Council planning record

DISCHARGE OF CONDITION 6 (HAMP) OF PLANNING PERMISSION R/2020/0355/FFM FOR STAGE TCPA3 PART 1 FOR INSTALLATION OF UNDERGROUND HIGH VOLTAGE ELECTRICAL CABLES AND ANCILLARY WORKS WITHIN FIVE AREAS TO CONNECT EXISTING APPROVED DOGGER BANK C AND SOFIA WIND OFFSHORE WIND FARMS AND LACKENBY SUBSTATION AND...

LAND ALONG THE DOGGER BANK C AND SOFIA OFFSHORE WIND FARMS CABLE CORRIDOR BETWEEN LANDFALL NEAR MARSKE BY THE SEA AND LACKENBY NATIONAL GRID SUBSTATION

ApprovedReference: R/2021/0594/CDRedcar and Cleveland Borough Council

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Decision Date

    Published milestoneCouncil source

Application summary

Status
Approved
Application type
Condition Discharge
Received
14 Jul 2021
Validated
14 Jul 2021
Determination deadline
Not published
Local authority
Redcar and Cleveland Borough Council

Application overview

DISCHARGE OF CONDITION 6 (HAMP) OF PLANNING PERMISSION R/2020/0355/FFM FOR STAGE TCPA3 PART 1 FOR INSTALLATION OF UNDERGROUND HIGH VOLTAGE ELECTRICAL CABLES AND ANCILLARY WORKS WITHIN FIVE AREAS TO CONNECT EXISTING APPROVED DOGGER BANK C AND SOFIA WIND OFFSHORE WIND FARMS AND LACKENBY SUBSTATION AND...

Proposal details

Reference
R/2021/0594/CD
Agent
CLAIRE DAVIES

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

LAND ALONG THE DOGGER BANK C AND SOFIA OFFSHORE WIND FARMS CABLE CORRIDOR BETWEEN LANDFALL NEAR MARSKE BY THE SEA AND LACKENBY NATIONAL GRID SUBSTATION

This record has no verified map location.

Documents 10 of 10

DocumentPublishedAction
ApplicationFormRedacted.pdfApplication Form14 Jul 2021View
Consultee Response - Engineers.pdfConsultee response - Engineering Team (Highways)25 Aug 2021View
Compliance Decision Notice_R20210594CD.pdfCompliance Decision Notice R20210594cd2 Sept 2021View
Compliance Officer report _R20210594CD.pdfCompliance Officer Report R20210594cd2 Sept 2021View
DBC SOFIA OWF Cover Letter Con 6 HAMP Stage TCPA3 Part 1.pdfCondition 6 - Cover Letter14 Jul 2021View
DBC SOFIA OWF HAMP DCO Stage 5 Pt 1 and Stage TCPA3 Pt1.pdfCondition 6 - HAMP14 Jul 2021View
DBC SOFIA OWF HAMP DCO Stage 5 Pt 1 and Stage TCPA3 Pt1 Appendix 2.1 and 2.2.pdfCondition 6 - Consnet Boundaries14 Jul 2021View
DBC SOFIA OWF HAMP DCO Stage 5 Pt 1 and Stage TCPA3 Pt1 Appendix 3.1.pdfCondition 6 - Site Access Location Plan14 Jul 2021View
DBC SOFIA OWF HAMP DCO Stage 5 Pt 1 and Stage TCPA3 Pt1 Appendix 4.1 and 4.2.pdfCondition 6 - Directional Signage Strategy Plan14 Jul 2021View
DBC SOFIA OWF HAMP DCO Stage 5 Pt 1 and Stage TCPA3 Pt1 Appendix 5.1.pdfCondition 6 - Dilapidations Scoping Correspondance14 Jul 2021View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

CONDITION DISCHARGE GRANTED
Compliance Decision Notice_R20210594CD.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.