Council planning record

SUBMISSION OF DETAILS FOR REQUIREMENT 25 (SURFACE AND FOUL WATER DRAINAGE) IN RELATION TO STAGE 9 FOR TWO OFFSHORE WIND TURBINE GENERATING STATIONS AND ASSOCIATED INFRASTRUCTURE IN THE DOGGER BANK ZONE AND THE BOROUGH OF REDCAR AND CLEVELAND. THE FULL DESCRIPTION OF THE AUTHORISED DEVELOPMENT IS SPE...

DOGGER BANK WIND FARM C ONSHORE CONVERTER STATION (OCS) AND ASSOCIATED WORKS NEAR LACKENBY NATIONAL GRID SUBSTATION

ApprovedReference: R/2022/0303/CDRedcar and Cleveland Borough Council

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Decision Date

    Published milestoneCouncil source

Application summary

Status
Approved
Application type
Condition Discharge
Received
30 Mar 2022
Validated
30 Mar 2022
Determination deadline
Not published
Local authority
Redcar and Cleveland Borough Council

Application overview

SUBMISSION OF DETAILS FOR REQUIREMENT 25 (SURFACE AND FOUL WATER DRAINAGE) IN RELATION TO STAGE 9 FOR TWO OFFSHORE WIND TURBINE GENERATING STATIONS AND ASSOCIATED INFRASTRUCTURE IN THE DOGGER BANK ZONE AND THE BOROUGH OF REDCAR AND CLEVELAND. THE FULL DESCRIPTION OF THE AUTHORISED DEVELOPMENT IS SPE...

Proposal details

Reference
R/2022/0303/CD
Agent
Royal HaskoningDHV

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

DOGGER BANK WIND FARM C ONSHORE CONVERTER STATION (OCS) AND ASSOCIATED WORKS NEAR LACKENBY NATIONAL GRID SUBSTATION

This record has no verified map location.

Documents 10 of 10

DocumentPublishedAction
ApplicationFormRedacted.pdfApplication Form30 Mar 2022View
DBC OWF LF700013-CST-DOG-LET-0109 Cover Letter R25 SFW Drainage Scheme Stage 9.pdfCovering Letter - Drainage Scheme Stage 930 Mar 2022View
EA_R20220303CD_OFFICIAL_140422.pdfConsultee response - Environment Agency14 Apr 2022View
LLFA 0303.pdfConsultee response - Engineers (Local Lead Flood Authority)16 May 2022View
Compliance Decision Notice_R20220303CD.pdfCompliance Decision Notice R20220303cd1 Jun 2022View
DBC OWF LF700013-CST-DOG-REP-0065 SFW Drainage Scheme DCO Stage 9.pdfRequirement 25 - Drainage Scheme Stage 930 Mar 2022View
DBC OWF LF700013-CST-DOG-REP-0065 Appendix A.pdfRequirement 25 - Drainage Scheme Stage 9 Appendix A30 Mar 2022View
DBC OWF LF700013-CST-DOG-REP-0065 Appendix B.pdfRequirement 25 - Drainage Scheme Stage 9 Appendix B30 Mar 2022View
DBC OWF LF700013-CST-DOG-REP-0065 Appendix C.pdfRequirement 25 - Drainage Scheme Stage 9 Appendix C30 Mar 2022View
DBC OWF LF700013-CST-DOG-REP-0065 Appendix D.pdfRequirement 25 - Drainage Scheme Stage 9 Appendix D30 Mar 2022View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

CONDITION DISCHARGE GRANTED
Compliance Decision Notice_R20220303CD.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.