Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
LAND AT FORMER SOUTH BANK WORKS; GRANGETOWN PRAIRIE; BRITISH STEEL AND WARRENBY AREA
Last published check: 29 Oct 2026, 10:36. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceDEMOLITION OF STRUCTURES AND ENGINEERING OPERATIONS ASSOCIATED WITH GROUND PREPARATION AND TEMPORARY STORAGE OF SOILS AND ITS FINAL USE IN THE REMEDIATION AND PREPARATION OF LAND FOR REGENERATION AND DEVELOPMENT
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsLAND AT FORMER SOUTH BANK WORKS; GRANGETOWN PRAIRIE; BRITISH STEEL AND WARRENBY AREA
This record has no verified map location.
| Document | Published | Action |
|---|---|---|
| Application Form 0427.pdfApplication Form | 1 Jul 2019 | View |
| 60686_01 - RCBC - Covering Leter - 28.06.19.pdfCovering Letter | 1 Jul 2019 | View |
| Consultee Response Employment Growth.pdfConsultee response - Business & Employment Growth | 5 Jul 2019 | View |
| NORTHERN GAS NETWORKS 0427.pdfConsultee response - Northern Gas Networks | 17 Jul 2019 | View |
| R_2019_0427_FFM - Natural England.pdfConsultee response - Natural England | 23 Jul 2019 | View |
| Consultee response - Network Rail.pdfConsultee response - Network Rail | 25 Jul 2019 | View |
| Consultee Response - Engineers.pdfConsultee response - Engineering Team (Highways) | 30 Jul 2019 | View |
| MGE03867.pdfConsultee response - Environmental Protection (Contaminated Land) | 6 Aug 2019 | View |
| MGE03868.pdfConsultee response - Environmental Protection (Nuisance) | 6 Aug 2019 | View |
| R 2019 0427 FFM 8 8 2019.pdfConsultee response - Environment Agency | 8 Aug 2019 | View |
| LLFA comments.pdfConsultee response - Engineers (Local Lead Flood Authority) | 23 Aug 2019 | View |
| Decision Notice_R20190427FFM.pdfDecision Notice | 27 Sept 2019 | View |
| STDC-SCW-XX-PLA-0001 Materials Storage - Site Location Plan.PDFLocation Plan | 1 Jul 2019 | View |
| Officer report _R20190427FFM.pdfOfficer Report pdf | 26 Sept 2019 | View |
| neighbour comments Kella Midstream CATS.pdfNeighbour Comments - Kellas Midstream (CATS) | 19 Jul 2019 | View |
| 08082019-170921-_Redacted.pdfNeighbour Comments - British Steel Limited | 12 Aug 2019 | View |
| 41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdfOutline Remediation Strategy SUPERSEDED | 1 Jul 2019 | View |
| STDC-SIZ-GP-PLA-0003 Stockpile 1a.PDFDetails and Sections for Material Storage for Stockpile Site 1A | 1 Jul 2019 | View |
| STDC-SIZ-GP-PLA-0004 Stockpile 1b.PDFDetails and Sections for Material Storage for Stockpile Site 1B | 1 Jul 2019 | View |
| STDC-SIZ-GP-PLA-0005 Stockpile 1c.PDFDetails and Sections for Material Storage for Stockpile Site 1C | 1 Jul 2019 | View |
| STDC-SIZ-GP-PLA-0006 Grangetown Prairie Proposed use - existing spot levels.PDFTypical Exisitng Spot Levels for Grangetown Prairie | 1 Jul 2019 | View |
| STDC-SIZ-GP-PLA-0007 Grangetown Prairie Site Plan.PDFSite Plan for Grangetown Prairie | 1 Jul 2019 | View |
| STDC-SIZ-LA-PLA-0001 Lackenby proposed use levels.PDFTypical Spot Levels for Lackenby Area | 1 Jul 2019 | View |
| STDC-SIZ-MR-PLA-0001 Metals Recovery Existing Long Section.PDFExisting Site Levels Contours and Long Section for Metals Recovery | 1 Jul 2019 | View |
| STDC-SIZ-MR-PLA-0002 Metals Recovery Existing Cross Sections.PDFExisting Site Levels / Cross Sections for Metals Recovery | 1 Jul 2019 | View |
| STDC-SIZ-MR-PLA-0003 Metals Recovery Stock pile 2 Contours & Sections.PDFContours and Sections for Metals Recovery for Stockpile Site 2 | 1 Jul 2019 | View |
| STDC-SIZ-MR-PLA-0004 Metals Recovery Site Plan.PDFSite Plan for Metals Recovery | 1 Jul 2019 | View |
| STDC-SIZ-SB-PLA-0001 South Bank proposed use levels.PDFTypical Existing Spot Levels for South Bank | 1 Jul 2019 | View |
| STDC-NEZ-WA-PLA-0001 Warrenby CLE31 Existing contours and long sections.PDFExisting Site Levels Contours and Long Section for Warrenby | 1 Jul 2019 | View |
| STDC-NEZ-WA-PLA-0002 Warrenby CLE31 Existing cross sections.PDFExisting Site Levels / Cross Sections for Warrenby | 1 Jul 2019 | View |
| STDC-NEZ-WA-PLA-0003 Stock pile 3a details & sections.PDFDetails and Sections for Material Storage for Stockpile Site 3A | 1 Jul 2019 | View |
| STDC-NEZ-WA-PLA-0004 Stock pile 3b details & sections.PDFDetails and Sections for Material Storage for Stockpile Site 3B | 1 Jul 2019 | View |
| STDC-NEZ-WA-PLA-0005 Warrenby proposed use levels.PDFTypical Spot Levels for Warrenby | 1 Jul 2019 | View |
| STDC-NEZ-WA-PLA-0006 Warrenby CLE 31 Area Site Plan.PDFSite Plan for Warrenby | 1 Jul 2019 | View |
| STDC-SCW-XX-PLA-0002 Materials Storage Site Location Plan with mounds.PDFLocation Plan showing Storage Mounds | 1 Jul 2019 | View |
| STDC-SIZ-GP-PLA-0001- Grangetown Prairie Existing Contours.PDFExisting Site Levels Contours and Long Section for Grangetown Prairie | 1 Jul 2019 | View |
| STDC-SIZ-GP-PLA-0002 - Grangetown Prairie Cross Sections.PDFExisting Site Levels / Cross Sections for Grangetown Prairie | 1 Jul 2019 | View |
| NQMS Declaration 0619-C0008.pdfNQMS Declaration of Document Adequacy | 1 Jul 2019 | View |
| 201920 Ecology report final.pdfEcology Report | 1 Jul 2019 | View |
| 60686_01 - Planning Statement - 28.06.19.pdfPlanning Statement | 1 Jul 2019 | View |
| 41825-WOOD-XX-XX-TN-WM-0001_S2_P01.3 Soil Stockpiling Outline and Regulatory Regime.PDFTechnical Note | 1 Jul 2019 | View |
| 1 Appendix A1 Enviro Insight Report Final.PDFOutline Remediation Strategy - Appendix A1 Former South Bank Works | 1 Jul 2019 | View |
| 2 Appendix A2 Geo Insight Report Final.pdfOutline Remediation Strategy - Appendix A2 Geo Insight Report | 1 Jul 2019 | View |
| 3 Appendix A3 Small Scale Grid Index.PDFOutline Remediation Strategy - Appendix A3 Maps | 1 Jul 2019 | View |
| 4 Appendix A3 Small Scale Section 1-1.PDFOutline Remediation Strategy - Appendix A3 Section 1 - 1 | 1 Jul 2019 | View |
| 5 Appendix A3 Small Scale Section 1-2.PDFOutline Remediation Strategy - Appendix A3 Section 1 - 2 | 1 Jul 2019 | View |
| 6 Appendix A3 Small Scale Section 2-1.PDFOutline Remediation Strategy - Appendix A3 Section 2 - 1 | 1 Jul 2019 | View |
| 7 Appendix A3 Small Scale Section 2-2.PDFOutline Remediation Strategy - Appendix A3 Section 2 - 2 | 1 Jul 2019 | View |
| 8 Appendix A3 1.1250 Scale Grid Index.PDFOutline Remediation Strategy - Appendix A3 1:1250 Scale Grid Index | 1 Jul 2019 | View |
| 9 Appendix A3 1.1250 Scale Sections 1-1 to 1-3.PDFOutline Remediation Strategy - Appendix A3 Section 1 - 1 to 1 - 3 | 1 Jul 2019 | View |
| 10 Appendix A3 1.1250 Scale Sections 1-4 to 2-3.PDFOutline Remediation Strategy - Appendix A3 Section 1 - 4 to 2 - 3 | 1 Jul 2019 | View |
| 11 Appendix A3 1.1250 Scale Sections 2-4 to 3-4.PDFOutline Remediation Strategy - Appendix A3 Section 2 - 4 to 3 - 4 | 1 Jul 2019 | View |
| 12 Appendix A3 1.1250 Scale Sections 3-5 to 4-2.PDFOutline Remediation Strategy - Appendix A3 Section 3 - 5 to 4 - 2 | 1 Jul 2019 | View |
| 13 Appendix A3 1.1250 Scale Sections 4-3 to 5-2.PDFOutline Remediation Strategy - Appendix A3 Section 4 - 3 to 5 - 2 | 1 Jul 2019 | View |
| 14 Appendix A3 1.1250 Scale Sections 5-3 to 5-5.PDFOutline Remediation Strategy - Appendix A3 Section 5 - 3 to 5 - 5 | 1 Jul 2019 | View |
| 15 Appendix A3 1.1250 Scale Sections 6-2 to 6-4.PDFOutline Remediation Strategy - Appendix A3 Section 6 - 2 to 6 - 4 | 1 Jul 2019 | View |
| 16 Appendix A3 1.2500 Scale Grid Index.PDFOutline Remediation Strategy - Appendix A3 Section 1:2500 Scale Grid Index | 1 Jul 2019 | View |
| 17 Appendix A3 1.2500 Scale Sections 1-1 to 2-1.PDFOutline Remediation Strategy - Appendix A3 Section 1 - 1 to 2 - 1 | 1 Jul 2019 | View |
| 18 Appendix A3 1.2500 Scale Sections 2-2 to 2-4.PDFOutline Remediation Strategy - Appendix A3 Section 2 - 2 to 2 - 4 | 1 Jul 2019 | View |
| 19 Appendix A3 1.2500 Scale Sections 3-1 to 3-4.PDFOutline Remediation Strategy - Appendix A3 Section 3 - 1 to 3 - 4 | 1 Jul 2019 | View |
| 20 Appendix A3 1.2500 Scale Sections 4-1 to 4-3.PDFOutline Remediation Strategy - Appendix A3 Section 4 - 1 to 4 - 3 | 1 Jul 2019 | View |
| 21 Appendix A3 1.2500 Scale Sections 4-4 to 5-3.PDFOutline Remediation Strategy - Appendix A3 Section 4 - 4 to 5 - 3 | 1 Jul 2019 | View |
| Appendix B1 Enviro Insight Report.PDFOutline Remediation Strategy - Appendix B1 Grangetown Prairie | 1 Jul 2019 | View |
| Appendix B2 Geo Insight Report(1).PDFOutline Remediation Strategy - Appendix B2 Geo Insight Report | 1 Jul 2019 | View |
| Appendix B3 Maps (all scales)(1).PDFOutline Remediation Strategy - Appendix B3 Maps | 1 Jul 2019 | View |
| 1 Appendix C1 Enviro Insight Report.PDFOutline Remediation Strategy - Appendix C1 Plate Mill | 1 Jul 2019 | View |
| 2 Appendix C2 Geo Insight Report.PDFOutline Remediation Strategy - Appendix C2 Geo Insight Report | 1 Jul 2019 | View |
| 3 Appendix C3 Maps.PDFOutline Remediation Strategy - Appendix C3 Maps | 1 Jul 2019 | View |
| 4 Appendix C3 1.1250 Scale Sections 1-1 to 1-2.PDFOutline Remediation Strategy - Appendix C3 Section 1 - 1 to 1 - 2 | 1 Jul 2019 | View |
| 5 Appendix C3 1.1250 Scale Sections 2-1 to 2-3.PDFOutline Remediation Strategy - Appendix C3 Section 2 - 1 to 2 - 3 | 1 Jul 2019 | View |
| 6 Appendix C3 1.1250 Scale Sections 2-4 to 3-1.PDFOutline Remediation Strategy - Appendix C3 Section 2 - 4 to 3 - 1 | 1 Jul 2019 | View |
| 7 Appendix C3 1.1250 Scale Sections 3-2 to 3-4.PDFOutline Remediation Strategy - Appendix C3 Section 3 - 2 to 3 - 4 | 1 Jul 2019 | View |
| 8 Appendix C3 1.2500 Scale Maps.PDFOutline Remediation Strategy - Appendix C3 Section 1:1250 Scale Maps | 1 Jul 2019 | View |
| 1 Appendix D1 Enviro Insight Report.PDFOutline Remediation Strategy - Appendix D1 Coatham Marsh & Warrenby Landfill | 1 Jul 2019 | View |
| 2 Appendix D2 Geo Insight Report.PDFOutline Remediation Strategy - Appendix D2 Geo Insight Report | 1 Jul 2019 | View |
| 3 Appendix D3 Small Scale Maps.PDFOutline Remediation Strategy - Appendix D3 Maps | 1 Jul 2019 | View |
| 4 Appendix D3 1.1250 Scale Grid Index to Section 1-2.PDFOutline Remediation Strategy - Appendix D3 Section 1 - 1 | 1 Jul 2019 | View |
| 5 Appendix D3 1.1250 Scale Sections 1-3 to 2-2.PDFOutline Remediation Strategy - Appendix D3 Section 1 - 3 to 2 - 2 | 1 Jul 2019 | View |
| 6 Appendix D3 1.1250 Scale Sections 2-3 to 2-5.PDFOutline Remediation Strategy - Appendix D3 Section 2 - 3 to 2 - 5 | 1 Jul 2019 | View |
| 7 Appendix D3 1.1250 Scale Sections 3-1 to 3-3.PDFOutline Remediation Strategy - Appendix D3 Section 3 - 1 to 3 - 3 | 1 Jul 2019 | View |
| 8 Appendix D3 1.1250 Scale Sections 3-4 to 4-5.PDFOutline Remediation Strategy - Appendix D3 Section 3 - 4 to 4 - 5 | 1 Jul 2019 | View |
| 9 Appendix D3 1.2500 Scale Grid Index to Section 1-4.PDFOutline Remediation Strategy - Appendix D3 1:2500 Scale Grid Index Section 1 - 4 | 1 Jul 2019 | View |
| 10 Appendix D3 1.2500 Scale Sections 2-1 to 2-4.PDFOutline Remediation Strategy - Appendix D3 Section 2 - 1 to 2 - 4 | 1 Jul 2019 | View |
| 11 Appendix D3 1.2500 Scale Sections 3-1 to 3-4.PDFOutline Remediation Strategy - Appendix D3 Section 3 - 1 to 3 - 4 | 1 Jul 2019 | View |
| 41825-WOOD-XX-XX-RP-OW-0001_A_P01.pdfFlood Risk Assessment and Drainage Strategy | 1 Jul 2019 | View |
| WOOD-XX-XX-DR-OW-0001_S2_P01.1.PDFFlood Risk Assessment and Drainage Strategy - Appendix A Figure A1 | 1 Jul 2019 | View |
| WOOD-XX-XX-DR-OW-0002_S2_P01.1.PDFFlood Risk Assessment and Drainage Strategy - Appendix A Figure A2 | 1 Jul 2019 | View |
| WOOD-XX-XX-DR-OW-0003_S2_P01.1.PDFFlood Risk Assessment and Drainage Strategy - Appendix A Figure A3 | 1 Jul 2019 | View |
| 1 - RR_GP1A.PDFFlood Risk Assessment and Drainage Strategy - Appendix B 1 | 1 Jul 2019 | View |
| 2 - RR_GP1B.PDFFlood Risk Assessment and Drainage Strategy - Appendix B 2 | 1 Jul 2019 | View |
| 3 - RR_GP1C.PDFFlood Risk Assessment and Drainage Strategy - Appendix B 3 | 1 Jul 2019 | View |
| 4 - RR_MR2.PDFFlood Risk Assessment and Drainage Strategy - Appendix B 4 | 1 Jul 2019 | View |
| Management and Maintenance Plan v2.PDFFlood Risk Assessment and Drainage Strategy - Appendix D Management & Maintenance Plan | 1 Jul 2019 | View |
| 5 - RR_WB3A.PDFFlood Risk Assessment and Drainage Strategy - Appendix B 5 | 1 Jul 2019 | View |
| 6 - RR_WB3B.PDFFlood Risk Assessment and Drainage Strategy - Appendix B 6 | 1 Jul 2019 | View |
| NET-GP.PDFFlood Risk Assessment and Drainage Strategy - Appendix C Network Design Table for Grangetwon Prairie | 1 Jul 2019 | View |
| NET-MR2.PDFFlood Risk Assessment and Drainage Strategy - Appendix C Network Design Table for Metals Recovery | 1 Jul 2019 | View |
| NET-WB3A.PDFFlood Risk Assessment and Drainage Strategy - Appendix C Network Design Table for Warrenby 3A | 1 Jul 2019 | View |
| NET-WB3B.PDFFlood Risk Assessment and Drainage Strategy - Appendix C Network Design Table for Warrenby B | 1 Jul 2019 | View |
| 41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdfOutline Remediation Strategy Amended 24.7.2019 | 24 Jul 2019 | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Related records could not be loaded.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.