Council planning record

Rear extension measuring 4.9m and 6m in depth, with a maximum height of 3m, and 3m in height to eaves level. Notification of the construction of an extension under Class A Part 1 of Schedule 2 of the Town and Country Planning (General Permitted Development) (England) Order 2015 (amended).

70 BLENHEIM ROAD, READING, RG1 5NQ

Decision MadeReference: PL/25/0114Reading Borough Council

Last published check: 22 Oct 2026, 11:21. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received date

    Published milestoneCouncil source
  2. Valid date

    Published milestoneCouncil source
  3. Decision date

    Published milestoneCouncil source
  4. Application expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Earliest decision date

    Published milestoneCouncil source

Application summary

Status
Decision Made
Application type
Prior approval Part 1 Class A.1(ea): Larger home extension
Received
22 Jan 2025
Validated
22 Jan 2025
Determination deadline
5 Mar 2025
Local authority
Reading Borough Council

Application overview

Rear extension measuring 4.9m and 6m in depth, with a maximum height of 3m, and 3m in height to eaves level. Notification of the construction of an extension under Class A Part 1 of Schedule 2 of the Town and Country Planning (General Permitted Development) (England) Order 2015 (amended).

Proposal details

Reference
PL/25/0114
Alternative references
PP-13710024
Ward
Redlands Ward
Agent
MR PETER NICHOLSON

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

70 BLENHEIM ROAD, READING, RG1 5NQ

This record has no verified map location.

Documents 15 of 15

DocumentPublishedAction
BH.006A 1.500 BLOCK PLANAmended Plan · PDF26 Feb 2025View
BH.002 PROPOSED ELEVATIONS 1.100 ON A3.pdfPlans · PDF22 Jan 2025View
BH.003 EXISTING GROUND FLOOR PLAN 1.50 ON A2.pdfPlans · PDF22 Jan 2025View
CIL FORM.pdfCommunity infrastructure levy questions · PDF22 Jan 2025View
BH.007 1.1250 LOCATION PLAN.pdfLocation plan · PDF22 Jan 2025View
BH.007A 1.1250 LOCATION PLANAmended Plan · PDF26 Feb 2025View
BH.005 PROPOSED GROUND FLOOR PLAN PD SIZE 1.50 ON A2.pdfPlans · PDF22 Jan 2025View
BH.004A PROPOSED GROUND FLOOR PLAN 1.50 ON A2Amended Plan · PDF26 Feb 2025View
BH.004 PROPOSED GROUND FLOOR PLAN 1.50 ON A2.pdfPlans · PDF22 Jan 2025View
Delegated Report - PL_25_0114Planning Officer report · PDF4 Mar 2025View
BH.001 EXISTING ELEVATIONS 1.100 ON A3.pdfPlans · PDF22 Jan 2025View
HPA Not Required - PL_25_0114Decision Notice · PDF4 Mar 2025View
BH.006 1.500 BLOCK PLAN.pdfPlans · PDF22 Jan 2025View
BH.002A PROPOSED ELEVATIONS 1.100 ON A3Amended Plan · PDF26 Feb 2025View
ApplicationFormRedacted.pdfApplication Form · PDF22 Jan 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Prior Approval Not Required
HPA Not Required - PL_25_0114
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.