Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
LAND OFF NIGHTINGALE ROAD GALLEY HILL GUISBOROUGH
Last published check: 21 Oct 2026, 06:12. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
DISCHARGE OF CONDITION 6 (GROUND LEVELS), 7 (MATERIALS EXTERNAL), 8 (MATERIALS HARD SURFACE), 9 (FOUL AND SURFACE WATER), 10 (PEDESTRIAN LINK), 13 (EARTHWORK BOUNDARY), AND 16 (CONSTRUCTION METHOD STATEMENT) OF OUTLINE PLANNING PERMISSION R/2018/0621/OOM FOR ERECTION OF UP TO 60 RESIDENTIAL DWELLING...
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsLAND OFF NIGHTINGALE ROAD GALLEY HILL GUISBOROUGH
This record has no verified map location.
| Document | Published | Action |
|---|---|---|
| ApplicationFormRedacted.pdfApplication Form | 12 Dec 2023 | View |
| Ward Councillor.pdfConsultee response - Ward Councillor | 20 Dec 2023 | View |
| Planning Nuisance.pdfConsultee response - Environmental Protection (Nuisance) | 2 Jan 2024 | View |
| NEAR 858.pdfConsultee response - Archaeological Consultant | 16 Jan 2024 | View |
| Consultee Response - LLFA.pdfConsultee response - Engineers (Local Lead Flood Written | 8 Mar 2024 | View |
| Northumbrian Water.pdfConsultee response - Northumbrian Water | 21 Mar 2024 | View |
| Highways(1).pdfConsultee response - Engineering Team (Highways) | 18 Apr 2024 | View |
| Decision Notice.pdfDecision Notice | 18 Apr 2024 | View |
| Officer Report.pdfOfficer Report | 18 Apr 2024 | View |
| Galley Hill, Guisborough Watching Brief Specification September 2023 collated.pdfCondition 13 - Written Scheme of Investigation - Watching Brief Specification | 12 Dec 2023 | View |
| GUI-CMP-001B - Construction Management Plan - Guisborough.pdfCondition 16 - Construction Management Plan Amended | 5 Mar 2024 | View |
| GUI CMP 001 Construction Management Plan Guisborough 67.pdfCondition 16 - Construction Method Statement SUPERSED | 12 Dec 2023 | View |
| PA GG 03 B MATERIALS PLAN 110823.pdfCondition 7 - Materials Plan | 12 Dec 2023 | View |
| 22 047 260 Adoptable Highway Details Rev P2.pdfCondition 8 - Adoptable Highway Details SUPERSEDED | 12 Dec 2023 | View |
| 22 047 153 SuDS Basin Details Rev P3.pdfCondition 9 - Suds Basin Details SUPERSEDED | 12 Dec 2023 | View |
| 22 047 200 Engineering Layout Sheet 1 Rev P4.pdfCondition 9 - Engineering Layout Sheet 1 SUPERSEDED | 12 Dec 2023 | View |
| 22 047 201 Engineering Layout Sheet 2 Rev P6.pdfCondition 9 - Engineering Layout Sheet 2 SUPERSEDED | 12 Dec 2023 | View |
| 22 047 250 Adoptable Highway and Sewer Longsections Sheet 1 Rev P2.pdfCondition 9 - Adoptable Highway And Sewer Longsections Sheet 1 Rev P2 | 12 Dec 2023 | View |
| 22 047 251 Adoptable Highway and Sewer Longsections Sheet 2 Rev P4.pdfCondition 9 - Adoptable Highway And Sewer Longsections Sheet 2 Rev P4 SUPERSDED | 12 Dec 2023 | View |
| 22 047 100 Section 38 Agreement Plan Rev P5.pdfCondition 8 and 10 - Section 38 Agreement Plan SUPERSEDED | 12 Dec 2023 | View |
| 22 047 915 Off Site Footpath Link Details Rev P1.pdfCondition 8 and 10 - Off Site Footpath Link Details SUPERSEDED | 12 Dec 2023 | View |
| 22 047 272 P1 Plotworks FFL-Eaves-Ridge Levels 48 62.pdfCondition 6 - Plotworks Finished Floor Levels / Eaves Ridge Levels SUPERSEDED | 12 Dec 2023 | View |
| 22 047 270 External Levels Sheet 1 (Rev P4).pdfCondition 6 - External Levels Sheet 1 (rev P4) SUPERSEDED | 12 Dec 2023 | View |
| 22 047 271 External Levels Sheet 2 (Rev P4).pdfCondition 6 - External Levels Sheet 2 (rev P4) SUPERSEDED | 12 Dec 2023 | View |
| GUI-CMP-001A - Construction Management Plan - Guisborough[27].pdfCondition 16 - Construction Method Statement Amended 14.12.23 | 14 Dec 2023 | View |
| Galley Hill, Guisborough Watching Brief Specification September 2023 collated(1).pdfCondition 13 - Written Scheme of Investigation - Watching Brief Specification September 2023 SUPERSEDED | 2 Feb 2024 | View |
| PA-GG-03-D - MATERIALS PLAN - 230224.pdfCondition 7 - Materials Plan | 5 Mar 2024 | View |
| 22-047 201 Engineering Layout Sheet 2 (Rev P7).pdfCondition 9 - Engineering Layout Sheet 2 (rev P7) SUPERSEDED | 5 Mar 2024 | View |
| 22-047 200 Engineering Layout Sheet 1 (Rev P5).pdfCondition 9 - Engineering Layout Sheet 1 (rev P5) SUPERSEDED | 5 Mar 2024 | View |
| 22-047 153 SuDS Basin Details (Rev P4).pdfCondition 9 - Suds Basin Details (rev P4) SUPERSEDED | 5 Mar 2024 | View |
| 22-047 100-P6 Section 38.pdfCondition 8 & 10 - Section 38 AMENDED | 5 Mar 2024 | View |
| 22-047 915 Off-Site Footpath Link Details (Rev P2).pdfCondition 8 & 10 - Off Site Footpath Link Details (rev P2) | 5 Mar 2024 | View |
| 22-047 260 Adoptable Highway Details (Rev P2).pdfCondition 8 - Adoptable Highway Details (rev P2) SUPERSEDED | 5 Mar 2024 | View |
| 22-047 251 Adoptable Highway & Sewer Longsections Sheet 2 (Rev P5).pdfCondition 9 - Adoptable Highway & Sewer Longsections Sheet 2 (rev P5) SUPERSEDED | 5 Mar 2024 | View |
| 22-047 270-P6 External Levels - SHEET 1.pdfCondition 6 - External Levels Sheet 1 (rev P6) Amended | 7 Mar 2024 | View |
| 22-047 260 Adoptable Highway Details (Rev P2)(1).pdfCondition 8 - Adoptable Highway Details (rev P2)(1) Amended | 7 Mar 2024 | View |
| 22-047 272-P2 Plotworks FFL-Eaves-Ridge Levels[82].pdfCondition 6 - Plotworks FFL/ Eaves/Ridge Levels[Rev P2] AMENDED | 7 Mar 2024 | View |
| 22-047 271-P6 External Levels - SHEET 2.pdfCondition 6 - External Levels Sheet 2 (rev P6) Amended | 7 Mar 2024 | View |
| 22-047 251 Adoptable Highway & Sewer Longsections Sheet 2 (Rev P5)(1).pdfCondition 9 - Adoptable Highway & Sewer Longsections Sheet 2 (rev P5)(1) | 7 Mar 2024 | View |
| 22-047 201-P9 Engineering Layout - SHEET 2.pdfCondition 9 - P9 Engineering Layout Sheet 2 Amended | 7 Mar 2024 | View |
| 22-047 200-P7 Engineering Layout - SHEET 1.pdfCondition 9 - Engineering Layout Sheet 1 Amended | 7 Mar 2024 | View |
| 22-047 211-P8 Surfacing and Kerbs Layout - SHEET 2.pdfCondition 9 - Surfacing And Kerbs Layout Sheet 2 | 7 Mar 2024 | View |
| 22-047 210-P7 Surfacing and Kerbs Layout - SHEET 1.pdfCondition 9 - Surfacing And Kerbs Layout Sheet 1 | 7 Mar 2024 | View |
| 22-047 153 SuDS Basin Details (Rev P5).pdfCondition 9 - Suds Basin Details (rev P5) Amended | 7 Mar 2024 | View |
| 22-047 153 SuDS Basin Details (Rev P4)[46].pdfCondition 9 - Suds Basin Details (rev P4)[46] Amended | 7 Mar 2024 | View |
| Galley Hill Guisborough Watching Brief Specification collated revised[13].pdfCondition 13 - Written Scheme of Investigation - Watching Brief Specification Collated Revised[13] Amended | 7 Mar 2024 | View |
| 22-047 280-P3 Overland flows pre and post development.pdfCondition 9 - Overland Flows Pre And Post Development | 7 Mar 2024 | View |
| GUI-CMP-001 C- Construction Management Plan - Guisborough[84].pdfCondition 16 - Construction Management Plan Amended | 18 Apr 2024 | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Related records could not be loaded.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.