Council planning record

SUBMISSION OF DETAILS FOR REQUIREMENT 23 (FENCING AND OTHER MEANS OF ENCLOSURE FOR ONSHORE WORKS) FOR STAGE 3 OF TWO OFFSHORE WIND TURBINE GENERATING STATIONS AND ASSOCIATED INFRASTRUCTURE IN THE DOGGER BANK ZONE AND THE BOROUGH OF REDCAR AND CLEVELAND. THE FULL DESCRIPTION OF THE AUTHORISED DEVELOP...

LAND ALONG THE DOGGER BANK C OFFSHORE WIND FARM CORRIDOR BETWEEN LANDFALL NEAR MARSKE BY THE SEA AND LACKENBY NATIONAL GRID SUBSTATION

ApprovedReference: R/2023/0230/CDRedcar and Cleveland Borough Council

Last published check: 22 Oct 2026, 20:03. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Decision Date

    Published milestoneCouncil source

Application summary

Status
Approved
Application type
Condition Discharge
Received
27 Mar 2023
Validated
27 Mar 2023
Determination deadline
Not published
Local authority
Redcar and Cleveland Borough Council

Application overview

SUBMISSION OF DETAILS FOR REQUIREMENT 23 (FENCING AND OTHER MEANS OF ENCLOSURE FOR ONSHORE WORKS) FOR STAGE 3 OF TWO OFFSHORE WIND TURBINE GENERATING STATIONS AND ASSOCIATED INFRASTRUCTURE IN THE DOGGER BANK ZONE AND THE BOROUGH OF REDCAR AND CLEVELAND. THE FULL DESCRIPTION OF THE AUTHORISED DEVELOP...

Proposal details

Reference
R/2023/0230/CD
Agent
Royal HaskoningDHV

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

LAND ALONG THE DOGGER BANK C OFFSHORE WIND FARM CORRIDOR BETWEEN LANDFALL NEAR MARSKE BY THE SEA AND LACKENBY NATIONAL GRID SUBSTATION

This record has no verified map location.

Documents 9 of 9

DocumentPublishedAction
ApplicationFormRedacted.pdfApplication Form27 Mar 2023View
Consultee Response - Highways.pdfConsultee response - Engineering Team (Highways)3 Apr 2023View
Decision Notice.pdfDecision Notice18 Apr 2023View
Officer report.pdfOfficer Report18 Apr 2023View
LF700013-CST-DOG-REP-0104 Fencing Proposals DCO Stage 3 DBC OWF.pdfRequirement 23 - Fencing Proposals DCO Stage 327 Mar 2023View
LF700013-CST-DOG-REP-0104 Fencing Proposals DCO Stage 3 DBC OWF Appendix A.1.pdfRequirement 23 - Fencing Proposals DCO Stage 3 Appendix A.127 Mar 2023View
LF700013-CST-DOG-REP-0104 Fencing Proposals DCO Stage 3 DBC OWF Appendix A.2.pdfRequirement 23 - Fencing Proposals Dco Stage 3 Appendix A.227 Mar 2023View
LF700013-CST-DOG-REP-0104 Fencing Proposals DCO Stage 3 DBC OWF Appendix B.pdfRequirement 23 - Fencing Proposals Dco Stage 3 Appendix B27 Mar 2023View
LF700013-CST-DOG-LET-0262 Cover Letter R23 Fencing Stage 3 DBC OWF.pdfCovering Letter R23 - Fencing Stage 327 Mar 2023View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

CONDITION DISCHARGE GRANTED
Decision Notice.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.