Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
LAND ALONG THE DOGGER BANK C OFFSHORE WIND FARM CABLE CORRIDOR BETWEEN LANDFALL NEAR MARSKE BY THE SEA AND LACKENBY NATIONAL GRID SUBSTATION
Last published check: 22 Oct 2026, 20:02. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
SUBMISSION OF DETAILS FOR REQUIREMENT 25 (SURFACE AND FOUL WATER DRAINAGE) IN RELATION TO STAGE 3 FOR TWO OFFSHORE WIND TURBINE GENERATING STATIONS AND ASSOCIATED INFRASTRUCTURE IN THE DOGGER BANK ZONE AND THE BOROUGH OF REDCAR AND CLEVELAND. THE FULL DESCRIPTION OF THE AUTHORISED DEVELOPMENT IS SPE...
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsLAND ALONG THE DOGGER BANK C OFFSHORE WIND FARM CABLE CORRIDOR BETWEEN LANDFALL NEAR MARSKE BY THE SEA AND LACKENBY NATIONAL GRID SUBSTATION
This record has no verified map location.
| Document | Published | Action |
|---|---|---|
| ApplicationFormRedacted.pdfApplication Form | 27 Mar 2023 | View |
| EA_R20230235CD_OFFICIAL_120323.pdfConsultee response - Environment Agency | 12 Apr 2023 | View |
| LLFA.pdfConsultee response - Engineers (Local Lead Flood Authority) | 27 Apr 2023 | View |
| Compliance Decision Notice 0235.pdfCompliance Decision Notice | 4 May 2023 | View |
| Compliance Officer Report 0235.pdfCompliance Officer Report | 4 May 2023 | View |
| DBC OWF LF700013-CST-DOG-REP-0105 Drainage DCO Stage 3.pdfRequirement 25 - Drainage DCO Stage 3 | 27 Mar 2023 | View |
| DBC OWF LF700013-CST-DOG-REP-0105 Drainage Scheme Stage 3 Appendix 2.1.pdfRequirement 25 - Drainage Scheme Stage 3 Appendix 2.1 | 27 Mar 2023 | View |
| DBC OWF LF700013-CST-DOG-REP-0105 Drainage Scheme Stage 3 Appendix 2.2.pdfRequirement 25 - Drainage Scheme Stage 3 Appendix 2.2 | 27 Mar 2023 | View |
| DBC OWF LF700013-CST-DOG-LET-0265 Cover Letter R25 Drainage Stage 3.pdfRequirement 25 - Covering Letter R25 Drainage Stage 3 | 27 Mar 2023 | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Related records could not be loaded.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.