Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
LAND AT HUNTSMAN POLYURETHANES WILTON SITE LAZENBY
Last published check: 30 Sept 2026, 20:17. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourcePROPOSED ENERGY CENTRE TO INCLUDE STEEL FRAMED BUILDING; CHIMNEY STACK (45.3M HIGH); COOLING TOWERS; PLANT AND EQUIPMENT TO GENERATE HEAT AND POWER FROM NATURAL GAS AND HYDROGEN AND A WATER TREATMENT PLANT
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsLAND AT HUNTSMAN POLYURETHANES WILTON SITE LAZENBY
This record has no verified map location.
| Document | Published | Action |
|---|---|---|
| ApplicationFormNoPersonalData.pdfApplication Form | 27 Jul 2015 | View |
| File_Note_3_HSE%20does_not_advise_against_the_proposed_development_RCBC.1303-2015-00154[1].pdfConsultee response - Health & Safety Executive | 4 Aug 2015 | View |
| Consultee Response Dev Engineers 0466.pdfConsultee response - Development Engineers | 10 Aug 2015 | View |
| MGE01747 Contaminated Land 0466.pdfConsultee response - Environmental Protection (Contaminated Land) | 20 Aug 2015 | View |
| MGE01748 0466 Nuisance.pdfConsultee response - Environmental Protection (Nuisance) | 20 Aug 2015 | View |
| Consultee Response - Local Lead Flood Authority Officer 0466.pdfConsultee response - Local Lead Flood Authoirty Officer | 27 Aug 2015 | View |
| Decision Notice_R20150466FF.pdfDecision Notice | 6 Oct 2015 | View |
| CRM.327.001.P.D.002_-_Wilton_Energy_Park_-_Site_Boundary_Plan.pdfSite Boundary Plan | 27 Jul 2015 | View |
| CRM.327.001.P.D.001_-_Wilton_Energy_Park_-_Site_Location_Plan.pdfLocation Plan | 27 Jul 2015 | View |
| CRM.327.001.P.D.003_-_Wilton_Energy_Park_-_Land_Ownership_and_Red_Line.pdfLand Ownership and Site Boundary | 27 Jul 2015 | View |
| CRM.327.001.P.D.004_-_Wilton_Energy_Park_-_Site_Layout.pdfSite Layout | 27 Jul 2015 | View |
| existing drainage plan.pdfExisting Drainage Plan | 27 Jul 2015 | View |
| Option 2 - Huntsman elevations - Compressor With Cladding.pdfProposed Plans and Elevations - Option 2 Compressor Option | 27 Jul 2015 | View |
| Option 1 - Huntsman elevations - steam turbine-With Cladding.pdfProposed Plans and Elevations - Option 1 Steam Turbine Option | 27 Jul 2015 | View |
| Air quality report.pdfAir Quality Assessment | 27 Jul 2015 | View |
| CRM.327.001.PL.R.001.B Planning Statement.pdfPlanning Statement | 27 Jul 2015 | View |
| CRM 327 001 GE R 001 Final rev b_LQ.pdfGeo-Environmental Report | 27 Jul 2015 | View |
| CRM.327.001.PL.R.002.B Design and access statement.pdfDesign and Access Statement | 27 Jul 2015 | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Related records could not be loaded.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.