Council planning record

CONSTRUCTION OF THE REDCAR ENERGY CENTRE (REC) CONSISTING OF A MATERIAL RECOVERY FACILITY INCORPORATING A BULK STORAGE FACILITY; AN ENERGY RECOVERY FACILITY; AND AN INCINERATOR BOTTOM ASH RECYCLING FACILITY ALONG WITH ANCILLARY INFRASTRUCTURE AND LANDSCAPING

LAND AT REDCAR BULK TERMINAL REDCAR TS10 5QW

ApprovedReference: R/2020/0411/FFMRedcar and Cleveland Borough Council

Last published check: 29 Oct 2026, 00:04. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Start

    Published milestoneCouncil source
  4. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Date

    Published milestoneCouncil source

Application summary

Status
Approved
Application type
Major Application
Received
3 Aug 2020
Validated
3 Aug 2020
Determination deadline
Not published
Local authority
Redcar and Cleveland Borough Council

Application overview

CONSTRUCTION OF THE REDCAR ENERGY CENTRE (REC) CONSISTING OF A MATERIAL RECOVERY FACILITY INCORPORATING A BULK STORAGE FACILITY; AN ENERGY RECOVERY FACILITY; AND AN INCINERATOR BOTTOM ASH RECYCLING FACILITY ALONG WITH ANCILLARY INFRASTRUCTURE AND LANDSCAPING

Proposal details

Reference
R/2020/0411/FFM
Agent
RPS Consulting UK and Ireland

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

LAND AT REDCAR BULK TERMINAL REDCAR TS10 5QW

This record has no verified map location.

Documents 94 of 94

DocumentPublishedAction
ApplicationFormRedacted.pdfApplication Form3 Aug 2020View
HSL-200812090017-321-HazardPdf.pdfConsultee response - Health & Safety Executive12 Aug 2020View
Consultee Response - Natural Heritage Manager.pdfConsultee response - Natural Heritage Manager13 Aug 2020View
R 20 0411 NATS.pdfConsultee response - NATS13 Aug 2020View
R 20 0411 HSE.pdfConsultee response - HSE13 Aug 2020View
NETWORK RAIL.pdfConsultee response - Network Rail25 Aug 2020View
EP CL.pdfConsultee response - Environmental Protection (Contaminated Land)27 Aug 2020View
HSL-200827094204-321-FinalOutcome (1).pdfConsultee response - HSE padhi+27 Aug 2020View
R 2020 0411 FFM NWL.pdfConsultee response - Northumbrian Water27 Aug 2020View
411 air quality.pdfConsultee response - Environmental Protection (Air Quality)1 Sept 2020View
411 nuisance.pdfConsultee response - Environmental Protection (Nuisance)1 Sept 2020View
LLFA.pdfConsultee response - Local Lead Flood Authority2 Sept 2020View
411 NEAR.pdfConsultee response - Archaeological Consultant2 Sept 2020View
Consultee Response - Sabic Pipeline Operator.pdfConsultee response - TPEP Sabic Pipeline Operator2 Sept 2020View
Consultee Response - Police Alo.pdfConsultee response - Cleveland Police2 Sept 2020View
325067 R_2020_0411_FFM - Proposed Redcar Energy Centre, Land at Redcar Bulk Terminal, Redcar.pdfConsultee response - Natural England4 Sept 2020View
SBC.pdfConsultee response - Stockton Borough Council4 Sept 2020View
ENG 0411.pdfConsultee response - Engineering Team (Highways)17 Sept 2020View
mbc 0411.pdfConsultee response - Middlesbrough Borough Council17 Sept 2020View
EA R_2020_0411_FFM 24 September 2020 OFFICIAL.pdfConsultee response - Environment Agency24 Sept 2020View
EA R_2020_0411_FFM v2 10 November 2020 OFFICIAL .pdfConsultee response - Environment Agency10 Nov 2020View
2020 12 29 Redcar Energy Centre Conditions.pdfConsultee response - Highways England7 Jan 2021View
Decision 0411.pdfDecision Notice27 Jan 2021View
19216-RPS-SI-XX-DR-A-5309-P02-Site Location Plan.pdfLocation Plan3 Aug 2020View
Letter on behalf of Anglo American.pdfNeighbour Comments - Anglo American Woodsmith24 Sept 2020View
19216-RPS-EW-XX-DR-A-5301-P01-Proposed REC South Elevation(1).pdfProposed REC South Elevation3 Aug 2020View
19216-RPS-SI-XX-DR-A-5002-P05-Proposed Site Plan.pdfProposed Site Plan3 Aug 2020View
19216-RPS-EW-XX-DR-A-5302-P01-Proposed REC West Elevation(1).pdfProposed REC West Elevation3 Aug 2020View
19216-RPS-EW-XX-DR-A-5303-P01-Proposed REC North Elevation(1).pdfProposed REC North Elevation3 Aug 2020View
19216-RPS-EW-XX-DR-A-5304-P01-Proposed ACC Elevations(1).pdfProposed ACC Elevations3 Aug 2020View
19216-RPS-IB-XX-DR-A-5380-P01-Proposed IBA Elevations(1).pdfProposed IBA Elevations3 Aug 2020View
19216-RPS-MF-XX-DR-A-5350-P01-Proposed North and East Elevation.pdfProposed North & East Elevations3 Aug 2020View
19216-RPS-MF-XX-DR-A-5351-P01-Proposed South and West Elevations.pdfProposed South & West Elevations3 Aug 2020View
19216-RPS-MF-XX-DR-A-5352-P02-Proposed Office Elevations(1).pdfProposed Office Elevations3 Aug 2020View
19216-RPS-EW-XX-DR-A-5200-P01-Proposed Section 1(2).pdfProposed Section 13 Aug 2020View
19216-RPS-EW-XX-DR-A-5300-P01-Proposed REC East Elevation(1).pdfProposed REC East Elevations3 Aug 2020View
Figure 6.1_Planning Constraints Plan.pdfFigure 6.1 - Planning Constraints Plan3 Aug 2020View
Figure 6.2c ZTV Local.pdfFigure 6.2c - Zone of Theoretical Visibilty3 Aug 2020View
Figure 6.3 Representative Viewpoint Locations.pdfFigure 6.3 - Representative Viewpoint Locations3 Aug 2020View
Figure 6.4 Contextual Viewpoint Locations.pdfFigure 6.4 - Contextual Viewpoints Locations3 Aug 2020View
Figure 6.8 Local Character Areas.pdfFigure 6.8 - Local Character Areas3 Aug 2020View
Figure 7.1 Designated Sites within 15km.pdfFigure 7.1 - Designated Sites within 15km3 Aug 2020View
Figure 7.2 Theoretical zone visibility for wader birds on Bran Sands.pdfFigure 7.2 - Theoretical Zone Visibility for Wader Birds3 Aug 2020View
Figure 8.1 Hydrology and Flood Risk Study Area.pdfFigure 8.1 - Hydrology and Flood Risk Study Area3 Aug 2020View
Figure 6.9 Landscape Strategy.pdfFigure 6.9 - Landscape Strategy3 Aug 2020View
Figure 11.3 Construction Dust Figure.pdfFigure 11.3 - Construction Dust Figure3 Aug 2020View
Figure 11.4 LT Contour 80m Stack.pdfFigure 11.4 - LT Contour 80m Stack3 Aug 2020View
Figure 11.5 ST Contour 80m Stack.pdfFigure 11.5 - ST Contour 80m Stack3 Aug 2020View
Figure 12.1 Impact Piling Noise Levels.pdfFigure 12.1 - Impact Piling Noise Levels3 Aug 2020View
Figure 12.2 CFA Piling Noise Levels.pdfFigure 12.2 - CFA Piling Noise Levels3 Aug 2020View
Figure 12.3 Operational Noise Levels.pdfFigure 12.3 - Operational Noise Levels3 Aug 2020View
Appendix 11.2 - Detailed Baseline Assessment.pdfAppendix 11.2 - Detailed Baseline Assessment3 Aug 2020View
Appendix 11.3 - Detailed Construction Phase Dust Assessment Methodology.pdfAppendix 11.3 - Detailed Construction Phase Dust Assessment3 Aug 2020View
Appendix 11.4 - Detailed Stack Height Determination(1).pdfAppendix 11.4 - Detailed Stack Height3 Aug 2020View
Appendix 11.5 - Air Quality Impacts on Designated Habitat Sites.pdfAppendix 11.5 - Air Quality Impacts3 Aug 2020View
Appendix 11.6 - Discrete Sensitive Receptor Results.pdfAppendix 11.6 - Discrete Sensitive Receptor Results3 Aug 2020View
Appendix 11.7 - WI BAT Results.pdfAppendix 11.7 - WI BAT Results3 Aug 2020View
Appendix 13.1 Archaeological Desk Based Assessment - Formatted.pdfAppendix 13.1 - Archaelogical Desk Based Assessment3 Aug 2020View
11366_REC Planning Statement_S_AS.pdfPlanning statement3 Aug 2020View
Pre-App Consultation Report 14-07-2020 Final (1).pdfStatement of community involvement3 Aug 2020View
Appendix 11.1 - Air Quality Planning Policy Context.pdfAppendix 11.1 - Air Quality Planning Policy Context3 Aug 2020View
Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdfAppendix 9.1 - Preliminary Phase 1 Risk Assessment3 Aug 2020View
11366_REC_Notice Letter_R_AS.pdfNotice of Ownership3 Aug 2020View
Appendix 1.1 Information Required with an ES.pdfAppendix 1.1 - Information Required with an ES3 Aug 2020View
Appendix 1.2 Statement of Expertise - formatted.pdfAppendix 1.2 - Statement of Expertise3 Aug 2020View
Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdfAppendix 4.1 - Scoping Report and Opinion3 Aug 2020View
Appendix 4.2 List of Cumulative Developments.pdfAppendix 4.2 - List of Cumulative Developments3 Aug 2020View
Appendix 6.1 LVIA Planning Policy Context.pdfAppendix 6.1 - LVIA Planning Policy Context3 Aug 2020View
Appendix 7.2 Ecology PEA.pdfAppendix 7.2 - Ecology PEA3 Aug 2020View
Appendix 8.3 WFD.pdfAppendix 8.3 - Water Framework Directive Assessment3 Aug 2020View
Redcar Volume 3 Front Cover.pdfList of Appendices3 Aug 2020View
Redcar Volume 2 Front Cover.pdfList of Figures3 Aug 2020View
Figure 11.1 Windroses.pdfFigure 11.1 - Windroses3 Aug 2020View
Figure 6.9 Tree and Shrub Schedule.pdfFigure 6.9 - Tree & Shrub Schedule3 Aug 2020View
Figure 11.2 Stacks and Receptors.pdfFigure 11.2 - Stacks & Receptors3 Aug 2020View
Redcar Volume 1 Front Cover.pdfEnvironmental Statement - Chapter list3 Aug 2020View
Chapter 1 Introduction.pdfEnvironmental Statement - Chapter 1 - Introduction3 Aug 2020View
Chapter 4 - EIA Methodology.pdfEnvironmental Statement - Chapter 4 - Enviromental Assessment Methodology3 Aug 2020View
Chapter 5 Planning Policy.pdfEnvironmental Statement - Chapter 5 - Planning Policy3 Aug 2020View
Chapter 6 Landscape and Visual Impact.pdfEnvironmental Statement - Chapter 6 - Landscape & Visual Impact Assessment3 Aug 2020View
Chapter 9 Geology Hydrogeology and Contamination.pdfEnvironmental Statement - Chapter 9 - Geology, Hydrogeology & Contamination3 Aug 2020View
Chapter 10 Transport.pdfEnvironmental Statement - Chapter 10 - Transport3 Aug 2020View
Chapter 11 Air Quality.pdfEnvironmental Statement - Chapter 11 - Air Quality3 Aug 2020View
Chapter 12 Noise and Vibration.pdfEnvironmental Statement - Chapter 12 - Noise & Vibration3 Aug 2020View
Chapter 13 - Other Environmental Effects.pdfEnvironmental Statement - Chapter 13 - Other Environmental Affects3 Aug 2020View
Chapter 2 Project Description.pdfEnvironmental Statement - Chapter 2 - Project Description3 Aug 2020View
Chapter 7 Ecology and Ornithology.pdfEnvironmental Statement - Chapter 7 - Ecology & Ornithology3 Aug 2020View
Chapter 3 Needs and Alternatives - formatted.pdfEnvironmental Statement - Chapter 3 - Needs and Alternatives Considered3 Aug 2020View
Chapter 8 Hydrology and Flood Risk.pdfEnvironmental Statement - Chapter 8 - Hydrology & Flood Risk3 Aug 2020View
Non Technical Summary.pdfNon Technical Summary3 Aug 2020View
Appendix 8.2 Outline Drainage Strategy.pdfAppendix 8.2 - Outline Drainage Strategy3 Aug 2020View
SEC8563 Redcar EfW Outfall Pipe Phase 1 Note_Final_20.10.29(1).pdfOutfall Assessment10 Nov 2020View
11366_Response to Anglo American_AS_S.pdfResponse to comments from Anglo American12 Nov 2020View
Appendix 10.1 Transport Assessment.pdfAppendix 10.1 - Transport Assessment10 Dec 2020View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

GRANT PLANNING PERMISSION
Decision 0411.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.