Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
REDCAR CENTRAL RAILWAY STATION STATION ROAD REDCAR TS10 1RD
Last published check: 22 Oct 2026, 11:53. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourcePROPOSED REDEVELOPMENT OF RAILWAY STATION TO INCLUDE REPAIRS, REFURBISHMENT AND INTERNAL AND EXTERNAL ALTERATIONS; CREATION OF 10 COMMERCIAL/RETAIL UNITS (CLASS E) AT GROUND FLOOR WITH ASSOCIATED ANCILLARY ROOMS; W/CS AND REST ROOM FACILITIES; STORAGE UNITS AT FIRST FLOOR; SOLAR PANEL ARRAY TO ROOF;...
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsREDCAR CENTRAL RAILWAY STATION STATION ROAD REDCAR TS10 1RD
This record has no verified map location.
| Document | Published | Action |
|---|---|---|
| ApplicationFormRedacted.pdfApplication Form | 2 Sept 2022 | View |
| EP NU.pdfConsultee response - Environmental Protection (Nuisance) | 8 Sept 2022 | View |
| Cleveland Police 0717.pdfConsultee response - Cleveland Police | 26 Sept 2022 | View |
| Consultee Response - Conservation.pdfConsultee response - Strategic Planning (Conservation) | 28 Sept 2022 | View |
| CTW00196 Cont Land.pdfConsultee response - Environmental Protection (Contaminated Land) | 28 Sept 2022 | View |
| Consultee Response - Network Rail.pdfConsultee Response - Network Rail | 4 Oct 2022 | View |
| DECISION NOTICE.pdfDecision Notice | 9 Dec 2022 | View |
| 20055-HL-00-XX-DR-A-1000-S4-P02.pdfLocation Plan | 2 Sept 2022 | View |
| 20055-HL-00-XX-DR-A-1001-S4-P03.pdfExisting Site Plan | 2 Sept 2022 | View |
| 20055-HL-00-XX-DR-A-1600-S4-P04.pdfProposed Site Plan | 2 Sept 2022 | View |
| 20055-HL-01-00-DR-A-1100-S4-P03.pdfExisting Ground Floor Plan | 2 Sept 2022 | View |
| 20055-HL-01-00-DR-A-1500-S4-P02.pdfGround Floor Intervention Plan | 2 Sept 2022 | View |
| 20055-HL-01-00-DR-A-2000-S4-P04.pdfProposed Ground Floor Plan | 2 Sept 2022 | View |
| 20055-HL-01-M1-DR-A-1101-S4-P03.pdfExisting Mezzanine Plan | 2 Sept 2022 | View |
| 20055-HL-01-M1-DR-A-1501-S4-P02.pdfMezzanine Intervention Plan | 2 Sept 2022 | View |
| 20055-HL-01-01-DR-A-1102-S4-P03.pdfExisting First Floor Plan | 2 Sept 2022 | View |
| 20055-HL-01-01-DR-A-1502-S4-P03.pdfFirst Floor Intervention Plan | 2 Sept 2022 | View |
| 20055-HL-01-01-DR-A-2001-S4-P05.pdfProposed First Floor Plan | 2 Sept 2022 | View |
| 20055-HL-01-02-DR-A-1103-S4-P02.pdfExisting Roof Plan | 2 Sept 2022 | View |
| 20055-HL-01-02-DR-A-1503-S4-P03.pdfRoof Intervention Plan | 2 Sept 2022 | View |
| 20055-HL-01-02-DR-A-2002-S4-P03.pdfProposed Roof Plan | 2 Sept 2022 | View |
| 20055-HL-01-XX-DR-A-1200-S4-P03.pdfExisting Elevations | 2 Sept 2022 | View |
| 20055-HL-01-XX-DR-A-1300-S4-P01.pdfExisting Sections | 2 Sept 2022 | View |
| 20055-HL-01-XX-DR-A-1510-S4-P03.pdfElevation Intervention Plan | 2 Sept 2022 | View |
| 20055-HL-01-XX-DR-A-2100-S4-P04.pdfProposed Elevations | 2 Sept 2022 | View |
| 20055-HL-01-XX-DR-A-2200-S4-P03.pdfProposed Section | 2 Sept 2022 | View |
| 20055-HL-01-XX-VR-A-0002-S4-P03.pdfView of Proposed Station Entrance | 2 Sept 2022 | View |
| 20055-HL-01-XX-VR-A-0008-S4-P02.pdfView Of Proposed Glazed Entrance | 2 Sept 2022 | View |
| 9993.1A Apex Acoustics Redcar Station Business Centre noise survey report.pdfNoise Survey Report | 2 Sept 2022 | View |
| Bat Survey Report Redcar Station.pdfBat Survey Report | 2 Sept 2022 | View |
| lucion_reports_521490 received July 22.pdfAsbestos Refurbishment Report | 2 Sept 2022 | View |
| Desk Study Report - Redcar Central Station-1.pdfPhase 1 - Desk Study Report | 2 Sept 2022 | View |
| Desk Study Report - Redcar Central Station-2.pdfPhase 1 - Desk Study Report Part 2 | 2 Sept 2022 | View |
| S220421 Phase 2 Site Investigation - Redcar Central Station.pdfPhase 2 - Site Investigation | 2 Sept 2022 | View |
| 20055-HL-00-XX-RP-A-0003-S4-P02-1.pdfDesign Access and Heritage Statement | 2 Sept 2022 | View |
| 20055-HL-00-XX-RP-A-0003-S4-P02-2.pdfDesign Access and Heritage Statement Part 2 | 2 Sept 2022 | View |
| 20055-HL-00-XX-RP-A-0003-S4-P02-3.pdfDesign Access and Heritage Statement Part 3 | 2 Sept 2022 | View |
| 2022.09.05 Redcar Station Redevelopment - Planning Statement.pdfPlanning Statement | 6 Sept 2022 | View |
| HL 20055 Public Consultation for Planning Application.pdfStatement of Community Development - Public Consultation | 6 Sept 2022 | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Related records could not be loaded.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.