Council planning record

ENGINEERING OPERATION TO CREATE TRENCH ASSOCIATED WITH THE SUBTERRANEAN DIVERSION OF THE BRAVO-10 PIPE BRIDGE

LAND AT TEESPORT SOUTH BANK

WithdrawnReference: R/2021/0676/FFRedcar and Cleveland Borough Council

Last published check: 27 Oct 2026, 23:54. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Start

    Published milestoneCouncil source
  4. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Date

    Published milestoneCouncil source

Application summary

Status
Withdrawn
Application type
Full
Received
6 Aug 2021
Validated
18 Aug 2021
Determination deadline
Not published
Local authority
Redcar and Cleveland Borough Council

Application overview

ENGINEERING OPERATION TO CREATE TRENCH ASSOCIATED WITH THE SUBTERRANEAN DIVERSION OF THE BRAVO-10 PIPE BRIDGE

Proposal details

Reference
R/2021/0676/FF
Agent
Lichfields

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

LAND AT TEESPORT SOUTH BANK

This record has no verified map location.

Documents 16 of 16

DocumentPublishedAction
Covering Letter 09.07.21.pdfCovering Letter6 Aug 2021View
ApplicationFormRedacted.pdfApplication Form6 Aug 2021View
Consultee Response - Natural Heritage Manager.pdfConsultee Response - Natural Heritage Manager26 Aug 2021View
R 2021 0676 FF NWL.pdfConsultee response - Northumbrian Water1 Sept 2021View
CWI01511 Cont Land.pdfConsultee response - Environmental Protection (Contaminated Land)3 Sept 2021View
0676.pdfConsultee response - Environmental Protection (Nuisance)9 Sept 2021View
Consultee Response - Highways.pdfConsultee response - Engineering Team (Highways)13 Oct 2021View
LLFA.pdfConsultee response - Engineers (Local Lead Flood Authority)27 Oct 2021View
Neighbour Comments - Sembcorp (Holding Response).pdfNeighbour Comments - Sembcorp Utilities (Holding Response (1)26 Aug 2021View
SembcorpObjectionLetter_FINAL.PDFNeighbour Comments - Sembcorp Utilities (2)6 Sept 2021View
ASQUITH R.pdfNeighbour Comments - BOC Ltd (1)10 Sept 2021View
21 09 09 - PLANNING APPLICATION - R-2021-0676-FF.pdfNeighbour Comments - PD Ports10 Sept 2021View
210910 BOC additional objection R 2021 0676 FF final.pdfNeighbour Comments - BOC Ltd (2) & SABIC10 Sept 2021View
MGT.pdfNeighbour Comments - MGT Teeside Ltd14 Sept 2021View
STDC-ATK-SBK-XX-DR-SE-0100.pdfCulvert Plan as Existing18 Aug 2021View
210518_Bravo10 Ecology report_ RevA_INCA.pdfINCA Ecology Report6 Aug 2021View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

WITHDRAWN
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.