Council planning record

USE OF VACANT LAND AS A TEMPORARY FACILITIES AREA AND ASSOCIATED ENGINEERING WORK TO ALLOW PHASED CONSTRUCTION OF THE TEESREP BIOMASS FUELLED GENERATING STATION

LAND OFF TEES DOCK ROAD TEESPORT GRANGETOWN

ApprovedReference: R/2017/0087/FFMRedcar and Cleveland Borough Council

Last published check: 30 Sept 2026, 01:12. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Start

    Published milestoneCouncil source
  4. Weekly List Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Decision Date

    Published milestoneCouncil source

Application summary

Status
Approved
Application type
Major Application
Received
7 Feb 2017
Validated
23 May 2017
Determination deadline
Not published
Local authority
Redcar and Cleveland Borough Council

Application overview

USE OF VACANT LAND AS A TEMPORARY FACILITIES AREA AND ASSOCIATED ENGINEERING WORK TO ALLOW PHASED CONSTRUCTION OF THE TEESREP BIOMASS FUELLED GENERATING STATION

Proposal details

Reference
R/2017/0087/FFM
Agent
TECNICAS REUNIDAS

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

LAND OFF TEES DOCK ROAD TEESPORT GRANGETOWN

This record has no verified map location.

Documents 18 of 18

DocumentPublishedAction
SKM_C224e17022710160_Redacted.pdfApplication Form27 Feb 2017View
CLEVELAND POLICE.pdfConsultee response - Cleveland Police5 Jun 2017View
2017-0087 land off Tees Dock Road HO.pdfConsultee response - Development Engineers13 Jun 2017View
R 17 0087 Con Land.pdfConsultee response - Environmental Protection (Contaminated Land)22 Jun 2017View
R 17 0087 Nuisance.pdfConsultee response - Environmental Protection (Nuisance)22 Jun 2017View
R 17 0087 Con Land(1).pdfConsultee response - Environmental Protection (Contaminated Land)8 Aug 2017View
Decision Notice_R20170087FFM.pdfDecision Notice22 Aug 2017View
Drawing -sheet 8.pdfLocation Plan16 May 2017View
Drawing - sheet 6.pdfLaydown Area Phase 2 Plan16 May 2017View
Drawing - sheet 9.pdfBoundary Fencing Plan16 May 2017View
Drawing - sheet 10.pdfDrainage Plan16 May 2017View
TJH-A0-DRG03 P3(1).pdfTransport Route Plan16 May 2017View
70110 Teesside - Design and Access Statement - West Lackenby - Rev 05.pdfDesign and Access Statement16 May 2017View
Sample Excavations Sampling - West Lackenby.pdfSample Excavations of Trial Pits18 May 2017View
WAC Test - Sample Results.pdfCertificate of Analysis18 May 2017View
70110 Teesside -FRA extracts_SPB_300517.pdfFlood Risk Assessment30 May 2017View
4138 - TeesRep Biomass Power Station (Final (Email) 18.07.2017).pdfLand Contamination Assessment Report21 Jul 2017View
OCU-HSE-RAM-70110-0007_Rev 0 - Accepted.pdfRisk Assessment and Method Statement31 Jul 2017View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

GRANT PLANNING PERMISSION
Decision Notice_R20170087FFM.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.