Council planning record

PARTIAL DISCHARGE OF CONDITION 12 (SURFACE WATER TREATMENT AND MANAGEMENT PLAN) OF PLANNING PERMISSION R/2020/0357/OOM FOR AN OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE DEVELOPMENT OF UP TO 418,000 SQM (GROSS) OF GENERAL INDUSTRY (USE CLASS B2) AND STORAGE OR ...

LAND AT SOUTH TEES DEVELOPMENT CORPORATION EAST OF SMITHS DOCK ROAD AND WEST OF TEES DOCK ROAD SOUTH BANK

ApprovedReference: R/2021/1096/CDRedcar and Cleveland Borough Council

Last published check: 23 Oct 2026, 03:07. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Decision Date

    Published milestoneCouncil source

Application summary

Status
Approved
Application type
Condition Discharge
Received
23 Dec 2021
Validated
23 Dec 2021
Determination deadline
Not published
Local authority
Redcar and Cleveland Borough Council

Application overview

PARTIAL DISCHARGE OF CONDITION 12 (SURFACE WATER TREATMENT AND MANAGEMENT PLAN) OF PLANNING PERMISSION R/2020/0357/OOM FOR AN OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE DEVELOPMENT OF UP TO 418,000 SQM (GROSS) OF GENERAL INDUSTRY (USE CLASS B2) AND STORAGE OR ...

Proposal details

Reference
R/2021/1096/CD
Agent
LICHFIELDS

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

LAND AT SOUTH TEES DEVELOPMENT CORPORATION EAST OF SMITHS DOCK ROAD AND WEST OF TEES DOCK ROAD SOUTH BANK

This record has no verified map location.

Documents 23 of 23

DocumentPublishedAction
61586 Covering Letter 22.12.21.pdfCovering Letter23 Dec 2021View
ApplicationFormRedacted.pdfApplication Form23 Dec 2021View
LLFA.pdfConsultee response - Engineers (Local Lead Flood Authority)11 Jan 2022View
NWL.pdfConsultee response - Northumbrian Water20 Jan 2022View
LLFA 1096.pdfConsultee response - Engineers (Local Lead Flood Authority)28 Mar 2022View
COMPLIANCE DECISION NOTICE.pdfCompliance Decision Notice25 May 2022View
COMPLIANCE OFFICER REPORT.pdfCompliance Officer Report25 May 2022View
TW-SIZ-XX-JBAU-SB-00-DR-C-0102-A1-C01-South_Bank_Long_Section_Sheet_2_of_4.pdfLong Section Sheet 2 Of 423 Dec 2021View
TW-SIZ-XX-JBAU-SB-00-DR-C-0101-A1-C01-South_Bank_Long_Section_Sheet_1_of_4.pdfLong Section Sheet 1 Of 423 Dec 2021View
TW-SIZ-XX-JBAU-SB-00-DR-C-0103-A1-C01-South_Bank_Long_Section_Sheet_3_of_4.pdfLong Section Sheet 3 Of 423 Dec 2021View
TW-SIZ-XX-JBAU-SB-00-DR-C-0201-A1-C01-South_Bank_Cross_Sections_Sheet_1_of_3.pdfCross Sections Sheet 1 Of 323 Dec 2021View
TW-SIZ-XX-JBAU-SB-00-DR-C-0104-A1-C01-South_Bank_Long_Section_Sheet_4_of_4.pdfLong Section Sheet 4 Of 423 Dec 2021View
TW-SIZ-XX-JBAU-SB-00-DR-C-0202-A1-C02-South_Bank_Cross_Sections_Sheet_2_of_3.pdfCross Sections Sheet 2 Of 323 Dec 2021View
TW-SIZ-XX-JBAU-SB-00-DR-C-0003-A1-C02-South_Bank_General_Arrangement_High_Tip_North.pdfGeneral Arrangement High Tip North23 Dec 2021View
TW-SIZ-XX-JBAU-SB-00-DR-C-0203-A1-C02-South_Bank_Cross_Sections_Sheet_3_of_3.pdfCross Sections Sheet 3 Of 323 Dec 2021View
TW-SIZ-XX-JBAU-SB-00-DR-C-0004-A1-C02-South_Bank_General_Arrangement_Inner_Tidal_Channel.pdfGeneral Arrangement Inner Tidal Channel23 Dec 2021View
TW-SIZ-XX-JBAU-SB-00-DR-C-0002-A1-C02-South_Bank_General_Arrangement_High_Tip_West.pdfGeneral Arrangement High Tip West23 Dec 2021View
TW-SIZ-XX-JBAU-SB-00-DR-C-0301-A1-C01-South_Bank_Details_Sheet_1_of_4.pdfDetails Sheet 1 Of 423 Dec 2021View
TW-SIZ-XX-JBAU-SB-00-DR-C-0303-A1-C01-South_Bank_Details_Sheet_3_of_4.pdfDetails Sheet 3 Of 423 Dec 2021View
TW-SIZ-XX-JBAU-SB-00-DR-C-0304-A1-C01-South_Bank_Details_Sheet_4_of_4.pdfDetails Sheet 4 Of 423 Dec 2021View
TW-SIZ-XX-JBAU-SB-00-DR-C-0302-A1-C02-South_Bank_Details_Sheet_2_of_4.pdfDetails Sheet 2 Of 423 Dec 2021View
TW-SIZ-XX-JBAU-SB-00-DR-C-0001-A1-C02-South_Bank_Key_Plan.pdfKey Plan23 Dec 2021View
TW-SIZ-XX-JBAU-SB-ZZ-RP-C-0006-S4-P01-Asset_Maintenance_Plan.pdfDrainage Network: Asset Maintenance Plan1 Mar 2022View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

CONDITION DISCHARGE GRANTED
COMPLIANCE DECISION NOTICE.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.