Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
LAND ALONG THE DOGGER BANK C AND SOFIA OFFSHORE WIND FARMS CABLE CORRIDOR FROM SOFIA CONVERTOR STATION SOUTH OF WILTON INTERNATIONAL INCLUDING THE CABLE CORRIDOR AND UP TO LACKENBY NATIONAL GRID SUBSTATION
Last published check: 30 Sept 2026, 06:44. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
DISCHARGE OF CONDITION 7 (SURFACE AND FOUL WATER DRAINAGE) FOR STAGE TCPA3(A) OF TCPA#3 OF THE APPROVED DEVELOPMENT OF PLANNING PERMISSION R/2020/0832/FF FOR THE INSTALLATION OF UNDERGROUND HIGH VOLTAGE ELECTRICAL CABLES AND ANCILLARY WORKS TO CONNECT EXISTING APPROVED DOGGER BANK C AND SOFIA WIND O...
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsLAND ALONG THE DOGGER BANK C AND SOFIA OFFSHORE WIND FARMS CABLE CORRIDOR FROM SOFIA CONVERTOR STATION SOUTH OF WILTON INTERNATIONAL INCLUDING THE CABLE CORRIDOR AND UP TO LACKENBY NATIONAL GRID SUBSTATION
This record has no verified map location.
| Document | Published | Action |
|---|---|---|
| ApplicationFormRedacted.pdfApplication Form | 4 Feb 2022 | View |
| CL_DBC and Sofia TCPA Cond 7 TCPA3 _V1-0_KM_14122021(1).pdfCovering Letter | 4 Feb 2022 | View |
| EA 0091.pdfConsultee response - Environment Agency | 9 Feb 2022 | View |
| R 2022 0091 CD NWL.pdfConsultee response - Northumbrian Water | 24 Feb 2022 | View |
| Consultee Response - LLFA.pdfConsultee response - Engineers (Local Lead Flood Authority) | 30 Mar 2022 | View |
| COMPLIANCE DECISION NOTICE.pdfCompliance Decision Notice | 25 May 2022 | View |
| COMPLIANCE OFFICER REPORT.pdfCompliance Officer Report | 25 May 2022 | View |
| Drainage REQ 25 - Stage 5 Part 3 Stage 13 and Stage 16 and TCPA#1 and TCPA#3 Clean FINAL 310122.pdfCondition No. 7 - Foul and Surface Wate Drainage Scheme | 4 Feb 2022 | View |
| Appendix 2.1.pdfCondition No. 7 - Appendix 2.1 Greenfield Runoff Rate Estimation | 4 Feb 2022 | View |
| 003912253-02_Sofia and Dogger Bank Consent Boundaries- Onshore Converter Station and HVAC Connection_Optimized.pdfCondition No. 7 - Sofia And Dogger Bank Consent Boundaries | 4 Feb 2022 | View |
| 004234599-02_SOF_HVAC_and_Lackenby_Substation_Stages_and_Shared_HVAC_cable_preparation_Stage.pdfCondition No. 7 - Staging Plan | 4 Feb 2022 | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Related records could not be loaded.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.