Representations should be submitted to pedw.infrastructure@gov.wales - Reference DNS CAS-01927-F0T2T1 : Up to six wind turbines (up to 39.6 MW) up to 200m to tip and associated infrastructure

1 km North of Llangurig - Banc Du, Powys

Decision MadeReference: P/26/1000/DNSPowys County Council

Last published check: 20 Oct 2026, 05:31. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received date

    Published milestoneCouncil source
  2. Validated date

    Published milestoneCouncil source
  3. Valid date

    Published milestoneCouncil source
  4. Scheduled Decision Date

    Scheduled

    Future date published by the council.

    Council source

Application summary

Status
Decision Made
Application type
Development of National Significance
Received
11 Sept 2026
Validated
11 Sept 2026
Determination deadline
Not published
Local authority
Powys County Council

Application overview

Representations should be submitted to pedw.infrastructure@gov.wales - Reference DNS CAS-01927-F0T2T1 : Up to six wind turbines (up to 39.6 MW) up to 200m to tip and associated infrastructure

Proposal details

Reference
P/26/1000/DNS
Parish
Llangurig
Agent
PEDW

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

1 km North of Llangurig - Banc Du, Powys

This record has no verified map location.

Documents 249 of 249

DocumentPublishedAction
2025-12-22 - Planning StatementSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 1-1 - Site Location PlanSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 7-8 - Historic assets included in the EIA potentially subjected to operational effectsSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-27 - VP8 Llyn Clwyedog viewpointSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 11-1 - Study AreaSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-7a - Hub Height ZTV with Viewpoints (A3)Supporting documents · PDF11 Sept 2026View
2025-04-04 - NOTIF002 - Site Location PlanSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-11a - National Landscape Designations and Blade Tip ZTVSupporting documents · PDF11 Sept 2026View
2025-12-22 - Collaborative Benefits Report Appendix 5 - Meet the Buyer_Supporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol II - Ch15 - Summary of Effects and MitigationSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-41 - VP22 Afon Bidno Valley below Pen y FoelSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol II - Ch14 - Cumulative EffectsSupporting documents · PDF11 Sept 2026View
2025-12-23 - ES Vol IV - Figure 11-2-1 - Borrow Pit Outline DesignSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 3-13 - Watercourse Crossing using Floating RoadSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-26 - VP7 Llanidloes Part 2Supporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 3-10 - Typical Access Track Cross-SectionSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-17a - Cumulative Wind Farms Within 45kmSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 11-5b-2 - Peat Survey LocationsSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 3-12 - Typical Watercourse Crossing PlanSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 11-7 - Private Water SuppliesSupporting documents · PDF11 Sept 2026View
2025-12-23 - ES Vol III - Appendix 9-1 - Survey Methodology SummarySupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-3c - Landscape Character LegendSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-15 - Principal Visual Receptors and Blade Tip ZTV_ Local Context (1)Supporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-5a - Visual ReceptorsSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol II - Ch10 - ClimateSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-39 - VP20 Minor Road Bwlch-y-pridd CommonsSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-14 - Principal Visual Receptors and Blade Tip ZTV_ Recreational RoutesSupporting documents · PDF11 Sept 2026View
2026-04-10 - ES Vol III - Appendix 8-5 - Bat Static Detector Survey Report (2024)_Supporting documents · PDF11 Sept 2026View
2025-12-23 - ES Vol III - Appendix 11-5 - Water Framework Directive AssessmentSupporting documents · PDF11 Sept 2026View
2022-07-15 - EIA Scoping Report - Figure 4.6 - Landscape Designations with Blade Tip ZTVSupporting documents · PDF11 Sept 2026View
2022-11-17 - 01927 - EIA Scoping Direction with appendixSupporting documents · PDF11 Sept 2026View
2025-12-23 - ES Vol III - Appendix 9-9 - ITP Energised Raw Flight dataSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-28 - VP9 Wye Valley near DernolSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-22 - VP3 Wye Valley walk to the west of Llangurig Part 1Supporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 12-4 - AIL Delivery RoutesSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-20 - VP1 Minor Road between valleys of River Wye and River Severn Part 1Supporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-42 - VP23 Glan y NantSupporting documents · PDF11 Sept 2026View
2022-07-15 - EIA Scoping Report - Figure 5.2 - Designated Heritage AssetsSupporting documents · PDF11 Sept 2026View
2026-01-06 - ES Vol III - Appendix 12-1 - Transport Assessment_Supporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-6b - Blade Tip ZTV with Viewpoints (A1)Supporting documents · PDF11 Sept 2026View
2022-07-15 - EIA Scoping Report - Figure 4.4 - Landscape Character AssessmentSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 3-8 - Site Entrance Arrangement PlanSupporting documents · PDF11 Sept 2026View
2025-12-23 - ES Vol III - Appendix 9-2 - Blaen y Glyn - Summary Report_Supporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 11-2 - Bedrock GeologySupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-36 - VP17 Minffordd Path Cadair IdrisSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-9 - Site Context and Blade Tip ZTVSupporting documents · PDF11 Sept 2026View
2022-07-15 - EIA Scoping Report - Figure 1.2 - Site LayoutSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-19d - CZTV_ Proposed Development with Operational and Under Construction and Consented Wind Farms (20km)Supporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 3-3 - Wind Turbine Foundation Plan and SectionSupporting documents · PDF11 Sept 2026View
Banc Du Energy Park ARWTN Statement v2Supporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-34 - VP15 Severn Way to the east of LlanwnogSupporting documents · PDF11 Sept 2026View
2026-04-10 - ES Vol III - Appendix 8-13 - Ground Level Tree Assessment ReportSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 3-2 - Wind Turbine ElevationSupporting documents · PDF11 Sept 2026View
2025-12-22 - PAC Report Appendices - Part 3_Supporting documents · PDF11 Sept 2026View
2025-12-23 - ES Vol IV - Figure 11-1-1 - Flood Risk and Watercourse Crossing LocationsSupporting documents · PDF11 Sept 2026View
2026-01-06 - Planning Obligations and Draft ConditionsSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 7-3 - Historic assets included in the EIA potentially subjected to construction effectsSupporting documents · PDF11 Sept 2026View
2022-07-15 - EIA Scoping Report - Figure 5.1 - Non-Designated Heritage AssetsSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 12-1 - Transport Assesment Study AreaSupporting documents · PDF11 Sept 2026View
2026-09-11 - EXNOTE001 - Acceptance NoticeSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 11-5b-1 - Peat Survey LocationsSupporting documents · PDF11 Sept 2026View
2025-12-23 - ES Vol III - Appendix 9-5 - Year 3 - Flight Activity Summary ReportSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-2 - LandformSupporting documents · PDF11 Sept 2026View
2026-01-06 - ES Vol IV - Figure 3-9 - Site Entrance Visibility SplaySupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 3-11 - Typical Passing Place Plan and SectionSupporting documents · PDF11 Sept 2026View
2025-12-23 - ES Vol IV - Figure 11-3-1 - Water Features SurveySupporting documents · PDF11 Sept 2026View
2026-04-10 - ES Vol II - Ch1 to 5 - Introductory ChaptersSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-1 - Site Location and Study AreaSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-19e - CZTV_ Proposed Development and Rhiwlas Wind Farm ApplicationSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-17b - Cumulative Wind Farms Within 20kmSupporting documents · PDF11 Sept 2026View
2025-12-23 - ES Vol III - Appendix 9-4 - Blaen y Glyn - Non-breeding Season 2018-19 - Ornithology Summary Report_Supporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 3-6 - Substation Compound and Control Building PlanSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 12-3 - Personal Injury Acident LocationsSupporting documents · PDF11 Sept 2026View
2025-12-22 - Turbine Summary SheetSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 7-11(a-e) - VPCH02 7573 - Church of St Curig_Supporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 3-4 - Typical Crane PadSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-12 - Landscape Designations, Landscape Character and Blade Tip ZTV (Local Context)Supporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-18 - Non-Wind Cumulative DevelopmentSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-10 - Landscape Character and Blade Tip ZTVSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-16 - Principal Visual Receptors and Blade Tip ZTV_ Site ContextSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 3-7 - Substation Compound and Control Building ElevationsSupporting documents · PDF11 Sept 2026View
2025-02-21 - Final joint Pre-Application Meeting note - Banc Du and Rhiwlas Energy ParksSupporting documents · PDF11 Sept 2026View
2025-12-23 - ES Vol III - Appendix 6-2 - LANDMAPSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol III - Appendix 13-1 - Noise Impact AssessmentSupporting documents · PDF11 Sept 2026View
2025-04-15 - NOTIF003 - Acceptance of NotificationSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-24 - VP5 Minor road near GeufronSupporting documents · PDF11 Sept 2026View
2025-12-22 - EV Vol IV - Figure 8-2 - Pine Marten Scoping PlanSupporting documents · PDF11 Sept 2026View
2022-07-15 - EIA Scoping Report - Figure 4.1 - LVIA Study AreaSupporting documents · PDF11 Sept 2026View
2022-07-15 - EIA Scoping Report - Figure 4.5 - LANDMAPSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 7-12(a-d) - VPCH03 7573 - View of Church of St CurigSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol III - Appendix 3-1 - Wind Farm Aviation Lighting and Mitigation Report_Supporting documents · PDF11 Sept 2026View
2022-07-15 - EIA Scoping ReportSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 4-1 - Alternative Site Development OptionsSupporting documents · PDF11 Sept 2026View
2026-04-10 - ES Vol II - Ch6 - Landscape and VisualSupporting documents · PDF11 Sept 2026View
2026-04-10 - Design and Access StatementSupporting documents · PDF11 Sept 2026View
2025-12-22 - PAC Report Appendices - Part 1_Supporting documents · PDF11 Sept 2026View
2025-12-23 - ES Vol III - Appendix 6-4 - AVALSupporting documents · PDF11 Sept 2026View
2025-12-23 - ES Vol III - Appendix 5-3 - Telecommunications Impact Assessment_Supporting documents · PDF11 Sept 2026View
2025-12-23 - ES Vol III - Appendix 9-3 - Blaen y Glyn - Year 2 - Ornithology Report_Supporting documents · PDF11 Sept 2026View
2025-12-22 - Collaborative Benefits Report_Supporting documents · PDF11 Sept 2026View
2025-12-23 - ES Vol III - Appendix 11-3 - Water Features SurveySupporting documents · PDF11 Sept 2026View
2026-09-11 - REPS002 - The Coal AuthoritySupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-19h - CZTV_ Proposed Development and Nant Mithil ApplicationSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-23 - VP4 A44 _ A470 junction to the south of LlangurigSupporting documents · PDF11 Sept 2026View
2026-04-10 - ES Vol III - Appendix 5-2 - Shadow Flicker Impact Assessment_Supporting documents · PDF11 Sept 2026View
2025-12-23 - ES Vol III - Appendix 8-4 - Bat Static Detector Survey Report (2022)_Supporting documents · PDF11 Sept 2026View
2022-07-15 - EIA Scoping Report - Figure 4.7 - Visual Receptors with Blade Tip ZTVSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-25 - VP6 Wye Valley NCN 8_Supporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 7-9 - Results of peat depth survey with proposed infrastructure overlaySupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-38 - VP19 March's PoolSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol III - Appendix 10-1 - Carbon Balance CalculationsSupporting documents · PDF11 Sept 2026View
2025-12-22 - EV Vol IV - Figure 8-3 - Study Area Terrestrial Ecology Study Area (Map 2_2)Supporting documents · PDF11 Sept 2026View
2025-12-23 - ES Vol III - Appendix 7-2 - Outline WSISupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 7-10(a-e) - VPCH01 MG267 - Domen Giw cairnSupporting documents · PDF11 Sept 2026View
2025-12-22 - EV Vol IV - Figure 8-7 - Illustrative Areas for Habitat EnhancementsSupporting documents · PDF11 Sept 2026View
2025-12-23 - ES Vol III - Appendix 6-2 - Figures 6-2-9 - 6-2-10Supporting documents · PDF11 Sept 2026View
2025-12-23 - ES Vol III - Appendix 9-11 - PAC CommentsSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-37 - VP18 Shepherd's Hut minor road on Banc DuSupporting documents · PDF11 Sept 2026View
2025-12-22 - Collaborative Benefits Report Appendix 4 - Bute Energy Social Value PolicySupporting documents · PDF11 Sept 2026View
2025-12-23 - ES Vol III - Appendix 8-12 - PAC CommentsSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 11-5c-1 - Peat Survey PhasesSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 11-5a - Peat Depth OverviewSupporting documents · PDF11 Sept 2026View
2022-06-08 - Pre-Application - Inception Meeting note - Banc Du and Rhiwlas Energy ParksSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 13-1 - Noise Sensitive Receptors Monitoring Positions and Turbine LayoutSupporting documents · PDF11 Sept 2026View
2025-12-22 - Socio-Economic StatementSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 11-5c-2 - Peat Survey PhasesSupporting documents · PDF11 Sept 2026View
2026-06-15 - ES Completeness Report (English)Supporting documents · PDF11 Sept 2026View
2025-12-23 - ES Vol IV - Figure 11-4-1 - Watercourse Crossing LocationsSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-19g - CZTV_ Proposed Development and Bryngydfa ApplicationSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 14-2 - Committed Wind Farms within 45km and 10kmSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 11-3 - Superficial GeologySupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-35 - VP16 Hill summit to the south of Llandrindod WellsSupporting documents · PDF11 Sept 2026View
2025-12-22 - Application Form_Supporting documents · PDF11 Sept 2026View
2025-12-23 - ES Vol III - Appendix 8-6 - Bat Tree Survey Report_Supporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol II - Ch7 - Cultural HeritageSupporting documents · PDF11 Sept 2026View
2026-04-10 - Cover Letter for DNS Application_Supporting documents · PDF11 Sept 2026View
2025-12-23 - ES Vol III - Appendix 6-5 - Cumulative DevelopmentsSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol II - Ch13 - Noise and VibrationSupporting documents · PDF11 Sept 2026View
2025-12-23 - ES Vol III - Appendix 8-11 - Ecological Survey Updates (2025)_Supporting documents · PDF11 Sept 2026View
2025-12-22 - Collaborative Benefits Report Appendix 2 - Bute Energy Community Energy Approach_Supporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-31 - VP12 Summit of Pen Pumlumon Fawr _ Cambrian WaySupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-5b - Principal Visual Receptors - Recreational RoutesSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-4b - Regional _ Local Landscape DesignationsSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-44 - VPA Shropshire Hills National landscape Clun ForestSupporting documents · PDF11 Sept 2026View
2026-09-11 - REPS001 - Office for Nuclear RegulationSupporting documents · PDF11 Sept 2026View
2022-06-08 - Pre-Application - Inception Meeting presentation slides Banc Du & RhiwlasSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 11-6 - HydrologySupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-6a - Blade Tip ZTV with Viewpoints (A3)Supporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-5c - Principal Visual Receptors - Local ContextSupporting documents · PDF11 Sept 2026View
2025-12-22 - EV Vol IV - Figure 8-5 - Bat Survey and Mitigation PlanSupporting documents · PDF11 Sept 2026View
2025-12-23 - ES Vol III - Appendix 3-5 - Grid Connection AppraisalSupporting documents · PDF11 Sept 2026View
2025-12-22 - EV Vol IV - Figure 8-3 - Study Area Terrestrial Ecology Study Area (Map 1_2)Supporting documents · PDF11 Sept 2026View
2025-12-23 - ES Vol III - Appendix 9-8 - Tabulated Summary of Breeding Bird Survey Results_Supporting documents · PDF11 Sept 2026View
2022-07-15 - EIA Scoping Report - Figure 11.1 - Noise Contour PlanSupporting documents · PDF11 Sept 2026View
2022-07-15 - EIA Scoping Report - Figure 1.3 - Constraints MapSupporting documents · PDF11 Sept 2026View
2025-12-22 - Collaborative Benefits Report Appendix 3 - Community Investment Strategy_Supporting documents · PDF11 Sept 2026View
2025-12-22 - Cover Letter for DNS Application & Enclosed Docs_Supporting documents · PDF11 Sept 2026View
2025-12-22 - PAC ReportSupporting documents · PDF11 Sept 2026View
2022-07-15 - EIA Scoping Report - Cover letterSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 14-1 - Committed Wind Farms within 45kmSupporting documents · PDF11 Sept 2026View
2026-04-10 - ES Vol III - Appendix 8-1 - Preliminary Ecological Appraisal_Supporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 3-5 - Typical Cable Trench & Track Crossing Cross-SectionSupporting documents · PDF11 Sept 2026View
2025-10-24 - Pre-App Advice Draft ES Check - Banc Du Energy ParkSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-43 - VP24 Wye Valley WalkSupporting documents · PDF11 Sept 2026View
2025-12-22 - Collaborative Benefits Report Appendix 6 - Future Skills Strategy_Supporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-19a - CZTV_ Proposed Development with Operational and Under Construction Wind Farms (45km)Supporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-13 - Principal Visual Receptors and Blade Tip ZTV_ Transport Routes _ SettlementsSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 7-2 - Historic assets included in the EIA potentially subjected to construction effectsSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-4a - National Landscape DesignationsSupporting documents · PDF11 Sept 2026View
2025-12-12 - Habitat Regulations Assessment_Supporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-15 - Principal Visual Receptors and Blade Tip ZTV_ Local ContextSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-19f - CZTV_ Proposed Development and Esgair Cwmowen ApplicationSupporting documents · PDF11 Sept 2026View
2025-12-23 - ES Vol III - Appendix 8-7 - Otter and Water Vole Survey Report_Supporting documents · PDF11 Sept 2026View
2025-12-22 - Site Location PlanSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol III - Appendix 3-3 - Outline CEMP_Supporting documents · PDF11 Sept 2026View
2026-04-10 - ES Vol III - Appendix 5-1 - Matters scoped in or out of EIA and where they are addressed in the ESSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-20 - VP1 Minor Road between valleys of River Wye and River Severn Part 3Supporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol III - Appendix 1-1 - EIA Scoping ReportSupporting documents · PDF11 Sept 2026View
2025-12-23 - ES Vol III - Appendix 3-4 - Arboricultural Impact AssessmentSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol III - Appendix 1-2 - EIA Scoping DirectionSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 3-1 - Development Layout PlanSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-32 - VP13 Esgair PenygarregSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol III - Appendix 3-2 - Aviation Technical Report_Supporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-20 - VP1 Minor Road between valleys of River Wye and River Severn Part 2Supporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-30 - VP11 Penycrocbren on Glyndwr's Way _ Cambrian WaySupporting documents · PDF11 Sept 2026View
2026-04-10 - ES Vol II - Ch8 - Terrestrial Ecology_Supporting documents · PDF11 Sept 2026View
2025-12-22 - EV Vol IV - Figure 8-4 - Phase 1 Habitat MapSupporting documents · PDF11 Sept 2026View
2026-04-10 - ES Vol III - Appendix 6-3 - RVAASupporting documents · PDF11 Sept 2026View
2025-12-23 - ES Vol III - Appendix 8-8 - Great Crested Newt eDNA Survey Report_Supporting documents · PDF11 Sept 2026View
2026-04-10 - ES Vol III - Appendix 8-10 - Outline HMP & NBBR_Supporting documents · PDF11 Sept 2026View
2026-06-15 - ES Completeness Report (Cymraeg)Supporting documents · PDF11 Sept 2026View
2025-12-23 - ES Vol III - Appendix 11-1 - Flood Consequence AssessmentSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 1-2 - Site Boundary PlanSupporting documents · PDF11 Sept 2026View
2022-07-15 - EIA Scoping Report - Figure 4.2 - Cumulative Wind FarmsSupporting documents · PDF11 Sept 2026View
2025-12-23 - ES Vol III - Appendix 11-8 - Outline Soil Management PlanSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-19b - CZTV_ Proposed Development with Operational and Under Construction Wind Farms (20km)Supporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 9-1 - Terrestrial Ecology and OrnithologySupporting documents · PDF11 Sept 2026View
2025-12-23 - ES Vol III - Appendix 7-1 - Archaelogical DBASupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 11-4 - Soils and PeatSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-26 - VP7 Llanidloes Part 1Supporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 7-7 - Historic assets included in the EIA potentially subjected to construction effectsSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 7-1 - Historic assets included in the EIA potentially subjected to construction effectsSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-21 - VP2 Llangurig_Supporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol II - Ch9 - OrnithologySupporting documents · PDF11 Sept 2026View
2025-12-23 - ES Vol III - Appendix 9-10 - Updated Breeding Bird Surveys_Supporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-22 - VP3 Wye Valley walk to the west of Llangurig Part 2Supporting documents · PDF11 Sept 2026View
2025-12-22 - PAC Report Appendices - Part 2_Supporting documents · PDF11 Sept 2026View
2025-02-17 - Joint Pre-Application Advice Request Form - Banc Du and Rhiwlas Energy ParksSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-3a - National Landscape CharacterSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-40 - VP21 Pen y Gaer CampSupporting documents · PDF11 Sept 2026View
2025-12-23 - ES Vol III - Appendix 9-6 - Collision Risk Assessment & Modelling ReportSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol III - Appendix 14-1 - Cumulative Long List October 2025Supporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol II - Ch12 - Traffic and TransportSupporting documents · PDF11 Sept 2026View
2025-12-23 - ES Vol III - Appendix 11-7 - Drainage StatementSupporting documents · PDF11 Sept 2026View
2026-04-10 - ES Vol II - Ch11 - Land Soils and WaterSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 2-1 - Environmental Constraints PlanSupporting documents · PDF11 Sept 2026View
2026-08-13 - ES Vol I - Non-technical Summary - WelshSupporting documents · PDF11 Sept 2026View
2022-07-15 - EIA Scoping Report - Figure 4.3 - Blade Tip ZTV with ViewpointsSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-3b - Landscape CharacterSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-5d - Visual Receptors SiteSupporting documents · PDF11 Sept 2026View
2026-04-10 - ES Vol I - Non-technical SummarySupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-19c - CZTV_ Proposed Development with Operational and Under Construction and Consented Wind Farms (45km)Supporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-8 - Horizontal Angle Blade Tip ZTVSupporting documents · PDF11 Sept 2026View
2025-12-23 - ES Vol III - Appendix 6-1 - LVIA MethodologySupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 12-2 - Traffic Court LocationsSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 7-4 - Historic assets included in the EIA potentially subjected to construction effectsSupporting documents · PDF11 Sept 2026View
2026-04-10 - ES Vol III - Appendix 11-6 - PAC CommentsSupporting documents · PDF11 Sept 2026View
2025-12-23 - ES Vol III - Appendix 11-2 - Borrow Pit AssessmentSupporting documents · PDF11 Sept 2026View
2025-12-23 - ES Vol III - Appendix 11-4 - Watercourse Crossing ScheduleSupporting documents · PDF11 Sept 2026View
2026-04-10 - Green Infrastructure StatementSupporting documents · PDF11 Sept 2026View
2025-12-23 - ES Vol III - Appendix 8-2 - Preliminary Ecological Appraisal - AIL Routes_Supporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-7b - Hub Height ZTV with Viewpoints (A1)Supporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 9-2 - View-shed Analysis (500m)Supporting documents · PDF11 Sept 2026View
2025-12-22 - Development Layout PlanSupporting documents · PDF11 Sept 2026View
2025-12-22 - EV Vol IV - Figure 8-6 - Terrestrial Ecology Sensitive ReceptorsSupporting documents · PDF11 Sept 2026View
2025-12-23 - ES Vol III - Appendix 8-9 - Reptile Survey Report_Supporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-33 - VP14 Moel Hywel hill summitSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-11b - Regional _ Local Landscape Designations and Blade Tip ZTVSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 7-6 - Historic assets included in the EIA potentially subjected to construction effectsSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol III - Appendix 2-1 - AIL Route Environmental Review CONFIDENTIALSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 3-14 - Main Construction Compound and Laydown Area PlanSupporting documents · PDF11 Sept 2026View
2025-04-08 - NOTIF001 - Notification FormSupporting documents · PDF11 Sept 2026View
2022-07-15 - EIA Scoping Report - Figure 1.1 - Site LocationSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 8-1 - Abnormal Indivisible Load RoutesSupporting documents · PDF11 Sept 2026View
2025-05-19 - Pre-application services request formSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 9-3 - View-shed Analysis (2km)Supporting documents · PDF11 Sept 2026View
2025-12-23 - ES Vol III - Appendix 9-7 - Tabulated Summary of Winter Walkover Survey ResultsSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 7-5 - Historic assets included in the EIA potentially subjected to construction effectsSupporting documents · PDF11 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-29 - VP10 Glyndwr's Way_open access land to the west of Waun DbubarthogSupporting documents · PDF11 Sept 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Closed
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.