Council planning record

SUBMISSION OF DETAILS FOR REQUIREMENT 25 (1) (2) (3) (SURFACE AND FOUL WATER DRAINAGE) FOR STAGE 10 FOR TWO OFFSHORE WIND TURBINE GENERATING STATIONS AND ASSOCIATED INFRASTRUCTURE IN THE DOGGER BANK ZONE AND THE BOROUGH OF REDCAR AND CLEVELAND. THE FULL DESCRIPTION OF THE AUTHORISED DEVELOPMENT IS S...

LAND ALONG THE DOGGER BANK C AND SOFIA OFFSHORE WIND FARMS CABLE CORRIDOR BETWEEN LANDFALL NEAR MARSKE BY THE SEA AND LACKENBY NATIONAL GRID SUBSTATION

ApprovedReference: R/2021/0565/CDRedcar and Cleveland Borough Council

Last published check: 27 Sept 2026, 23:40. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Decision Date

    Published milestoneCouncil source

Application summary

Status
Approved
Application type
Condition Discharge
Received
5 Jul 2021
Validated
5 Jul 2021
Determination deadline
Not published
Local authority
Redcar and Cleveland Borough Council

Application overview

SUBMISSION OF DETAILS FOR REQUIREMENT 25 (1) (2) (3) (SURFACE AND FOUL WATER DRAINAGE) FOR STAGE 10 FOR TWO OFFSHORE WIND TURBINE GENERATING STATIONS AND ASSOCIATED INFRASTRUCTURE IN THE DOGGER BANK ZONE AND THE BOROUGH OF REDCAR AND CLEVELAND. THE FULL DESCRIPTION OF THE AUTHORISED DEVELOPMENT IS S...

Proposal details

Reference
R/2021/0565/CD
Agent
Arcus Consultancy Services Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

LAND ALONG THE DOGGER BANK C AND SOFIA OFFSHORE WIND FARMS CABLE CORRIDOR BETWEEN LANDFALL NEAR MARSKE BY THE SEA AND LACKENBY NATIONAL GRID SUBSTATION

This record has no verified map location.

Documents 18 of 18

DocumentPublishedAction
ApplicationFormRedacted.pdfApplication Form5 Jul 2021View
EA 0565.pdfConsultee response - Environment Agency8 Jul 2021View
NWL.pdfConsultee response - Northumbrian Water23 Jul 2021View
LLFA.pdfConsultee response - Engineers (Local Lead Flood Authority)4 Aug 2021View
Compliance Decision Notice_R20210565CD.pdfCompliance Decision Notice R20210565cd31 Aug 2021View
Compliance Officer report _R20210565CD.pdfCompliance Officer Report R20210565cd31 Aug 2021View
CL_Sofia_Rq25_St10_V1-2_KM_29062021(1).pdfCovering letter5 Jul 2021View
46941_OCS_Drainage_Final_201214_CLEAN_PlanningPortal_KM_30062021.pdfRequirement 25 - Foul and Surface Water Drainage Scheme5 Jul 2021View
65202409-DWG-105-0 Enabling Works Platform Sections Sheet 1.pdfRequirement 25 - Enabling Works Platform Sections Sheet 15 Jul 2021View
65202409-DWG-163-01 Drainage Construction Details.pdfRequirement 25 - Drainage Construction Details Sheet 35 Jul 2021View
65202409-DWG-106-0 Enabling Works Platform Sections Sheet 2.pdfRequirement 25 - Enabling Works Platform Sections Sheet 25 Jul 2021View
65202409-DWG-161-01 Drainage Construction Details.pdfRequirement 25 - Drainage Construction Details Sheet 15 Jul 2021View
65202409-DWG-162-01 Drainage Construction Details.pdfRequirement 25 - Drainage Construction Details Sheet 25 Jul 2021View
65202409-DWG-104-0.02 Enabling Works Construction Details.pdfRequirement 25 - Enabling Works Construction Details5 Jul 2021View
65202409-DWG-160-01_OCS_Operational_Drainage_Layout.pdfRequirement 25 - Operational Drainage Layout5 Jul 2021View
65202409-DWG-103-0_Enabling Works Platform Layout.pdfRequirement 25 - Enabling Works Platform Layout5 Jul 2021View
65202409-DWG-150-01_OCS_Enabling_Works_Drainage_Layout.pdfRequirement 25 - Enabling Works Drainage Layout5 Jul 2021View
65202406-DOC-102-2 Drainage Design Statement.pdfRequirement 25 - Site Drainage Design Statement5 Jul 2021View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

CONDITION DISCHARGE GRANTED
Compliance Decision Notice_R20210565CD.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.