Council planning record

ERECTION OF 14 INDUSTRIAL UNITS IN 4 BLOCKS (CLASSES B1, B2 & B8) WITH ASSOCIATED SERVICE AREA AND 76 SPACE CAR PARK (PHASE 2)

GREEN SQUARE, TROISDORF WAY, KIRKLEATHAM, TS10 5RX

ApprovedReference: R/2010/0949/FFMRedcar and Cleveland Borough Council

Last published check: 3 Oct 2026, 09:06. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Start

    Published milestoneCouncil source
  4. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Date

    Published milestoneCouncil source

Application summary

Status
Approved
Application type
Major Application
Received
20 Dec 2010
Validated
20 Dec 2010
Determination deadline
Not published
Local authority
Redcar and Cleveland Borough Council

Application overview

ERECTION OF 14 INDUSTRIAL UNITS IN 4 BLOCKS (CLASSES B1, B2 & B8) WITH ASSOCIATED SERVICE AREA AND 76 SPACE CAR PARK (PHASE 2)

Proposal details

Reference
R/2010/0949/FFM
Agent
IN ARCHITECTURE LIMITED

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

GREEN SQUARE, TROISDORF WAY, KIRKLEATHAM, TS10 5RX

This record has no verified map location.

Documents 19 of 19

DocumentPublishedAction
R 2010 0949.pdfDecision NoticeNot publishedView
Topographical Survey as Existing.pdfTopographical Survey as Existing.pdf20 Dec 2010View
Site Section.pdfSite Section.pdf20 Dec 2010View
Proposed Roof Plans C9 - C12 and C14 - C15.pdfProposed Roof Plans C9 - C12 and C14 - C15.pdf20 Dec 2010View
Proposed Elevation C9 - C12.pdfProposed Elevation C9 - C12.pdf20 Dec 2010View
Proposed Roof Plans C1 - C4 and C5 - C8.pdfProposed Roof Plans C1 - C4 and C5 - C8.pdf20 Dec 2010View
Proposed Plans C9 - C12 and C14 - C15.pdfProposed Plans C9 - C12 and C14 - C15.pdf20 Dec 2010View
Proposed Plans C1 - C4 and C5 - C8.pdfProposed Plans C1 - C4 and C5 - C8.pdf20 Dec 2010View
Proposed Elevation C14 - C15.pdfProposed Elevation C14 - C15.pdf20 Dec 2010View
Location Plan.pdfLocation Plan.pdf20 Dec 2010View
Proposed Elevation C1 - C4.pdfProposed Elevation C1 - C4.pdf20 Dec 2010View
Proposed Elevation C5 - C8.pdfProposed Elevation C5 - C8.pdf20 Dec 2010View
Desk Top Study Ground Investigation Report.pdfDesk Top Study Ground Investigation Report.pdf20 Dec 2010View
Application Form.pdfApplication Form.pdf20 Dec 2010View
Design and Access Statement.pdfDesign and Access Statement.pdf20 Dec 2010View
Existing Site Plan.pdfExisting Site Plan.pdf5 Jan 2011View
Proposed Site Plan SUPERCEDED.pdfProposed Site Plan SUPERCEDED.pdf5 Jan 2011View
Gas monitoring results.pdfGas monitoring results.pdf25 Jan 2011View
Proposed Site Plan REVISED 21 02 2011.pdfProposed Site Plan REVISED 21 02 2011.pdf28 Feb 2011View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

APPROVED
R 2010 0949.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.