Council planning record

Full planning permission for the demolition of the existing building and the erection of a residential-led mixed-use development comprising 205 Use Class C3 residential units, with Use Class E and Sui Generis on the ground floor and with some elements at lower ground floor, plus public realm, hard and soft landscaping, access and servicing arrangements, cycle parking, and other associated works.

53, Former Thames Valley Police Station , Castle Street , Reading , RG1 7TH

Under ConsultationReference: PL/26/0869Reading Borough Council

Last published check: 21 Oct 2026, 01:16. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received date

    Published milestoneCouncil source
  2. Valid date

    Published milestoneCouncil source
  3. Earliest decision date

    Published milestoneCouncil source
  4. Application expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Under Consultation
Application type
Full planning permission
Received
1 Jul 2026
Validated
1 Jul 2026
Determination deadline
30 Sept 2026
Local authority
Reading Borough Council

Application overview

Full planning permission for the demolition of the existing building and the erection of a residential-led mixed-use development comprising 205 Use Class C3 residential units, with Use Class E and Sui Generis on the ground floor and with some elements at lower ground floor, plus public realm, hard and soft landscaping, access and servicing arrangements, cycle parking, and other associated works.

Proposal details

Reference
PL/26/0869
Alternative references
PP-14849157
Ward
Abbey Ward
Agent
Mr Anil Fermahan

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

53, Former Thames Valley Police Station , Castle Street , Reading , RG1 7TH

This record has no verified map location.

Documents 426 of 426

DocumentPublishedAction
01962-JTP-SP_12-Proposed Sitewide - Level 10 Plan-P1.pdf · PDF1 Jul 2026View
Appendix 9.7 Be Green BRUKL reports · PDF6 Jul 2026View
Appendix 9.4 Be Lean BRUKL reports · PDF6 Jul 2026View
01962-JTP-BA_04-Proposed Block A - Level 02 Plan-P1.pdf · PDF1 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
01962-JTP-EX_15-Existing Site - Level 03 Plan-P1.pdf · PDF1 Jul 2026View
Plant Noise Assessment Acoustic Technical Note.pdf · PDF1 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
Utilities Statement .pdf · PDF1 Jul 2026View
01962-JTP-BB_20-Proposed Block B Elevations 1 and 2-P1.pdf · PDF1 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
vp_Baseline-026 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
CombinedReport_B _Be Lean_2026-03-19_10-31-18 · PDF7 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
Article 13 Notice Police · PDF6 Jul 2026View
9.1 CombinedReport_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
vp_Baseline-026 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
Delivery and Servicing Plan.pdf · PDF1 Jul 2026View
25020-EXA-ZZ-RF-DR-L-00104 LANDSCAPE GENERAL ARRANGEMENT PLAN - ROOF LEVEL.pdf · PDF1 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
vp_Baseline-026 Jul 2026View
CombinedReport_B _Be Lean_2026-03-19_10-31-18 · PDF7 Jul 2026View
01962-JTP-S_01-Location Plan-P1.pdf · PDF1 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
CombinedReport_B _Be Lean_2026-03-19_10-31-18 · PDF7 Jul 2026View
CombinedReport_B _Be Lean_2026-03-19_10-31-18 · PDF7 Jul 2026View
01962-JTP-SP_10-Proposed Sitewide - Level 08 Plan-P1.pdf · PDF1 Jul 2026View
CombinedReport_B _Be Lean_2026-03-19_10-31-18 · PDF7 Jul 2026View
01962-JTP-BA_02-Proposed Block A - Ground Floor Plan-P1.pdf · PDF1 Jul 2026View
CombinedReport_B _Be Green_2026-03-19_11-58-11. · PDF7 Jul 2026View
Ecological Assessment.pdf · PDF1 Jul 2026View
ApplicationFormRedacted.pdf · PDF1 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
CombinedReport_B _Be Lean_2026-03-19_10-31-18 · PDF7 Jul 2026View
01962-JTP-SP_18-Proposed Sitewide - Level 16 Plan-P1.pdf · PDF1 Jul 2026View
BlockCompliance_Block B_2026-05-15_16-15-30 · PDF7 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
CombinedReport_B _Be Lean_2026-03-19_10-31-18 · PDF7 Jul 2026View
9.1 CombinedReport_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
CombinedReport_B _Be Green_2026-03-19_11-58-11. · PDF7 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
Flood Risk Assessment Drainage Strategy and SuDS Assessment Part 3.pdf · PDF1 Jul 2026View
Appendix 9.8 Apartment PEA's Block B · PDF6 Jul 2026View
01962-JTP-SP_04-Proposed Sitewide - Level 02 Plan-P1.pdf · PDF1 Jul 2026View
Article 13 Form · PDF6 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
Heritage Townscape and Visual Impact Assessment Part 5.pdf · PDF1 Jul 2026View
01962-JTP-BA_05-Proposed Block A - Level 03 Plan-P1.pdf · PDF1 Jul 2026View
vp_Baseline-026 Jul 2026View
Appendix 9.8 Apartment PEA's Block B · PDF6 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
Biodiversity Net Gain Assessment.pdf · PDF1 Jul 2026View
CombinedReport_B _Be Green_2026-03-19_11-58-11. · PDF7 Jul 2026View
Reading Borough Council Adjoining Landowner Comments (22/9)Public comments28 Sept 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
9.1 CombinedReport_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
01962-JTP-BA_06-Proposed Block A - Level 04 Plan-P1.pdf · PDF1 Jul 2026View
01962-JTP-SP_13-Proposed Sitewide - Level 11 Plan-P1.pdf · PDF1 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
Appendix 9.3 Be Lean SAP reports-BlockCompliance_Block A_2026-05-15_16-06-42 · PDF7 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
CombinedReport_B _Be Lean_2026-03-19_10-31-18 · PDF7 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
CombinedReport_B _Be Green_2026-03-19_11-58-11. · PDF7 Jul 2026View
01962-JTP-BB_04-Proposed Block B - Level 12 Plan-P1.pdf · PDF1 Jul 2026View
BREEAM Pre-Assessment Report.pdf · PDF1 Jul 2026View
Land Contamination Phase 1 Desk Study Part 3.pdf · PDF1 Jul 2026View
01962-JTP-EX_10-Existing Site - Basement Level 02 Plan-P1.pdf · PDF1 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
CombinedReport_B _Be Lean_2026-03-19_10-31-18 · PDF7 Jul 2026View
Land Contamination Phase 1 Desk Study Part 2.pdf · PDF1 Jul 2026View
01962-JTP-BB_02-Proposed Block B - Ground Floor Plan-P1.pdf · PDF1 Jul 2026View
01962-JTP-BA_11-Proposed Block A - Level 09 Plan-P1.pdf · PDF1 Jul 2026View
01962-JTP-SP_09-Proposed Sitewide - Level 07 Plan-P1.pdf · PDF1 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
CombinedReport_B _Be Green_2026-03-19_11-58-11. · PDF7 Jul 2026View
vp_Baseline-026 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
Noise Assessment Planning Stage Report.pdf · PDF1 Jul 2026View
01962-JTP-EX_03-Existing Topo Survey Plan - Podium Level-P1.pdf · PDF1 Jul 2026View
vp_Baseline-026 Jul 2026View
vp_Baseline-026 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
CombinedReport_B _Be Green_2026-03-19_11-58-11. · PDF7 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
Travel Plan.pdf · PDF1 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
01962-JTP-DP_02-Demolition Plan - Basement 01 Level (Mezzanine)-P1.pdf · PDF1 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
CombinedReport_B _Be Lean_2026-03-19_10-31-18 · PDF7 Jul 2026View
Land Contamination Phase 1 Desk Study Part 7.pdf · PDF1 Jul 2026View
CombinedReport_B _Be Green_2026-03-19_11-58-11. · PDF7 Jul 2026View
vp_Baseline Photos6 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
Design & Access StatementDesign and Access Statement · PDF20 Aug 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
CombinedReport_B _Be Lean_2026-03-19_10-31-18 · PDF7 Jul 2026View
CombinedReport_B _Be Lean_2026-03-19_10-31-18 · PDF7 Jul 2026View
01962-JTP-SP_11-Proposed Sitewide - Level 09 Plan-P1.pdf · PDF1 Jul 2026View
01962-JTP-BA_28-Proposed Block A Sections EE-P1.pdf · PDF1 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
Appendix 9.7 Be Green BRUKL reports · PDF6 Jul 2026View
CombinedReport_B _Be Lean_2026-03-19_10-31-18 · PDF7 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
01962-JTP-EX_14-Existing Site - Level 02 Plan-P1.pdf · PDF1 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
Appendix 9.8 Apartment PEA's Block B · PDF6 Jul 2026View
Archaeological Desk-Based Assessment.pdf · PDF1 Jul 2026View
CombinedReport_B _Be Green_2026-03-19_11-58-11. · PDF7 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
Ecological Assessment. · PDF7 Jul 2026View
1083 Flint Street, Castle Street, Reading Statutory Metric7 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
01962-JTP-SP_17-Proposed Sitewide - Level 15 Plan-P1.pdf · PDF1 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
Energy Strategy.pdf · PDF1 Jul 2026View
CombinedReport_B _Be Lean_2026-03-19_10-31-18 · PDF7 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
CombinedReport_B _Be Lean_2026-03-19_10-31-18 · PDF7 Jul 2026View
Appendix 9.8 Apartment PEA's Block B · PDF6 Jul 2026View
eb7_verified views-10376_Thames Valley Police-Reading · PDF6 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
Appendix 9.8 Apartment PEA's Block B · PDF6 Jul 2026View
Overheating Study.pdf · PDF1 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
CombinedReport_B _Be Green_2026-03-19_11-58-11. · PDF7 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
CombinedReport_B _Be Green_2026-03-19_11-58-11. · PDF7 Jul 2026View
Flood Risk Assessment Drainage Strategy and SuDS Assessment Part 5.pdf · PDF1 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
CombinedReport_B _Be Lean_2026-03-19_10-31-18 · PDF7 Jul 2026View
25020-EXA-ZZ-01-DR-L-00101 LANDSCAPE GENERAL ARRANGEMENT PLAN - LEVEL 01.pdf · PDF1 Jul 2026View
vp_Baseline-026 Jul 2026View
Design and Access Statement Part 4.pdf · PDF1 Jul 2026View
R1 Issue 2 Outline Fire Strategy Report.pdf · PDF1 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
Internal Daylight Sunlight Report.pdf · PDF1 Jul 2026View
Overheating Study · PDF7 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
vp_Baseline-026 Jul 2026View
CombinedReport_B _Be Green_2026-03-19_11-58-11. · PDF7 Jul 2026View
01962-JTP-S_02-Proposed Site Plan-P1.pdf · PDF1 Jul 2026View
Appendix 9.8 Apartment PEA's Block B · PDF6 Jul 2026View
25020-EXA-ZZ-06-DR-L-00102 LANDSCAPE GENERAL ARRANGEMENT PLAN - LEVEL 06.pdf · PDF1 Jul 2026View
01962-JTP-BA_26-Proposed Block A Sections AA BB-P1.pdf · PDF1 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
01962-JTP-SP_01-Proposed Sitewide - Basement Plan-P1.pdf · PDF1 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
9.1 CombinedReport_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
Design and Access Statement Part 2.pdf · PDF1 Jul 2026View
01962-JTP-DP_01-Demolition Plan - Basement 02 Level-P1.pdf · PDF1 Jul 2026View
01962-JTP-DP_04-Demolition Plan - Roof Level-P1.pdf · PDF1 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
01962-JTP-BA_25-Proposed Block A+B Elevation 9-P1 · PDF6 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
01962-JTP-SP_15-Proposed Sitewide - Level 13 Plan-P1.pdf · PDF1 Jul 2026View
Appendix 9.4 Be Lean BRUKL reports · PDF6 Jul 2026View
eb7_verified view methodology_10376_Thames Valley Police-Reading. · PDF6 Jul 2026View
Appendix 9.9 Plant datasheets product-technical-details-EWSAH-UD9W6 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
CombinedReport_B _Be Lean_2026-03-19_10-31-18 · PDF7 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
Appendix 9.8 Apartment PEA's Block B · PDF6 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
CombinedReport_B _Be Green_2026-03-19_11-58-11. · PDF7 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
CombinedReport_B _Be Green_2026-03-19_11-58-11. · PDF7 Jul 2026View
01962-JTP-BB_01-Proposed Block B - Basement Plan-P1.pdf · PDF1 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
01962-JTP-EX_11-Existing Site - Basement Level 01 Plan-P1.pdf · PDF1 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
9.1 CombinedReport_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
Design and Access Statement Part 6.pdf · PDF1 Jul 2026View
Flint Street Cover Letter June 2026.pdf · PDF1 Jul 2026View
01962-JTP-BA_01-Proposed Block A - Basement Plan-P1.pdf · PDF1 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
Design and Access Statement Part 5.pdf · PDF1 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
01962-JTP-SP_07-Proposed Sitewide - Level 05 Plan-P1.pdf · PDF1 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
01962-JTP-SP_05-Proposed Sitewide - Level 03 Plan-P1.pdf · PDF1 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
Appendix 9.9 Plant datasheets · PDF6 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
25020-EXA-ZZ-12-DR-L-00103 LANDSACPE GENERAL ARRANGEMENT PLAN - LEVEL 12.pdf · PDF1 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
25020-EXA-ZZ-GF-DR-L-00100 LANDSCAPE GENERAL ARRANGEMENT PLAN - GROUND FLOOR.pdf · PDF1 Jul 2026View
01962-JTP-BA_03-Proposed Block A - Level 01 Plan-P1.pdf · PDF1 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
Appendix 9.8 Apartment PEA's Block B · PDF6 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
SAP Assessments · PDF6 Jul 2026View
Appendix 9.8 Apartment PEA's Block B · PDF6 Jul 2026View
Heritage Townscape and Visual Impact Assessment Part 2.pdf · PDF1 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
Transport Assessment.pdf · PDF1 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
Energy Strategy. · PDF7 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
9.1 CombinedReport_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
CombinedReport_B _Be Lean_2026-03-19_10-31-18 · PDF7 Jul 2026View
Appendix 9.8 Apartment PEA's Block B · PDF6 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
Land Contamination Phase 1 Desk Study Part 4.pdf · PDF1 Jul 2026View
Appendix 9.8 Apartment PEA's Block B · PDF6 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
Land Contamination Phase 1 Desk Study Part 1.pdf · PDF1 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
01962-JTP-SP_03-Proposed Sitewide - Level 01 Plan-P1.pdf · PDF1 Jul 2026View
CombinedReport_B _Be Green_2026-03-19_11-58-11. · PDF7 Jul 2026View
Appendix 9.8 Apartment PEA's Block B · PDF6 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
Article 13 Notice RBC · PDF6 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
CombinedReport_B _Be Green_2026-03-19_11-58-11. · PDF7 Jul 2026View
vp_Baseline-026 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
01962-JTP-EX_02-Existing Topo Survey Plan - Basement Level-P1.pdf · PDF1 Jul 2026View
01962-JTP-BA_23-Proposed Block A Elevations 5 and 6-P1.pdf · PDF1 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
CombinedReport_B _Be Green_2026-03-19_11-58-11. · PDF7 Jul 2026View
01962-JTP-SP_22-Proposed Sitewide - Roof Plan-P1.pdf · PDF1 Jul 2026View
Sustainability Statement.pdf · PDF1 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
01962-JTP-BB_05-Proposed Block B - Level 13-15 Plan-P1.pdf · PDF1 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
01962-JTP-BA_10-Proposed Block A - Level 08 Plan-P1.pdf · PDF1 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
01962-JTP-BA_09-Proposed Block A - Level 07 Plan-P1.pdf · PDF1 Jul 2026View
Heritage Townscape and Visual Impact Assessment Part 4.pdf · PDF1 Jul 2026View
01962-JTP-BA_24-Proposed Block A Elevations 7 and 8-P1.pdf · PDF1 Jul 2026View
Appendix 9.8 Apartment PEA's Block B · PDF6 Jul 2026View
Heritage Townscape and Visual Impact Assessment Part 1.pdf · PDF1 Jul 2026View
CombinedReport_B _Be Green_2026-03-19_11-58-11. · PDF7 Jul 2026View
Appendix 9.8 Apartment PEA's Block B · PDF6 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
01962-JTP-BA_20-Proposed Block A Elevations 1 and 2-P1.pdf · PDF1 Jul 2026View
vp_Baseline-026 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
Appendix 9.8 Apartment PEA's Block B · PDF6 Jul 2026View
01962-JTP-BA_27-Proposed Block A Sections CC DD-P1.pdf · PDF1 Jul 2026View
Appendix 9.5 Part O Overheating6 Jul 2026View
Land Contamination Phase 1 Desk Study Part 5.pdf · PDF1 Jul 2026View
vp_Baseline-026 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
Appendix 9.8 Apartment PEA's Block B · PDF6 Jul 2026View
Appendix 9.8 Apartment PEA's Block B · PDF6 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
CombinedReport_B _Be Lean_2026-03-19_10-31-18 · PDF7 Jul 2026View
BlockCompliance_Block A_2026-05-15_16-26-12 · PDF7 Jul 2026View
01962-JTP-EX_01-Existing Site Plan-P1.pdf · PDF1 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
vp_Baseline-026 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
01962-JTP-BA_21-Proposed Block A Elevation 3-P1.pdf · PDF1 Jul 2026View
01962-JTP-SP_06-Proposed Sitewide - Level 04 Plan-P1.pdf · PDF1 Jul 2026View
R2 Issue 2 Gateway One Fire Statement.pdf · PDF1 Jul 2026View
01962-JTP-DP_03-Demolition Plan - Podium Level-P1.pdf · PDF1 Jul 2026View
01962-JTP-BA_07-Proposed Block A - Level 05 Plan-P1.pdf · PDF1 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
vp_Baseline-026 Jul 2026View
01962-JTP-BB_21-Proposed Block B Elevations 3 and 4-P1.pdf · PDF1 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
01962-JTP-EX_13-Existing Site - Level 01 Plan-P1.pdf · PDF1 Jul 2026View
01962-JTP-SS_10-Proposed Site Sections-P1.pdf · PDF1 Jul 2026View
01962-JTP-EX_20-Existing Site Sections-P1.pdf · PDF1 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
9.1 CombinedReport_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
BlockCompliance_Block B_2026-05-15_16-19-01 · PDF7 Jul 2026View
01962-JTP-SP_02-Proposed Sitewide - Ground Floor Plan-P1.pdf · PDF1 Jul 2026View
Appendix 9.8 Apartment PEA's Block B · PDF6 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
Statement of Community Involvement.pdf · PDF1 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
01962-JTP-EX_16-Existing Site - Level 04 Plan-P1.pdf · PDF1 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
Appendix 9.1 Total emissions6 Jul 2026View
01962-JTP-BA_12-Proposed Block A - Roof Plan-P1.pdf · PDF1 Jul 2026View
9.1 CombinedReport_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
CombinedReport_B _Be Lean_2026-03-19_10-31-18 · PDF7 Jul 2026View
Daylight Sunlight Effects Report.pdf · PDF1 Jul 2026View
01962-JTP-BB_06-Proposed Block B - Roof Plan-P1.pdf · PDF1 Jul 2026View
Flint Street Planning Statement .pdf · PDF1 Jul 2026View
Arboricultural Survey Impact Assessment Method Statement.pdf · PDF1 Jul 2026View
25020-EXA-ZZ-ZZ-DR-L-00001 SITEWIDE LANDSCAPE MASTERPLAN.pdf · PDF1 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
01962-JTP-EX_12-Existing Site - Ground Floor Plan-P1.pdf · PDF1 Jul 2026View
Air Quality Assessment.pdf · PDF1 Jul 2026View
01962-JTP-BA_22-Proposed Block A Elevation 4-P1.pdf · PDF1 Jul 2026View
Heritage Townscape and Visual Impact Assessment Part 3.pdf · PDF1 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
01962-JTP-SP_16-Proposed Sitewide - Level 14 Plan-P1.pdf · PDF1 Jul 2026View
Appendix 9.9 Plant datasheets Daikin UK Selection Report 10422529 - EWYT350B-XRA2. · PDF6 Jul 2026View
vp_Baseline-026 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
01962-JTP-BA_08-Proposed Block A - Level 06 Plan-P1.pdf · PDF1 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
CombinedReport_B _Be Green_2026-03-19_11-58-11. · PDF7 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
Flood Risk Assessment Drainage Strategy and SuDS Assessment Part 2.pdf · PDF1 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
CombinedReport_B _Be Green_2026-03-19_11-58-11. · PDF7 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
Appendix 9.8 Apartment PEA's Block B · PDF6 Jul 2026View
Flood Risk Assessment Drainage Strategy and SuDS Assessment Part 1.pdf · PDF1 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
01962-JTP-EX_17-Existing Site - Roof Plan-P1.pdf · PDF1 Jul 2026View
9.1 CombinedReport_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
Heritage Townscape and Visual Impact Assessment Part 8.pdf · PDF1 Jul 2026View
01962-JTP-BB_22-Proposed Block B Sections AA BB-P1.pdf · PDF1 Jul 2026View
Design and Access Statement Part 3.pdf · PDF1 Jul 2026View
CombinedReport_B _Be Lean_2026-03-19_10-31-18 · PDF7 Jul 2026View
Biodiversity Net Gain Assessment · PDF7 Jul 2026View
CombinedReport_B _Be Lean_2026-03-19_10-31-18 · PDF7 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
Heritage Townscape and Visual Impact Assessment Part 6.pdf · PDF1 Jul 2026View
Land Contamination Phase 1 Desk Study. · PDF6 Jul 2026View
Appendix 9.8 Apartment PEA's Block B · PDF6 Jul 2026View
Flood Risk Assessment Drainage Strategy and SuDS Assessment Part 4.pdf · PDF1 Jul 2026View
Appendix 9.5 Part O Overheating6 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
01962-JTP-BB_03-Proposed Block B - Level 01-11 Plan-P1.pdf · PDF1 Jul 2026View
Design and Access Statement Part 7.pdf · PDF1 Jul 2026View
Heritage Townscape and Visual Impact Assessment Part 7.pdf · PDF1 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
9.1 CombinedReport_A_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
Design and Access Statement Part 1.pdf · PDF1 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
9.1 CombinedReport_Be Green_2026-03-19_11-32-09 · PDF7 Jul 2026View
CombinedReport_B _Be Green_2026-03-19_11-58-11. · PDF7 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
Land Contamination Phase 1 Desk Study Part 6.pdf · PDF1 Jul 2026View
Appendix 9.8 Apartment PEA's Block B · PDF6 Jul 2026View
01962-JTP-SP_14-Proposed Sitewide - Level 12 Plan-P1.pdf · PDF1 Jul 2026View
Wind Microclimate Assessment.pdf · PDF1 Jul 2026View
CombinedReport_B _Be Green_2026-03-19_11-58-11. · PDF7 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View
01962-JTP-SP_08-Proposed Sitewide - Level 06 Plan-P1.pdf · PDF1 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
Appendix 9.8 Apartment PEA's Block B · PDF6 Jul 2026View
Appendix 9.8 Apartment PEA's · PDF6 Jul 2026View
CombinedReport_A _Be Lean_2026-03-19_10-16-28 · PDF7 Jul 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.