Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
1 km North of Llangurig - Banc Du, Powys
Last published check: 20 Oct 2026, 05:31. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
Representations should be submitted to pedw.infrastructure@gov.wales - Reference DNS CAS-01927-F0T2T1 : Up to six wind turbines (up to 39.6 MW) up to 200m to tip and associated infrastructure
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details1 km North of Llangurig - Banc Du, Powys
This record has no verified map location.
| Document | Published | Action |
|---|---|---|
| 2025-12-22 - Planning StatementSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 1-1 - Site Location PlanSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 7-8 - Historic assets included in the EIA potentially subjected to operational effectsSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-27 - VP8 Llyn Clwyedog viewpointSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 11-1 - Study AreaSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-7a - Hub Height ZTV with Viewpoints (A3)Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-04-04 - NOTIF002 - Site Location PlanSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-11a - National Landscape Designations and Blade Tip ZTVSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - Collaborative Benefits Report Appendix 5 - Meet the Buyer_Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol II - Ch15 - Summary of Effects and MitigationSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-41 - VP22 Afon Bidno Valley below Pen y FoelSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol II - Ch14 - Cumulative EffectsSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-23 - ES Vol IV - Figure 11-2-1 - Borrow Pit Outline DesignSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 3-13 - Watercourse Crossing using Floating RoadSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-26 - VP7 Llanidloes Part 2Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 3-10 - Typical Access Track Cross-SectionSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-17a - Cumulative Wind Farms Within 45kmSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 11-5b-2 - Peat Survey LocationsSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 3-12 - Typical Watercourse Crossing PlanSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 11-7 - Private Water SuppliesSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-23 - ES Vol III - Appendix 9-1 - Survey Methodology SummarySupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-3c - Landscape Character LegendSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-15 - Principal Visual Receptors and Blade Tip ZTV_ Local Context (1)Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-5a - Visual ReceptorsSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol II - Ch10 - ClimateSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-39 - VP20 Minor Road Bwlch-y-pridd CommonsSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-14 - Principal Visual Receptors and Blade Tip ZTV_ Recreational RoutesSupporting documents · PDF | 11 Sept 2026 | View |
| 2026-04-10 - ES Vol III - Appendix 8-5 - Bat Static Detector Survey Report (2024)_Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-23 - ES Vol III - Appendix 11-5 - Water Framework Directive AssessmentSupporting documents · PDF | 11 Sept 2026 | View |
| 2022-07-15 - EIA Scoping Report - Figure 4.6 - Landscape Designations with Blade Tip ZTVSupporting documents · PDF | 11 Sept 2026 | View |
| 2022-11-17 - 01927 - EIA Scoping Direction with appendixSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-23 - ES Vol III - Appendix 9-9 - ITP Energised Raw Flight dataSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-28 - VP9 Wye Valley near DernolSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-22 - VP3 Wye Valley walk to the west of Llangurig Part 1Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 12-4 - AIL Delivery RoutesSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-20 - VP1 Minor Road between valleys of River Wye and River Severn Part 1Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-42 - VP23 Glan y NantSupporting documents · PDF | 11 Sept 2026 | View |
| 2022-07-15 - EIA Scoping Report - Figure 5.2 - Designated Heritage AssetsSupporting documents · PDF | 11 Sept 2026 | View |
| 2026-01-06 - ES Vol III - Appendix 12-1 - Transport Assessment_Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-6b - Blade Tip ZTV with Viewpoints (A1)Supporting documents · PDF | 11 Sept 2026 | View |
| 2022-07-15 - EIA Scoping Report - Figure 4.4 - Landscape Character AssessmentSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 3-8 - Site Entrance Arrangement PlanSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-23 - ES Vol III - Appendix 9-2 - Blaen y Glyn - Summary Report_Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 11-2 - Bedrock GeologySupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-36 - VP17 Minffordd Path Cadair IdrisSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-9 - Site Context and Blade Tip ZTVSupporting documents · PDF | 11 Sept 2026 | View |
| 2022-07-15 - EIA Scoping Report - Figure 1.2 - Site LayoutSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-19d - CZTV_ Proposed Development with Operational and Under Construction and Consented Wind Farms (20km)Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 3-3 - Wind Turbine Foundation Plan and SectionSupporting documents · PDF | 11 Sept 2026 | View |
| Banc Du Energy Park ARWTN Statement v2Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-34 - VP15 Severn Way to the east of LlanwnogSupporting documents · PDF | 11 Sept 2026 | View |
| 2026-04-10 - ES Vol III - Appendix 8-13 - Ground Level Tree Assessment ReportSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 3-2 - Wind Turbine ElevationSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - PAC Report Appendices - Part 3_Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-23 - ES Vol IV - Figure 11-1-1 - Flood Risk and Watercourse Crossing LocationsSupporting documents · PDF | 11 Sept 2026 | View |
| 2026-01-06 - Planning Obligations and Draft ConditionsSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 7-3 - Historic assets included in the EIA potentially subjected to construction effectsSupporting documents · PDF | 11 Sept 2026 | View |
| 2022-07-15 - EIA Scoping Report - Figure 5.1 - Non-Designated Heritage AssetsSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 12-1 - Transport Assesment Study AreaSupporting documents · PDF | 11 Sept 2026 | View |
| 2026-09-11 - EXNOTE001 - Acceptance NoticeSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 11-5b-1 - Peat Survey LocationsSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-23 - ES Vol III - Appendix 9-5 - Year 3 - Flight Activity Summary ReportSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-2 - LandformSupporting documents · PDF | 11 Sept 2026 | View |
| 2026-01-06 - ES Vol IV - Figure 3-9 - Site Entrance Visibility SplaySupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 3-11 - Typical Passing Place Plan and SectionSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-23 - ES Vol IV - Figure 11-3-1 - Water Features SurveySupporting documents · PDF | 11 Sept 2026 | View |
| 2026-04-10 - ES Vol II - Ch1 to 5 - Introductory ChaptersSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-1 - Site Location and Study AreaSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-19e - CZTV_ Proposed Development and Rhiwlas Wind Farm ApplicationSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-17b - Cumulative Wind Farms Within 20kmSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-23 - ES Vol III - Appendix 9-4 - Blaen y Glyn - Non-breeding Season 2018-19 - Ornithology Summary Report_Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 3-6 - Substation Compound and Control Building PlanSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 12-3 - Personal Injury Acident LocationsSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - Turbine Summary SheetSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 7-11(a-e) - VPCH02 7573 - Church of St Curig_Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 3-4 - Typical Crane PadSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-12 - Landscape Designations, Landscape Character and Blade Tip ZTV (Local Context)Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-18 - Non-Wind Cumulative DevelopmentSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-10 - Landscape Character and Blade Tip ZTVSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-16 - Principal Visual Receptors and Blade Tip ZTV_ Site ContextSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 3-7 - Substation Compound and Control Building ElevationsSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-02-21 - Final joint Pre-Application Meeting note - Banc Du and Rhiwlas Energy ParksSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-23 - ES Vol III - Appendix 6-2 - LANDMAPSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol III - Appendix 13-1 - Noise Impact AssessmentSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-04-15 - NOTIF003 - Acceptance of NotificationSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-24 - VP5 Minor road near GeufronSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - EV Vol IV - Figure 8-2 - Pine Marten Scoping PlanSupporting documents · PDF | 11 Sept 2026 | View |
| 2022-07-15 - EIA Scoping Report - Figure 4.1 - LVIA Study AreaSupporting documents · PDF | 11 Sept 2026 | View |
| 2022-07-15 - EIA Scoping Report - Figure 4.5 - LANDMAPSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 7-12(a-d) - VPCH03 7573 - View of Church of St CurigSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol III - Appendix 3-1 - Wind Farm Aviation Lighting and Mitigation Report_Supporting documents · PDF | 11 Sept 2026 | View |
| 2022-07-15 - EIA Scoping ReportSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 4-1 - Alternative Site Development OptionsSupporting documents · PDF | 11 Sept 2026 | View |
| 2026-04-10 - ES Vol II - Ch6 - Landscape and VisualSupporting documents · PDF | 11 Sept 2026 | View |
| 2026-04-10 - Design and Access StatementSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - PAC Report Appendices - Part 1_Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-23 - ES Vol III - Appendix 6-4 - AVALSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-23 - ES Vol III - Appendix 5-3 - Telecommunications Impact Assessment_Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-23 - ES Vol III - Appendix 9-3 - Blaen y Glyn - Year 2 - Ornithology Report_Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - Collaborative Benefits Report_Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-23 - ES Vol III - Appendix 11-3 - Water Features SurveySupporting documents · PDF | 11 Sept 2026 | View |
| 2026-09-11 - REPS002 - The Coal AuthoritySupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-19h - CZTV_ Proposed Development and Nant Mithil ApplicationSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-23 - VP4 A44 _ A470 junction to the south of LlangurigSupporting documents · PDF | 11 Sept 2026 | View |
| 2026-04-10 - ES Vol III - Appendix 5-2 - Shadow Flicker Impact Assessment_Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-23 - ES Vol III - Appendix 8-4 - Bat Static Detector Survey Report (2022)_Supporting documents · PDF | 11 Sept 2026 | View |
| 2022-07-15 - EIA Scoping Report - Figure 4.7 - Visual Receptors with Blade Tip ZTVSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-25 - VP6 Wye Valley NCN 8_Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 7-9 - Results of peat depth survey with proposed infrastructure overlaySupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-38 - VP19 March's PoolSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol III - Appendix 10-1 - Carbon Balance CalculationsSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - EV Vol IV - Figure 8-3 - Study Area Terrestrial Ecology Study Area (Map 2_2)Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-23 - ES Vol III - Appendix 7-2 - Outline WSISupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 7-10(a-e) - VPCH01 MG267 - Domen Giw cairnSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - EV Vol IV - Figure 8-7 - Illustrative Areas for Habitat EnhancementsSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-23 - ES Vol III - Appendix 6-2 - Figures 6-2-9 - 6-2-10Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-23 - ES Vol III - Appendix 9-11 - PAC CommentsSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-37 - VP18 Shepherd's Hut minor road on Banc DuSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - Collaborative Benefits Report Appendix 4 - Bute Energy Social Value PolicySupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-23 - ES Vol III - Appendix 8-12 - PAC CommentsSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 11-5c-1 - Peat Survey PhasesSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 11-5a - Peat Depth OverviewSupporting documents · PDF | 11 Sept 2026 | View |
| 2022-06-08 - Pre-Application - Inception Meeting note - Banc Du and Rhiwlas Energy ParksSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 13-1 - Noise Sensitive Receptors Monitoring Positions and Turbine LayoutSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - Socio-Economic StatementSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 11-5c-2 - Peat Survey PhasesSupporting documents · PDF | 11 Sept 2026 | View |
| 2026-06-15 - ES Completeness Report (English)Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-23 - ES Vol IV - Figure 11-4-1 - Watercourse Crossing LocationsSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-19g - CZTV_ Proposed Development and Bryngydfa ApplicationSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 14-2 - Committed Wind Farms within 45km and 10kmSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 11-3 - Superficial GeologySupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-35 - VP16 Hill summit to the south of Llandrindod WellsSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - Application Form_Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-23 - ES Vol III - Appendix 8-6 - Bat Tree Survey Report_Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol II - Ch7 - Cultural HeritageSupporting documents · PDF | 11 Sept 2026 | View |
| 2026-04-10 - Cover Letter for DNS Application_Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-23 - ES Vol III - Appendix 6-5 - Cumulative DevelopmentsSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol II - Ch13 - Noise and VibrationSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-23 - ES Vol III - Appendix 8-11 - Ecological Survey Updates (2025)_Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - Collaborative Benefits Report Appendix 2 - Bute Energy Community Energy Approach_Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-31 - VP12 Summit of Pen Pumlumon Fawr _ Cambrian WaySupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-5b - Principal Visual Receptors - Recreational RoutesSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-4b - Regional _ Local Landscape DesignationsSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-44 - VPA Shropshire Hills National landscape Clun ForestSupporting documents · PDF | 11 Sept 2026 | View |
| 2026-09-11 - REPS001 - Office for Nuclear RegulationSupporting documents · PDF | 11 Sept 2026 | View |
| 2022-06-08 - Pre-Application - Inception Meeting presentation slides Banc Du & RhiwlasSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 11-6 - HydrologySupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-6a - Blade Tip ZTV with Viewpoints (A3)Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-5c - Principal Visual Receptors - Local ContextSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - EV Vol IV - Figure 8-5 - Bat Survey and Mitigation PlanSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-23 - ES Vol III - Appendix 3-5 - Grid Connection AppraisalSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - EV Vol IV - Figure 8-3 - Study Area Terrestrial Ecology Study Area (Map 1_2)Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-23 - ES Vol III - Appendix 9-8 - Tabulated Summary of Breeding Bird Survey Results_Supporting documents · PDF | 11 Sept 2026 | View |
| 2022-07-15 - EIA Scoping Report - Figure 11.1 - Noise Contour PlanSupporting documents · PDF | 11 Sept 2026 | View |
| 2022-07-15 - EIA Scoping Report - Figure 1.3 - Constraints MapSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - Collaborative Benefits Report Appendix 3 - Community Investment Strategy_Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - Cover Letter for DNS Application & Enclosed Docs_Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - PAC ReportSupporting documents · PDF | 11 Sept 2026 | View |
| 2022-07-15 - EIA Scoping Report - Cover letterSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 14-1 - Committed Wind Farms within 45kmSupporting documents · PDF | 11 Sept 2026 | View |
| 2026-04-10 - ES Vol III - Appendix 8-1 - Preliminary Ecological Appraisal_Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 3-5 - Typical Cable Trench & Track Crossing Cross-SectionSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-10-24 - Pre-App Advice Draft ES Check - Banc Du Energy ParkSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-43 - VP24 Wye Valley WalkSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - Collaborative Benefits Report Appendix 6 - Future Skills Strategy_Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-19a - CZTV_ Proposed Development with Operational and Under Construction Wind Farms (45km)Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-13 - Principal Visual Receptors and Blade Tip ZTV_ Transport Routes _ SettlementsSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 7-2 - Historic assets included in the EIA potentially subjected to construction effectsSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-4a - National Landscape DesignationsSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-12 - Habitat Regulations Assessment_Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-15 - Principal Visual Receptors and Blade Tip ZTV_ Local ContextSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-19f - CZTV_ Proposed Development and Esgair Cwmowen ApplicationSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-23 - ES Vol III - Appendix 8-7 - Otter and Water Vole Survey Report_Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - Site Location PlanSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol III - Appendix 3-3 - Outline CEMP_Supporting documents · PDF | 11 Sept 2026 | View |
| 2026-04-10 - ES Vol III - Appendix 5-1 - Matters scoped in or out of EIA and where they are addressed in the ESSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-20 - VP1 Minor Road between valleys of River Wye and River Severn Part 3Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol III - Appendix 1-1 - EIA Scoping ReportSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-23 - ES Vol III - Appendix 3-4 - Arboricultural Impact AssessmentSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol III - Appendix 1-2 - EIA Scoping DirectionSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 3-1 - Development Layout PlanSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-32 - VP13 Esgair PenygarregSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol III - Appendix 3-2 - Aviation Technical Report_Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-20 - VP1 Minor Road between valleys of River Wye and River Severn Part 2Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-30 - VP11 Penycrocbren on Glyndwr's Way _ Cambrian WaySupporting documents · PDF | 11 Sept 2026 | View |
| 2026-04-10 - ES Vol II - Ch8 - Terrestrial Ecology_Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - EV Vol IV - Figure 8-4 - Phase 1 Habitat MapSupporting documents · PDF | 11 Sept 2026 | View |
| 2026-04-10 - ES Vol III - Appendix 6-3 - RVAASupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-23 - ES Vol III - Appendix 8-8 - Great Crested Newt eDNA Survey Report_Supporting documents · PDF | 11 Sept 2026 | View |
| 2026-04-10 - ES Vol III - Appendix 8-10 - Outline HMP & NBBR_Supporting documents · PDF | 11 Sept 2026 | View |
| 2026-06-15 - ES Completeness Report (Cymraeg)Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-23 - ES Vol III - Appendix 11-1 - Flood Consequence AssessmentSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 1-2 - Site Boundary PlanSupporting documents · PDF | 11 Sept 2026 | View |
| 2022-07-15 - EIA Scoping Report - Figure 4.2 - Cumulative Wind FarmsSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-23 - ES Vol III - Appendix 11-8 - Outline Soil Management PlanSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-19b - CZTV_ Proposed Development with Operational and Under Construction Wind Farms (20km)Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 9-1 - Terrestrial Ecology and OrnithologySupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-23 - ES Vol III - Appendix 7-1 - Archaelogical DBASupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 11-4 - Soils and PeatSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-26 - VP7 Llanidloes Part 1Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 7-7 - Historic assets included in the EIA potentially subjected to construction effectsSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 7-1 - Historic assets included in the EIA potentially subjected to construction effectsSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-21 - VP2 Llangurig_Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol II - Ch9 - OrnithologySupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-23 - ES Vol III - Appendix 9-10 - Updated Breeding Bird Surveys_Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-22 - VP3 Wye Valley walk to the west of Llangurig Part 2Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - PAC Report Appendices - Part 2_Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-02-17 - Joint Pre-Application Advice Request Form - Banc Du and Rhiwlas Energy ParksSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-3a - National Landscape CharacterSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-40 - VP21 Pen y Gaer CampSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-23 - ES Vol III - Appendix 9-6 - Collision Risk Assessment & Modelling ReportSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol III - Appendix 14-1 - Cumulative Long List October 2025Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol II - Ch12 - Traffic and TransportSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-23 - ES Vol III - Appendix 11-7 - Drainage StatementSupporting documents · PDF | 11 Sept 2026 | View |
| 2026-04-10 - ES Vol II - Ch11 - Land Soils and WaterSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 2-1 - Environmental Constraints PlanSupporting documents · PDF | 11 Sept 2026 | View |
| 2026-08-13 - ES Vol I - Non-technical Summary - WelshSupporting documents · PDF | 11 Sept 2026 | View |
| 2022-07-15 - EIA Scoping Report - Figure 4.3 - Blade Tip ZTV with ViewpointsSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-3b - Landscape CharacterSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-5d - Visual Receptors SiteSupporting documents · PDF | 11 Sept 2026 | View |
| 2026-04-10 - ES Vol I - Non-technical SummarySupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-19c - CZTV_ Proposed Development with Operational and Under Construction and Consented Wind Farms (45km)Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-8 - Horizontal Angle Blade Tip ZTVSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-23 - ES Vol III - Appendix 6-1 - LVIA MethodologySupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 12-2 - Traffic Court LocationsSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 7-4 - Historic assets included in the EIA potentially subjected to construction effectsSupporting documents · PDF | 11 Sept 2026 | View |
| 2026-04-10 - ES Vol III - Appendix 11-6 - PAC CommentsSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-23 - ES Vol III - Appendix 11-2 - Borrow Pit AssessmentSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-23 - ES Vol III - Appendix 11-4 - Watercourse Crossing ScheduleSupporting documents · PDF | 11 Sept 2026 | View |
| 2026-04-10 - Green Infrastructure StatementSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-23 - ES Vol III - Appendix 8-2 - Preliminary Ecological Appraisal - AIL Routes_Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-7b - Hub Height ZTV with Viewpoints (A1)Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 9-2 - View-shed Analysis (500m)Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - Development Layout PlanSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - EV Vol IV - Figure 8-6 - Terrestrial Ecology Sensitive ReceptorsSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-23 - ES Vol III - Appendix 8-9 - Reptile Survey Report_Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-33 - VP14 Moel Hywel hill summitSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-11b - Regional _ Local Landscape Designations and Blade Tip ZTVSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 7-6 - Historic assets included in the EIA potentially subjected to construction effectsSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol III - Appendix 2-1 - AIL Route Environmental Review CONFIDENTIALSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 3-14 - Main Construction Compound and Laydown Area PlanSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-04-08 - NOTIF001 - Notification FormSupporting documents · PDF | 11 Sept 2026 | View |
| 2022-07-15 - EIA Scoping Report - Figure 1.1 - Site LocationSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 8-1 - Abnormal Indivisible Load RoutesSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-05-19 - Pre-application services request formSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 9-3 - View-shed Analysis (2km)Supporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-23 - ES Vol III - Appendix 9-7 - Tabulated Summary of Winter Walkover Survey ResultsSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 7-5 - Historic assets included in the EIA potentially subjected to construction effectsSupporting documents · PDF | 11 Sept 2026 | View |
| 2025-12-22 - ES Vol IV - Figure 6-29 - VP10 Glyndwr's Way_open access land to the west of Waun DbubarthogSupporting documents · PDF | 11 Sept 2026 | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
No related records were published in this section.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.