Council planning record

DEVELOPMENT OF NEW PRIMARY HEALTH CARE CENTRE INCLUDING PHARMACY & ASSOCIATED CAR PARKING

LAND EAST OF COMMUNITY FIRE STATION JUNCTION OF CHURCH LANE AND SOUTH LOOP ROAD ESTON

ApprovedReference: R/2023/0143/FFMRedcar and Cleveland Borough Council

Last published check: 21 Sept 2026, 13:04. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Start

    Published milestoneCouncil source
  4. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Date

    Published milestoneCouncil source

Application summary

Status
Approved
Application type
Major Application
Received
21 Feb 2023
Validated
2 Mar 2023
Determination deadline
Not published
Local authority
Redcar and Cleveland Borough Council

Application overview

DEVELOPMENT OF NEW PRIMARY HEALTH CARE CENTRE INCLUDING PHARMACY & ASSOCIATED CAR PARKING

Proposal details

Reference
R/2023/0143/FFM
Agent
P+HS Architects

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

LAND EAST OF COMMUNITY FIRE STATION JUNCTION OF CHURCH LANE AND SOUTH LOOP ROAD ESTON

This record has no verified map location.

Documents 54 of 54

DocumentPublishedAction
ApplicationForm - Amended(1).pdfApplication Form28 Feb 2023View
NHS CCG.pdfConsultee response - NHS Clinical Commissioning Group8 Mar 2023View
0143 fIRE.pdfConsultee response - Fire Brigade9 Mar 2023View
ARBORIST.pdfConsultee response - Arborist Officer10 Mar 2023View
PN 1043.pdfConsultee response - Environmental Protection (Nuisance)20 Mar 2023View
Planning Strategy.pdfConsultee response - Strategic Planning (Policy)22 Mar 2023View
LLFA.pdfConsultee response - Engineers (Local Lead Flood Authority)23 Mar 2023View
Consultee Response Police ALO.pdfConsultee response - Cleveland Police28 Mar 2023View
Consultee Response - Greener Future Climate Change.pdfConsultee Response - Greener Future Climate Change28 Mar 2023View
CTW00267 Cont Land.pdfConsultee response - Environmental Protection (Contaminated Land)28 Mar 2023View
R-2023-0143-FFM Application Response.pdfConsultee response - Northumbrian Water31 Mar 2023View
Consultee Response - NEAR 0143.pdfConsultee response - North East Archaeological Research Ltd31 Mar 2023View
0143 LLFA.pdfConsultee response - Engineers (Local Lead Flood Authority)5 Apr 2023View
DEVELOPMENT ENGINEER.pdfConsultee response - Engineering Team (Highways)19 May 2023View
0143 Decision.pdfDecision Notice10 Oct 2023View
SGMC-PHS-XX-ZZ-DR-A-9001 Site Location Plan.pdfSite Location Plan21 Feb 2023View
0143 Officer Report.pdfOfficer Report10 Oct 2023View
CUNNINGHAM T.pdfNeighbour Comments - Cunningham T10 Mar 2023View
EARREY R.pdfNeighbour Comments - Earrey R10 Mar 2023View
TAYLOR J.pdfNeighbour Comments - Taylor J10 Mar 2023View
Neighbour Comments - White J.pdfNeighbour Comments - White J13 Mar 2023View
226157-BGP-01-ZZ-D-C-01130_P01 Proposed Drainage GA.pdfProposed Drainage21 Feb 2023View
226157-BGP-01-ZZ-D-C-01900_P01 Proposed Impermeable Areas Plan.pdfProposed Impermeable Areas Plan21 Feb 2023View
L2301_JCP_ZZ_DR_E_(65)_01 A0 Proposed Fire Detection and Alarm System P1.pdfProposed Fire Detection And Alarm System21 Feb 2023View
L2301_JCP_RF_DR_M_(50)_01 Roof Level Plant Space Layout.pdfRoof Level Plant Space Layout21 Feb 2023View
L2301_JCP_01_DR_M_(57)_01 Indicative Ventilation Layout First Floor.pdfIndicative Ventilation Layout First Floor21 Feb 2023View
L2301_JCP_02_DR_M_(57)_01 Indicative Ventilation Layout Second Floor.pdfIndicative Ventilation Layout Second Floor21 Feb 2023View
L2301_JCP_GF_DR_M_(57)_01 Indicative Ventilation Layout Ground Floor.pdfIndicative Ventilation Layout Ground Floor21 Feb 2023View
L2301_JCP_00_DR_E_(62)_01 A1 Proposed Electric Vehicle Charge Points P1.pdfProposed Electric Vehicle Charge Points21 Feb 2023View
L2301_JCP_00_DR_E_(63)_01 A1 Proposed External Lighting P2.pdfProposed External Lighting21 Feb 2023View
SGMC-PHS-XX-00-DR-A-2000 Ground Floor General Arrangement Plan.pdfGround Floor General Arrangement Plan21 Feb 2023View
SGMC-PHS-XX-01-DR-A-2001 First Floor General Arrangement Plan.pdfFirst Floor General Arrangement Plan21 Feb 2023View
SGMC-PHS-XX-02-DR-A-2002 Second Floor General Arrangement Plan.pdfSecond Floor General Arrangement Plan21 Feb 2023View
SGMC-PHS-XX-RL-DR-A-2700 Roof Level General Arrangement Plan.pdfRoof Level General Arrangement Plan21 Feb 2023View
SGMC-PHS-XX-XX-DR-A-1500 Proposed Elevations Sheet 1 of 2.pdfProposed Elevations Sheet 1 Of 221 Feb 2023View
SGMC-PHS-XX-XX-DR-A-1501 Proposed Elevations Sheet 2 of 2.pdfProposed Elevations Sheet 2 Of 221 Feb 2023View
SGMC-PHS-XX-XX-DR-A-2200 Proposed Site Sections.pdfProposed Site Sections21 Feb 2023View
SGMC-PHS-XX-ZZ-DR-A-9002 Proposed Site Layout.pdfProposed Site Layout21 Feb 2023View
SGMC-PHS-XX-ZZ-DR-A-9003 Existing Site Layout.pdfExisting Site Layout21 Feb 2023View
SGMC-PHS-XX-ZZ-DR-A-9005 Proposed Boundary Treatment Plan.pdfProposed Boundary Treatment Plan21 Feb 2023View
SGMC-PHS-XX-ZZ-DR-A-9006 Proposed Landscaping Strategy Plan.pdfProposed Landscaping Strategy Plan21 Feb 2023View
SGMC-PHS-XX-ZZ-DR-A-9008 Proposed Bin Store Plans and Elevations.pdfProposed Bin Store Plans And Elevations21 Feb 2023View
226157 SGMC - BGP FRA Opto.pdfFlood Risk Assessment21 Feb 2023View
226157 SGMC - BGP Drainage Philosophy Opto.pdfDrainage Philosophy21 Feb 2023View
L2301_JCP_XX_RP_M_59_01_Thermal Comfort Report.pdfThermal Comfort Analysis21 Feb 2023View
L2301_JCP_XX_RP_M_59_03_Sustainability Statement.pdfSustainability Statement21 Feb 2023View
JN2533-Rep-0002.2 ALL Transport Assessment (Planning).pdfTransport Assessment21 Feb 2023View
JN2533-Rep-0003.2 ALL Interim Travel Plan (Planning).pdfInterim Travel Plan21 Feb 2023View
10154.1B Apex acoustics South Grange Medical Centre Stage 2 acoustic report.pdfStage 2 Acoustic Report21 Feb 2023View
P and HS South Grange Medical Centre Arboricultural Constraints Survey R1 Final.pdfArboricultural Constraints Survey21 Feb 2023View
South Grange- PEA KR Checked ST Checked 151222.pdfPreliminary Ecological Survey21 Feb 2023View
SGMC-PHS-XX-XX-DA-A-001 Design and Access Statement.pdfPlanning, Design And Access Statement and Pre-Application Consultation21 Feb 2023View
Desk Study Report - South Grange Medical Centre - Middlesbrough-compressed.pdfPhase 1 Desk Study24 Feb 2023View
S221017 Phase 2 Site Investigation - South Grange Medical Centre, Middlesbrough.pdfPhase 2 Site Investigation24 Feb 2023View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

GRANT PLANNING PERMISSION
0143 Decision.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.