pdfEnvironmental Statement Figure 9 19a Agricultural Land Classification Main Site | 22 Apr 2024 | View |
| Figure 9-19b - Agricultural Land Classification - Water and Wastewater Connection Works.pdfEnvironmental Statement Figure 9 19b Agricultural Land Classification Water And Wastewater Connection Works | 22 Apr 2024 | View |
| Figure 9-19c - Agricultural Land Classification - Electrical Connection Works.pdfEnvironmental Statement Figure 9 19c Agricultural Land Classification Electrical Connection Works | 22 Apr 2024 | View |
| Figure 9-19d - Agricultural Land Classification - Hydrogen Distribution Network.pdfEnvironmental Statement Figure 9 19d Agricultural Land Classification Hydrogen Distribution Network | 22 Apr 2024 | View |
| Figure 9-20 - Brit Pits.pdfEnvironmental Statement Figure 9 20 Brit Pits | 22 Apr 2024 | View |
| Figure 9-21 - Non Coal Minings.pdfEnvironmental Statement Figure 9 21 Non Coal Minings | 22 Apr 2024 | View |
| Figure 9-22 - Surface Ground Workings.pdfEnvironmental Statement Figure 9 22 Surface Ground Workings | 22 Apr 2024 | View |
| Figure 9-23 - Underground Workings.pdfEnvironmental Statement Figure 9 23 Underground Workings | 22 Apr 2024 | View |
| Figure 9-11 - Discharge Consents.pdfEnvironmental Statement Figure 9 11 Discharge Consents | 22 Apr 2024 | View |
| Figure 9-12a - Superficial Aquifers - Main Site .pdfEnvironmental Statement Figure 9 12a Superficial Aquifers Main Site | 22 Apr 2024 | View |
| Figure 9-12b - Superficial Aquifers - Water and Wastewater Connection Works.pdfEnvironmental Statement Figure 9 12b Superficial Aquifers Water And Wastewater Connection Works | 22 Apr 2024 | View |
| Figure 9-12c - Superficial Aquifers - Electrical Connection Works.pdfEnvironmental Statement Figure 9 12c Superficial Aquifers Electrical Connection Works | 22 Apr 2024 | View |
| Figure 9-12d - Superficial Aquifers - Hydrogen Distribution Network.pdfEnvironmental Statement Figure 9 12d Superficial Aquifers Hydrogen Distribution Network | 22 Apr 2024 | View |
| Figure 9-13a - Bedrock Aquifers - Main Site.pdfEnvironmental Statement Figure 9 13a Bedrock Aquifers Main Site | 22 Apr 2024 | View |
| Figure 9-13b - Bedrock Aquifers - Water and Wastewater Connection Works.pdfEnvironmental Statement Figure 9 13b Bedrock Aquifers Water And Wastewater Connection Works | 22 Apr 2024 | View |
| Figure 9-13c - Bedrock Aquifers - Electrical Connection Works.pdfEnvironmental Statement Figure 9 13c Bedrock Aquifers Electrical Connection Works | 22 Apr 2024 | View |
| Figure 9-13d - Bedrock Aquifers - Hydrogen Distribution Network.pdfEnvironmental Statement Figure 9 13d Bedrock Aquifers Hydrogen Distribution Network | 22 Apr 2024 | View |
| Figure 9-14a - Groundwater Vulnerability - Main Site.pdfEnvironmental Statement Figure 9 14a Groundwater Vulnerability Main Site | 22 Apr 2024 | View |
| Figure 9-14b - Groundwater Vulnerability - Water and Wastewater Connection Works.pdfEnvironmental Statement Figure 9 14b Groundwater Vulnerability Water And Wastewater Connection Works | 22 Apr 2024 | View |
| Figure 9-14c - Groundwater Vulnerability - Electrical Connection Works.pdfEnvironmental Statement Figure 9 14c Groundwater Vulnerability Electrical Connection Works | 22 Apr 2024 | View |
| Figure 9-14d - Groundwater Vulnerability - Hydrogen Distribution Network.pdfEnvironmental Statement Figure 9 14d Groundwater Vulnerability Hydrogen Distribution Network | 22 Apr 2024 | View |
| Figure 9-15 - Groundwater Source Protection Zones.pdfEnvironmental Statement Figure 9 15 Groundwater Source Protection Zones | 22 Apr 2024 | View |
| Figure 9-5 - Faults and Linear Features.pdfEnvironmental Statement Figure 9 5 Faults And Linear Features | 22 Apr 2024 | View |
| Figure 9-6 - Waste and Landfills.pdfEnvironmental StatementFigure 9 6 Waste And Landfills | 22 Apr 2024 | View |
| Figure 9-7 - Hazardous Sites.pdfEnvironmental Statement Figure 9 7 Hazardous Sites | 22 Apr 2024 | View |
| Figure 9-8a - Historical Industrial Landuses.pdfEnvironmental Statement Figure 9 8a Historical Industrial Landuses | 22 Apr 2024 | View |
| Figure 9-8b - Historical Industrial Landuses.pdfEnvironmental Statement Figure 9 8b Historical Industrial Landuses | 22 Apr 2024 | View |
| Figure 9-8c - Historical Industrial Landuses.pdfEnvironmental Statement Figure 9 8c Historical Industrial Landuses | 22 Apr 2024 | View |
| Figure 9-8d - Historical Industrial Landuses.pdfEnvironmental Statement Figure 9 8d Historical Industrial Landuses | 22 Apr 2024 | View |
| Figure 9-8e - Historical Industrial Landuses.pdfEnvironmental Statement Figure 9 8e Historical Industrial Landuses | 22 Apr 2024 | View |
| Figure 9-9 - Historical Tanks.pdfEnvironmental Statement Figure 9 9 Historical Tanks | 22 Apr 2024 | View |
| Figure 9-10a - Ecological Designations - Main Site.pdfEnvironmental Statement Figure 9 10a Ecological Designations Main Site | 22 Apr 2024 | View |
| Figure 9-10b - Ecological Designations - Water and Wastewater Connection Works.pdfEnvironmental Statement Figure 9 10b Ecological Designations Water And Wastewater Connection Works | 22 Apr 2024 | View |
| Figure 9-10c - Ecological Designations - Electrical Connection Works.pdfEnvironmental Statement Figure 9 10c Ecological Designations Electrical Connection Works | 22 Apr 2024 | View |
| Figure 9-10d - Ecological Designations - Hydrogen Distribution Network.pdfEnvironmental Statement Figure 9 10d Ecological Designations Hydrogen Distribution Network | 22 Apr 2024 | View |
| Figure 9-2d - Superficial Geology - Hydrogen Distribution Network.pdfEnvironmental Statement Figure 9 2d Superficial Geology Hydrogen Distribution Network | 22 Apr 2024 | View |
| Figure 9-3a - Bedrock Geology - Main Site.pdfEnvironmental Statement Figure 9 3a Bedrock Geology Main Site | 22 Apr 2024 | View |
| Figure 9-3b - Bedrock Geology - Water and Wastewater Connection Works.pdfEnvironmental Statement Figure 9 3b Bedrock Geology Water And Wastewater Connection Works | 22 Apr 2024 | View |
| Figure 9-3c - Bedrock Geology - Electrical Connection Works.pdfEnvironmental Statement Figure 9 3c Bedrock Geology Electrical Connection Works | 22 Apr 2024 | View |
| Figure 9-3d - Bedrock Geology - Hydrogen Distribution Network.pdfEnvironmental Statement Figure 9 3d Bedrock Geology Hydrogen Distribution Network | 22 Apr 2024 | View |
| Figure 9-4 - BGS Boreholes.pdfEnvironmental Statement Figure 9 4 Bgs Boreholes | 22 Apr 2024 | View |
| Figure 9-1a - Artificial Geology - Main Site.pdfEnvironmental Statement Figure 9 1a Artificial Geology Main Site | 22 Apr 2024 | View |
| Figure 9-1b - Artificial Geology - Water and Wastewater Connection Works.pdfEnvironmental Statement Figure 9 1b Artificial Geology Water And Wastewater Connection Works | 22 Apr 2024 | View |
| Figure 9-1c - Artificial Geology - Electrical Connection Works.pdfEnvironmental Statement Figure 9 1c Artificial Geology Electrical Connection Works | 22 Apr 2024 | View |
| Figure 9-1d - Artificial Geology - Hydrogen Distribution Network.pdfEnvironmental Statement Figure 9 1d Artificial Geology Hydrogen Distribution Network | 22 Apr 2024 | View |
| Figure 9-2a - Superficial Geology - Main Site.pdfEnvironmental Statement Figure 9 2a Superficial Geology Main Site | 22 Apr 2024 | View |
| Figure 9-2b - Superficial Geology - Water and Wastewater Connection Works.pdfEnvironmental Statement Figure 9 2b Superficial Geology Water And Wastewater Connection Works | 22 Apr 2024 | View |
| Figure 9-2c - Superficial Geology - Electrical Connection Works.pdfEnvironmental Statement Figure 9 2c Superficial Geology Electrical Connection Works | 22 Apr 2024 | View |
| Figure 10-2 - Non-Statutory Designations Sites within 2 km.pdfEnvironmental Statement Figure 10 2 Non Statutory Designations Sites Within 2 Km | 22 Apr 2024 | View |
| Figure 10-3 - Habitats of Principal Importance.pdfEnvironmental Statement Figure 10 3 Habitats Of Principal Importance | 22 Apr 2024 | View |
| Figure 10-1 - Statutory Designations within 10 km.pdfEnvironmental Statement Figure 10 1 Statutory Designations Within 10 Km | 22 Apr 2024 | View |
| Figure 12-3 - Zone of Theoretical Visibility and potential Viewpoint Locations.pdfEnvironmental Statement Figure 12 3 Zone Of Theoretical Visibility And Potential Viewpoint Locations | 22 Apr 2024 | View |
| Figure 12-4 - Topography.pdfEnvironmental Statement Figure 12 4 Topography | 22 Apr 2024 | View |
| Figure 12-5 - Zone of Theoretical Visibility and Representative Viewpoint Locations.pdfEnvironmental Statement Figure 12 5 Zone Of Theoretical Visibility And Representative Viewpoint Locations | 22 Apr 2024 | View |
| Figure 12-7 Photomontages.pdfEnvironmental Statement Figure 12 7 Photomontages | 22 Apr 2024 | View |
| Figure 12-1 - Landscape Context.pdfEnvironmental Statement Figure 12 1 Landscape Context | 22 Apr 2024 | View |
| Figure 12-2 - Landscape Character.pdfEnvironmental Statement Figure 12 2 Landscape Character | 22 Apr 2024 | View |
| Figure 13-2 - Location of Non-Designated Heritage Assets.pdfEnvironmental Statement Figure 13 2 Location Of Non Designated Heritage Assets | 22 Apr 2024 | View |
| Figure 13-3 - Location of Cultural Heritage Events.pdfEnvironmental Statement Figure 13 3 Location Of Cultural Heritage Events | 22 Apr 2024 | View |
| Figure 13-4 - Historic Landscape Character.pdfEnvironmental Statement Figure 13 4 Historic Landscape Character | 22 Apr 2024 | View |
| Figure 13-1 - Location of Designated Heritage Assets.pdfEnvironmental Statement Figure 13 1 Location Of Designated Heritage Assets | 22 Apr 2024 | View |
| Figure 14-3 - Traffic Count Locations.pdfEnvironmental Statement Figure 14 3 Traffic Count Locations | 22 Apr 2024 | View |
| Figure 14-4 - Traffic Routes.pdfEnvironmental Statement Figure 14 4 Traffic Routes | 22 Apr 2024 | View |
| Figure 14-1 - Traffic Study Area.pdfEnvironmental Statement Figure 14 1 Traffic Study Area | 22 Apr 2024 | View |
| Figure 14-2 - HGV Routes to and from Site.pdfEnvironmental Statement Figure 14 2 Hgv Routes To And From Site | 22 Apr 2024 | View |
| Figure 15-1 - Air Quality Study Area.pdfEnvironmental Statement Figure 15 1 Air Quality Study Area | 22 Apr 2024 | View |
| Figure 16-1 - Noise Sensitive Receptor and Monitoring Locations.pdfEnvironmental Statement Figure 16 1 Noise Sensitive Receptor And Monitoring Locations | 22 Apr 2024 | View |
| Figure 16-2 - Construction Noise Model Sound Source Layout.pdfEnvironmental Statement Figure 16 2 Construction Noise Model Sound Source Layout | 22 Apr 2024 | View |
| Figure 16-3 - Operational Noise Model Sound Source Layout.pdfEnvironmental Statement Figure 16 3 Operational Noise Model Sound Source Layout | 22 Apr 2024 | View |
| Figure 18-1 - Major Accidents and Disasters Receptors within 5 km of the Proposed Development Site Boundary.pdfEnvironmental Statement Figure 18 1 Major Accidents And Disasters Receptors Within 5 Km Of The Proposed Development Site Boundary | 22 Apr 2024 | View |
| Figure 19-1 - Historic and Authorised Landfills and Waste and Mineral sites.pdfEnvironmental Statement Figure 19 1 Historic And Authorised Landfills And Waste And Mineral Sites | 22 Apr 2024 | View |
| Figure 22-1 - Zones of Influence for Cumulative Effects Assessment (Sheet 4 of 4).pdfEnvironmental Statement Figure 22 1 Zones Of Influence For Cumulative Effects Assessment (sheet 4 Of 4) | 22 Apr 2024 | View |
| Figure 22-2 - Long List of Other Developments (Sheet 1 of 2).pdfEnvironmental Statement Figure 22 2 Long List Of Other Developments (sheet 1 Of 2) | 22 Apr 2024 | View |
| Figure 22-2 - Long List of Other Developments (Sheet 2 of 2).pdfEnvironmental Statement Figure 22 2 Long List Of Other Developments (sheet 2 Of 2) | 22 Apr 2024 | View |
| Figure 22-3 - Short List of Other Developments (Sheet 1 of 2).pdfEnvironmental Statement Figure 22 3 Short List Of Other Developments (sheet 1 Of 2) | 22 Apr 2024 | View |
| Figure 22-3 - Short List of Other Developments (Sheet 2 of 2).pdfEnvironmental Statement Figure 22 3 Short List Of Other Developments (sheet 2 Of 2) | 22 Apr 2024 | View |
| Figure 22-1 - Zones of Influence for Cumulative Effects Assessment (Sheet 1 of 4).pdfEnvironmental Statement Figure 22 1 Zones Of Influence For Cumulative Effects Assessment (sheet 1 Of 4) | 22 Apr 2024 | View |
| Figure 22-1 - Zones of Influence for Cumulative Effects Assessment (Sheet 2 of 4).pdfEnvironmental Statement Figure 22 1 Zones Of Influence For Cumulative Effects Assessment (sheet 2 Of 4) | 22 Apr 2024 | View |
| Figure 22-1 - Zones of Influence for Cumulative Effects Assessment (Sheet 3 of 4).pdfEnvironmental Statement Figure 22 1 Zones Of Influence For Cumulative Effects Assessment (sheet 3 Of 4) | 22 Apr 2024 | View |
| HyGreen ES Volume II APPENDIX 5-A Framework CEMP FINAL (1).pdfEnvironmental Statement Volume Ii Appendix 5 A Framework CEMP Final (1) | 22 Apr 2024 | View |
| HyGreen ES Volume II APPENDIX 10-D Reptiles - FINAL.pdfEnvironmental Statement Volume Ii Appendix 10 D Reptiles Final | 22 Apr 2024 | View |
| HyGreen ES Volume II APPENDIX 10-E Invertebrate Survey Report -FINAL.pdfEnvironmental Statement Volume Ii Appendix 10 E Invertebrate Survey Report Final | 22 Apr 2024 | View |
| HyGreen ES Volume II APPENDIX 10-G FINAL.pdfEnvironmental Statement Volume Ii Appendix 10 G Final | 22 Apr 2024 | View |
| HyGreen ES Volume II APPENDIX 10-C Bats - FINAL.pdfEnvironmental Statement Volume Ii Appendix 10 C Bats Final | 22 Apr 2024 | View |
| HyGreen ES Volume II APPENDIX 13-A DBA_FINAL.pdfEnvironmental Statement Volume Ii Appendix 13 A Dba Final | 22 Apr 2024 | View |
| HyGreen ES Report Chapter 22 CUMULATIVE AND COMBINED EFFECTS_FINAL.pdfEnvironmental Statement Report Chapter 22 Cumulative And Combined Effects Final | 22 Apr 2024 | View |
| Figure 10-4 - Phase 1 Habitats (reduced).pdfEnvironmental Statement Figure 10 4 Phase 1 Habitats (reduced) | 22 Apr 2024 | View |
| Figure 12-6a - Winter Photography_Part4.pdfEnvironmental Statement Figure 12 6a Winter Photography Part4 | 22 Apr 2024 | View |
| Figure 12-6a - Winter Photography_Part5.pdfEnvironmental Statement Figure 12 6a Winter Photography Part5 | 22 Apr 2024 | View |
| Figure 12-6a - Winter Photography_Part6.pdfEnvironmental Statement Figure 12 6a Winter Photography Part6 | 22 Apr 2024 | View |
| Figure 12-6a - Winter Photography_Part7.pdfEnvironmental Statement Figure 12 6a Winter Photography Part7 | 22 Apr 2024 | View |
| Figure 12-6a - Winter Photography_Part1.pdfEnvironmental Statement Figure 12 6a Winter Photography Part1 | 22 Apr 2024 | View |
| Figure 12-6a - Winter Photography_Part2.pdfEnvironmental Statement Figure 12 6a Winter Photography Part2 | 22 Apr 2024 | View |
| Figure 12-6a - Winter Photography_Part3.pdfEnvironmental Statement Figure 12 6a Winter Photography Part3 | 22 Apr 2024 | View |
| Figure 12-6b - Summer Photography_Part3.pdfEnvironmental Statement Figure 12 6b Summer Photography Part3 | 22 Apr 2024 | View |
| Figure 12-6b - Summer Photography_Part4.pdfEnvironmental Statement Figure 12 6b Summer Photography Part4 | 22 Apr 2024 | View |
| Figure 12-6b - Summer Photography_Part5.pdfEnvironmental Statement Figure 12 6b Summer Photography Part5 | 22 Apr 2024 | View |
| Figure 12-6b - Summer Photography_Part6.pdfEnvironmental Statement Figure 12 6b Summer Photography Part6 | 22 Apr 2024 | View |
| Figure 12-6b - Summer Photography_Part7.pdfEnvironmental Statement Figure 12 6b Summer Photography Part7 | 22 Apr 2024 | View |
| Figure 12-6b - Summer Photography_Part1.pdfEnvironmental Statement Figure 12 6b Summer Photography Part1 | 22 Apr 2024 | View |
| Figure 12-6b - Summer Photography_Part2.pdfEnvironmental Statement Figure 12 6b Summer Photography Part2 | 22 Apr 2024 | View |
| HyGreen_Outline Landscape and Biodiversity Management Plan (OLBMP) FINAL.pdfOutline Landscape And Biodiversity Management Plan (olbmp) Final | 22 Apr 2024 | View |
| HyGreen ES Volume II APPENDIX 10-A Phase 1 Report - FINAL - Part 3.pdfEnvironmental Statement Volume Ii Appendix 10 A Phase 1 Report Final Part 3 | 22 Apr 2024 | View |
| HyGreen ES Volume II APPENDIX 10-A Phase 1 Report - FINAL - Part 4.pdfEnvironmental Statement Volume Ii Appendix 10 A Phase 1 Report Final Part 4 | 22 Apr 2024 | View |
| HyGreen ES Volume II APPENDIX 10-F Water-Vole and Otter - FINAL.pdfEnvironmental Statement Volume Ii Appendix 10 F Water Vole And Otter Final | 22 Apr 2024 | View |
| HyGreen ES Volume II APPENDIX 10-A Phase 1 Report - FINAL - Part 1.pdfEnvironmental Statement Volume Ii Appendix 10 A Phase 1 Report Final Part 1 | 22 Apr 2024 | View |
| HyGreen ES Volume II APPENDIX 10-A Phase 1 Report - FINAL - Part 2.pdfEnvironmental Statement Volume Ii Appendix 10 A Phase 1 Report Final Part 2 | 22 Apr 2024 | View |
| Hygreen ES Report Appendix 21-A Climate Change Risk Register_FINAL.pdfEnvironmental Statement Report Appendix 21 A Climate Change Risk Register Final | 22 Apr 2024 | View |
| Hygreen ES Report Appendix 21-B ICCI_FINAL.pdfEnvironmental Statement Report Appendix 21 B In-combination climate change impact assessment Icci Final | 22 Apr 2024 | View |
| HyGreen ES Volume II APPENDIX 10-B GCN - FINAL.pdfEnvironmental Statement Volume Ii Appendix 10 B GCN Survey Report Final | 22 Apr 2024 | View |
| Hygreen ES Appendix 16-B Operational Noise Information -FINAL.pdfEnvironmental Statement Appendix 16 B Operational Noise Information Final | 22 Apr 2024 | View |
| Hygreen ES Appendix 16-C Baseline Sound Monitoring and Survey Information - FINAL.pdfEnvironmental Statement Appendix 16 C Baseline Sound Monitoring And Survey Information Final | 22 Apr 2024 | View |
| Hygreen ES Appendix 16-A Construction Noise Levels and Assumptions - FINAL.pdfEnvironmental Statement Appendix 16 A Construction Noise Levels And Assumptions Final | 22 Apr 2024 | View |
| HyGreen-Statutory Biodiversity Metric Calculation Tool - Option 1.xlsxStatutory Biodiversity Metric Calculation Tool Option 1 | 22 Apr 2024 | View |
| HyGreen-Statutory Biodiversity Metric Calculation Tool - Option 3.xlsxStatutory Biodiversity Metric Calculation Tool Option 3 | 22 Apr 2024 | View |
| HyGreen Hydrogen Project BNG Report_Part1.pdfHydrogen Project Biodiversity Net Gain Report Part 1 | 22 Apr 2024 | View |
| HyGreen Hydrogen Project BNG Report_Part2.pdfHydrogen Project Biodiversity Net Gain Report Part 2 | 22 Apr 2024 | View |
| HyGreen Hydrogen Project BNG Report_Part3.pdfHydrogen Project Biodiversity Net Gain Report Part 3 | 22 Apr 2024 | View |
| HyGreen Hydrogen Project BNG Report_Part4.pdfHydrogen Project Biodiversity Net Gain Report Part 4 | 22 Apr 2024 | View |
| HyGreen Energy Reduction Statement.pdfEnergy Reduction Statement | 22 Apr 2024 | View |
| HyGreen Arboricultural Impact Assessment_FINAL_Part 2.pdfArboricultural Impact Assessment Final Part 2 | 22 Apr 2024 | View |
| HyGreen Arboricultural Impact Assessment_FINAL_Part 3.pdfArboricultural Impact Assessment Final Part 3 | 22 Apr 2024 | View |
| HyGreen Arboricultural Impact Assessment_FINAL_Part 1.pdfArboricultural Impact Assessment Final Part 1 | 22 Apr 2024 | View |
| HyGreen ES NTS FINAL_Optimized.pdfEnvironmental Statement Non technical summary Final Optimized | 22 Apr 2024 | View |
| HyGreen ES Volume II APPENDIX 12-B Landscape Character FINAL.pdfEnvironmental Statement Volume Ii Appendix 12 B Landscape Character Final | 22 Apr 2024 | View |
| HyGreen ES Volume II APPENDIX 12-C Potential Viewpoints FINAL.pdfEnvironmental Statement Volume Ii Appendix 12 C Potential Viewpoints Final | 22 Apr 2024 | View |
| HyGreen ES Volume II APPENDIX 12-A Landscape and Visual Methodology FINAL.pdfEnvironmental Statement Volume Ii Appendix 12 A Landscape And Visual Methodology Final | 22 Apr 2024 | View |
| HyGreen ES Appendix 2-A Scoping Opinion Responses FINAL.pdfEnvironmental Statement Appendix 2 A Scoping Opinion Responses Final | 22 Apr 2024 | View |
| HyGreen ES Volume II APPENDIX 15-A Air Quality FINAL.pdfEnvironmental Statement Volume Ii Appendix 15 A Air Quality Final | 22 Apr 2024 | View |
| HyGreen ES Volume II APPENDIX 9-A HYGREEN PHASE 1 GEOENVIRONMENTAL DESK STUDY_FINAL.pdfEnvironmental Statement Volume Ii Appendix 9 A Hygreen Phase 1 Geoenvironmental Desk Study Final | 22 Apr 2024 | View |
| Figure 4-4 - Hydrogen Production Process Schematic.pdfEnvironmental Statement Figure 4 4 Hydrogen Production Process Schematic | 22 Apr 2024 | View |
| HyGreen Statement of Community Involvement.pdfStatement Of Community Involvement | 22 Apr 2024 | View |
| Hygreen - Report to inform HRA FINAL_Optimized - 1 of 2.pdfReport To Inform Habitats Regulations Assessement Final Optimized 1 Of 2 | 22 Apr 2024 | View |
| Hygreen - Report to inform HRA FINAL_Optimized - 2 of 2.pdfReport To Inform Habitats Regulations Assessement Final Optimized 2 Of 2 | 22 Apr 2024 | View |
| HyGreen ES Volume II Appendices Cover Glossary and TOC.pdfEnvironmental Statement Report Volume Ii Appendices Cover Glossary And Toc | 22 Apr 2024 | View |
| HyGreen ES Volume III Figures Cover and TOC.pdfEnvironmental Statement Report Volume Iii Figures Cover And Toc | 22 Apr 2024 | View |
| HyGreen ES Volume I Cover Glossary and TOC.pdfEnvironmental Statement Report Volume I Cover Glossary And Toc | 22 Apr 2024 | View |
| HyGreen Design Access and Planning Statement.pdfDesign Access And Planning Statement | 22 Apr 2024 | View |
| HyGreen ES Volume II APPENDIX 1-A EIA Scoping Report PART 3.pdfEnvironmental Statement Volume Ii Appendix 1 A EIA Scoping Report Part 3 | 22 Apr 2024 | View |
| HyGreen ES Volume II APPENDIX 1-B RCBC EIA Scoping Opinion.pdfEnvironmental Statement Volume Ii Appendix 1 B RCBC EIA Scoping Opinion | 22 Apr 2024 | View |
| HyGreen ES Volume II APPENDIX 1-C Statement of Competence.pdfEnvironmental Statement Volume Ii Appendix 1 C Statement Of Competence | 22 Apr 2024 | View |
| HyGreen ES Volume II APPENDIX 1-A EIA Scoping Report PART 1.pdfEnvironmental Statement Volume Ii Appendix 1 A EIA Scoping Report Part 1 | 22 Apr 2024 | View |
| HyGreen ES Volume II APPENDIX 1-A EIA Scoping Report PART 2.pdfEnvironmental Statement Volume Ii Appendix 1 A EIA Scoping Report Part 2 | 22 Apr 2024 | View |
| HyGreen ES Appendix 2-A Scoping Opinion Responses.pdfEnvironmental Statement Appendix 2 A Scoping Opinion Responses | 22 Apr 2024 | View |
| HyGreen ES Volume II APPENDIX 8-B WFD Screening and Scoping Assessment.pdfEnvironmental Statement Volume Ii Appendix 8 B Water Framework Directive Assessment | 22 Apr 2024 | View |
| HyGreen ES Volume II APPENDIX 8-C Nutrient Neutrality Screening.pdfEnvironmental Statement Volume Ii Appendix 8 C Nutrient Neutrality Screening | 22 Apr 2024 | View |
| HyGreen ES Volume II APPENDIX 8-D Drainage Strategy Technical Note.pdfEnvironmental Statement Volume Ii Appendix 8 D Drainage Strategy Technical Note | 22 Apr 2024 | View |
| HyGreen ES Volume II APPENDIX 8-A Flood Risk Assessment.pdfEnvironmental Statement Volume Ii Appendix 8 A Flood Risk Assessment | 22 Apr 2024 | View |
| ANNEX B Envirocheck 285342089 Landmark 2021 - Part 3.pdfEnvironmental Statement Annex B Envirocheck 285342089 Landmark 2021 Part 3 | 22 Apr 2024 | View |
| ANNEX B GSIP-2022-13154-11993_smallScale Groundsure 2022c - Part 2.pdfEnvironmental Statement Annex B Gsip 2022 13154 11993 Smallscale Groundsure 2022c Part 2 | 22 Apr 2024 | View |
| ANNEX B GSIP-2022-13154-11993_smallScale Groundsure 2022c - Part 3.pdfEnvironmental Statement Annex B Gsip 2022 13154 11993 Smallscale Groundsure 2022c Part 3 | 22 Apr 2024 | View |
| ANNEX B GSIP-2022-13154-11993_smallScale Groundsure 2022c - Part 4.pdfEnvironmental Statement Annex B Gsip 2022 13154 11993 Smallscale Groundsure 2022c Part 4 | 22 Apr 2024 | View |
| ANNEX B GSIP-2023-13293-12624_E_1 Groundsure 2023.pdfEnvironmental Statement Annex B Gsip 2023 13293 12624 E 1 Groundsure 2023 | 22 Apr 2024 | View |
| ANNEX B 60559231_CTR05-002_EC_Index Landmark 2020.pdfEnvironmental Statement Annex B 60559231 Ctr05 002 Ec Index Landmark 2020 | 22 Apr 2024 | View |
| HyGreen ES Volume II APPENDIX 9-A HYGREEN PHASE 1 GEOENVIRONMENTAL DESK STUDY.pdfEnvironmental Statement Volume Ii Appendix 9 A Hygreen Phase 1 Geoenvironmental Desk Study | 22 Apr 2024 | View |
| ANNEX B GSIP-2022-13154-11993_smallScale Groundsure 2022c - Part 1.pdfEnvironmental Statement Annex B Gsip 2022 13154 11993 Smallscale Groundsure 2022c Part 1 | 22 Apr 2024 | View |
| ANNEX B GS-9167786_smallScale Groundsure 2022b and 2022d.pdfEnvironmental Statement Annex B Gs 9167786 Smallscale Groundsure 2022b And 2022d | 22 Apr 2024 | View |
| ANNEX B GS-9167761_smallScale Groundsure 2022a.pdfEnvironmental Statement Annex B Gs 9167761 Smallscale Groundsure 2022a | 22 Apr 2024 | View |
| ANNEX B Envirocheck 285342089 Landmark 2021 Part 1.pdfEnvironmental Statement Annex B Envirocheck 285342089 Landmark 2021 Part 1 | 22 Apr 2024 | View |
| ANNEX B Envirocheck 285342089 Landmark 2021 - Part 2.pdfEnvironmental Statement Annex B Envirocheck 285342089 Landmark 2021 Part 2 | 22 Apr 2024 | View |
| Figure 11-2_Wetland Bird Count Sectors.pdfEnvironmental Statement Figure 11 2 Wetland Bird Count Sectors | 22 Apr 2024 | View |
| Figure 11-3_Hygreen breeding bird survey areas.pdfEnvironmental Statement Figure 11 3 Hygreen Breeding Bird Survey Areas | 22 Apr 2024 | View |
| Figure 11-1_Study Areas.pdfEnvironmental Statement Figure 11 1 Study Areas | 22 Apr 2024 | View |
| Figure 11-4_NZT Breeding Bird Survey Areas.pdfEnvironmental Statement Figure 11 4 Net zero Teesside Breeding Bird Survey Areas | 22 Apr 2024 | View |
| Figure 11-5_Statutory Designated Sites.pdfEnvironmental Statement Figure 11 5 Statutory Designated Sites | 22 Apr 2024 | View |
| Figure 11-6_Non-statutory Designated Sites.pdfEnvironmental Statement Figure 11 6 Non Statutory Designated Sites | 22 Apr 2024 | View |
| Appendix 14-B CTMP.pdfEnvironmental Statement Appendix 14 B Construction Worker Travel Plan | 22 Apr 2024 | View |
| Appendix 14-C CWTP.pdfEnvironmental Statement Appendix 14 C Construction Worker Travel Plan | 22 Apr 2024 | View |
| Appendix 14-A Transport Assessment.pdfEnvironmental Statement Appendix 14 A Transport Assessment | 22 Apr 2024 | View |
| HyGreen ES Volume II APPENDIX 15-A Air Quality.pdfEnvironmental Statement Volume Ii Appendix 15 A Air Quality | 22 Apr 2024 | View |
| Hygreen ES Volume II Appendix 18-B Hazardous Substances Consent Flowchart.pdfEnvironmental Statement Volume Ii Appendix 18 B Hazardous Substances Consent Flowchart | 22 Apr 2024 | View |
| Hygreen ES Volume II Appendix 18-C COMAH Flowchart.pdfEnvironmental Statement Volume Ii Appendix 18 C Comah Flowchart | 22 Apr 2024 | View |
| HyGreen ES Volume II APPENDIX 18-A Major Accidents and Disasters.pdfEnvironmental Statement Volume Ii Appendix 18 A Major Accidents And Disasters | 22 Apr 2024 | View |
| HyGreen ES Volume II APPENDIX 22C_Shortlist.pdfEnvironmental Statement Volume Ii Appendix 22c Shortlist | 22 Apr 2024 | View |
| HyGreen ES Volume II APPENDIX 22-D_ASSESSMENT OF CUMULATIVE EFFECTS.pdfEnvironmental Statement Volume Ii Appendix 22 D Assessment Of Cumulative Effects | 22 Apr 2024 | View |
| HyGreen ES Volume II APPENDIX 22A_Long list.pdfEnvironmental Statement Volume Ii Appendix 22a Long List | 22 Apr 2024 | View |
| HyGreen ES Volume II APPENDIX 22B_ Cumulative Assessment Stages 1-3.pdfEnvironmental Statement Volume Ii Appendix 22b Cumulative Assessment Stages 1 3 | 22 Apr 2024 | View |
| HyGreen - 415000-00414 -PL-DAG-00004-001 Pipeline Network and Routing 20 sheets _Part1.pdfPipeline Network And Routing 20 Sheets Part1 | 22 Apr 2024 | View |
| HyGreen - 415000-00414 -PL-DAG-00004-001 Pipeline Network and Routing 20 sheets _Part2.pdfPipeline Network And Routing 20 Sheets Part2 | 22 Apr 2024 | View |
| HyGreen - 415000-00414 -PL-DAG-00004-001 Pipeline Network and Routing 20 sheets _Part3.pdfPipeline Network And Routing 20 Sheets Part3 | 22 Apr 2024 | View |
| HyGreen ES APPENDIX 11-A baseline appendix_Ornithology REDACTED_Optimized (2).pdfEnvironmental Statement Report - Appendix 11A Ornithology Redacted Amended 3.05.2024 | 3 May 2024 | View |
| HyGreen_Additional Ecology Information_Memo_Final for Issue.pdfAdditional Ecology Information Memo Final For Issue | 14 Oct 2024 | View |
| Supporting Information in response to Natural England consultation.pdfSupporting Information In Response To Natural England Consultation | 17 Feb 2025 | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Related records could not be loaded.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.