Council planning record

Representations should be submitted to pedw.infrastructure@gov.wales - Reference DNS CAS-01928-W3M9S8 : Construction and operation of up to 13 wind turbines, a substation and associated infrastructure

Land approximately 1.3km to the southeast of Llangurig - Rhiwlas, Powys

ValidReference: P/26/0857/DNSPowys County Council

Last published check: 13 Oct 2026, 06:40. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received date

    Published milestoneCouncil source
  2. Valid date

    Published milestoneCouncil source
  3. Validated date

    Published milestoneCouncil source
  4. Scheduled Decision Date

    Scheduled

    Future date published by the council.

    Council source

Application summary

Status
Valid
Application type
Development of National Significance
Received
17 Aug 2026
Validated
17 Aug 2026
Determination deadline
Not published
Local authority
Powys County Council

Application overview

Representations should be submitted to pedw.infrastructure@gov.wales - Reference DNS CAS-01928-W3M9S8 : Construction and operation of up to 13 wind turbines, a substation and associated infrastructure

Proposal details

Reference
P/26/0857/DNS
Agent
Cathryn Tracey

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Land approximately 1.3km to the southeast of Llangurig - Rhiwlas, Powys

This record has no verified map location.

Documents 228 of 228

DocumentPublishedAction
2025-12-22 - ES Vol IV - Figure 8-2 - Terrestrial Ecology Sensitive ReceptorsSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-18 - Non-Wind Cumulative DevelopmentSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol II - Ch15 Summary of Effects and MitigationSupporting documents · PDF18 Aug 2026View
2025-12-23 - ES Vol III - Appendix 7-1 - Cultural Heritage Desk-Based AssessmentSupporting documents · PDF18 Aug 2026View
2026-01-27 - ES Completeness Report (Welsh)Supporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol III - Appendix 8-2 - Great Crested Newt eDNA Survey Report_Supporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 11-7 - Private Water SuppliesSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-4a - National Landscape DesignationsSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-27(a-h) - VP8 - Moel Hywel hill summitSupporting documents · PDF18 Aug 2026View
2022-07-15 - EIA Scoping Report - Figure 4.1 - LVIA Study AreaSupporting documents · PDF18 Aug 2026View
2025-12-23 - ES Vol III - Appendix 13-1 - Noise Impact AssessmentSupporting documents · PDF18 Aug 2026View
2026-05-14 - ES Completeness Report (English)Supporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-25(h-m) - VP6 - Llanidloes (Part 2)Supporting documents · PDF18 Aug 2026View
2022-07-15 - EIA Scoping Report - Figure 1.1 - Site LocationSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 7-1 - Historic Assets within the Site Overlay with Proposed InfrastructureSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-32(a-g) - VP13 - Penycrocbren on Glyndwr's Way _ Cambrian WaySupporting documents · PDF18 Aug 2026View
2022-07-15 - EIA Scoping Report - Figure 4.7 - Visual Receptors with Blade Tip ZTVSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-5a - Principal Visual Receptors - Transport Route _ SettlementsSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 3-2 - Wind Turbine ElevationSupporting documents · PDF18 Aug 2026View
2026-04-16 - ES Vol III - Appendix 8-13 - Ground Level Tree Assessment ReportSupporting documents · PDF18 Aug 2026View
2025-12-23- ES Vol III - Appendix 7-2 - Outline Written Scheme of InvestigationSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 2-1 - Environmental Constraints PlanSupporting documents · PDF18 Aug 2026View
2026-04-16 - ES Vol II - Ch8 Terrestrial Ecology (Rev1)_Supporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 9-3 - View-shed Analysis (2 km)Supporting documents · PDF18 Aug 2026View
2025-12-22 - Cover Letter and Enclosed Docs_Supporting documents · PDF18 Aug 2026View
2025-12-23 - ES Vol III - Appendix 8-9 - PEA Report_Supporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-5c - Principal Visual Receptors - Local ContextSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 8-3 - Terrestrial Ecology Study Area (Map 1 of 2)Supporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-6b - Blade Tip ZTV with Viewpoints (A1)Supporting documents · PDF18 Aug 2026View
2025-12-23 - ES Vol III - Appendix 11-3 - Water Features SurveySupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 3-12 - Typical Watercourse Crossing PlanSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 3-6 - Substation Compound and Control Building PlanSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-14 - Principal Visual Receptors and Blade Tip ZTV_ Recreational RoutesSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 14-1 - Committed Wind Farms within 45 kmSupporting documents · PDF18 Aug 2026View
2025-02-21 - Final joint Pre-Application Meeting note - Banc Du and Rhiwlas Energy ParksSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-4b - Regional _ Local Landscape DesignationsSupporting documents · PDF18 Aug 2026View
2025-04-14 - NOTIFF003 - Acceptance of NotificationSupporting documents · PDF18 Aug 2026View
2025-12-23 - ES Vol III - Appendix 3-3 - Outline CEMP_Supporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 4-1a - Alternative Site Development OptionsSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-10 - Landscape Character and Blade Tip ZTVSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-21(a-e) - VP2 - A470Supporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 3-5 - Typical Cable Trench & Track Crossing Cross-SectionSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-3b - Landscape CharacterSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 1-2 - Site Boundary PlanSupporting documents · PDF18 Aug 2026View
2026-04-16 - Design and Access Statement (Rev1)Supporting documents · PDF18 Aug 2026View
2025-12-22 - Collaborative Benefits Report Appendix 5 - Meet the BuyerSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 11-2 - Bedrock GeologySupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-39(a-h) - VP20 - Pen y Gaer CampSupporting documents · PDF18 Aug 2026View
2025-12-22 - PAC ReportSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-30(a-g) - VP11 - Esgair PenygarregSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol II - Ch 12 Traffic and TransportSupporting documents · PDF18 Aug 2026View
2026-04-16 - ES Vol I - Non-technical Summary (Rev1)Supporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-3a - National Landscape CharacterSupporting documents · PDF18 Aug 2026View
2025-12-23 - ES Vol III - Appendix 6-4 - VAVALSupporting documents · PDF18 Aug 2026View
2022-06-08 - Pre- Application - Inception meeting Presentation slides Banc Du & RhiwlasSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-22(a-h) - VP3 - Llangurig_Supporting documents · PDF18 Aug 2026View
2026-04-16 - ES Vol II - Ch1 to 5 Introductory Chapters (Rev1)Supporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 3-1 - Development Layout PlanSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 8-6 - 2024 Bat Survey and Mitigation PlanSupporting documents · PDF18 Aug 2026View
2026-04-16 - ES Vol III - Appendix 3-6 - Outline Decommissioning PlanSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-20(a-h) - VP1 - Wye Valley NCN 8Supporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-5d - Principal Visual Receptors - Site ContextSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-37(a-f) - VP18 - Afon Dulas Valley to the west of B4518Supporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 3-8 - Site Entrance Arrangement PlanSupporting documents · PDF18 Aug 2026View
2025-04-04 - NOTIFF002 - Site Location PlanSupporting documents · PDF18 Aug 2026View
2026-01-06 - ES Vol III - Appendix 6-3 (incl Figures 6.44-6.94) - RVAASupporting documents · PDF18 Aug 2026View
2026-04-16 - ES Vol III - Appendix 5-2 - Shadow Flicker Impact Assessment (Rev1)_Supporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 7-6 - VPCH03 84289 ClochfaenSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 3-3 - Wind Turbine Foundation Plan and SectionSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol III - Appendix 8-3 - Reptile Survey Report_Supporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-7a - Hub Height ZTV with Viewpoints (A3)Supporting documents · PDF18 Aug 2026View
2025-12-23 - ES Vol III - Appendix 8-5 - 2022 Bat Static Detector Survey Report_Supporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-43(a-c) - VPA - Shropshire Hills National Landscape - Clun ForestSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 12-3 - Personal Injury Accident LocationsSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-11a - National Landscape Designations and Blade Tip ZTVSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 9-2 - View-shed Analysis (500 m)Supporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol III - Appendix 1-1 - EIA Scoping ReportSupporting documents · PDF18 Aug 2026View
2022-11-17 - 01928 - EIA Scoping Direction with AppendixSupporting documents · PDF18 Aug 2026View
2025-12-23 - ES Vol III - Appendix 9-1 - Survey MethodologySupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-19d - CZTV_ Proposed Development with Operational Under Construction and Consented Wind Farms (20km)Supporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 11-5a - Peat Depth OverviewSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 3-10 - Typical Access Track Cross-SectionSupporting documents · PDF18 Aug 2026View
2025-12-22 - PAC Appendices - Part 3_Supporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-8 - Horizontal Blade Tip ZTVSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 12-2 - Traffic Count LocationsSupporting documents · PDF18 Aug 2026View
2026-04-16 - ES Vol III - Appendix 3-4 - Arboricultural Impact Assessment (Rev1)Supporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 7-2 - Historic assets within the Site Overlay with Proposed Infrastructure (Sheets 1-4)Supporting documents · PDF18 Aug 2026View
2022-07-15 - EIA Scoping Report - Cover letterSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-17a - Cumulative Wind Farms Within 45kmSupporting documents · PDF18 Aug 2026View
2025-12-22 - Application Form_Supporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 13-1 - Noise Sensitive Receptors - Monitoring Positions and Turbine LayoutSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 8-5 - Phase 1 Habitat MapSupporting documents · PDF18 Aug 2026View
2025-05-19 - Pre-application services request formSupporting documents · PDF18 Aug 2026View
2025-12-23 - ES Vol III - Appendix 6-1 - LVIA MethodologySupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 1-1 - Site Location PlanSupporting documents · PDF18 Aug 2026View
2025-12-23 - ES Vol III - Appendix 10-1 - Carbon BalanceSupporting documents · PDF16 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-26(a-f) - VP7 - Glyndwr's Way _ open access land to the west of Waun DbubarthogSupporting documents · PDF18 Aug 2026View
2025-12-22 - Collaborative Benefits Report_Supporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-13 - Principal Visual Receptors and Blade Tip ZTV_ Transport Routes _ SettlementsSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-23(a-f) - VP4 - Wye Valley Walk to the west of Llangurig (Part 1)Supporting documents · PDF18 Aug 2026View
2025-02-17 - Joint Pre-Application Advice Request Form - Banc Du and Rhiwlas Energy ParksSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol II - Ch14 Cumulative EffectsSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-33(a-f) - VP14 - Severn Way to the east of Llanwnog_Supporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-41(a-f) - VP22 - Cefn Bach - Open Access Land West of Wye ValleySupporting documents · PDF18 Aug 2026View
2025-10-24 - Pre-App Advice Draft ES Check - Rhiwlas Energy ParkSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 7-9 - Result of Peat Depth Survey with Proposed Infrastructure OverlaySupporting documents · PDF18 Aug 2026View
2022-07-15 - EIA Scoping Report - Figure 4.2 - Cumulative Wind FarmsSupporting documents · PDF18 Aug 2026View
2022-07-15 - EIA Scoping Report - Figure 4.4 - Landscape Character AssessmentSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-9 - Blade Tip ZTVSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 11-5c - Peat Survey PhasesSupporting documents · PDF18 Aug 2026View
2025-12-23 - ES Vol III - Appendix 3-1 - Wind Farm Aviation Lighting and Mitigation Technical Appendix_Supporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-19c - CZTV_ Proposed Development with Operational Under Construction and Consented Wind Farms (45km)Supporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-11b - Regional _ Local Landscape Designations and Blade Tip ZTVSupporting documents · PDF18 Aug 2026View
2025-12-23 - ES Vol III - Appendix 3-5 - Grid Connection AppraisalSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-19e - CZTV_ Proposed Development and Banc Du Wind Farm ApplicationSupporting documents · PDF18 Aug 2026View
2026-04-16 - ES Vol II - Ch10 Climate (Rev1)Supporting documents · PDF18 Aug 2026View
2022-06-08 - Pre-Application - Inception meeting note - Banc Du and Rhiwlas Energy ParksSupporting documents · PDF18 Aug 2026View
2026-04-16 - ES Vol III - Appendix 5-1 - Scoping Direction Responses (Rev1)Supporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-19g - CZTV_ Proposed Development and Bryngydfa ApplicationSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 7-5 - VPCH02 7573 Church of St CurigSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol III - Appendix 5-3 - Telecommunications Impact Assessment_Supporting documents · PDF18 Aug 2026View
2025-12-23 - ES Vol III - Appendix 11-1 - Flood Consequence AssessmentSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 8-3 - Terrestrial Ecology Study Area (Map 2 of 2)Supporting documents · PDF18 Aug 2026View
2025-12-23 - ES Vol III - Appendix 11-7 - Drainage StatementSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-35(a-g) - VP16 - Minffordd Path - Cadair Idris ENPSupporting documents · PDF18 Aug 2026View
2022-07-15 - EIA Scoping Report - Figure 5.1 - Non-Designated Heritage AssetsSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-19a - CZTV_ Operational and Under Construction Wind Farms (45km)Supporting documents · PDF18 Aug 2026View
2026-04-16 - ES Vol II - Ch6 Landscape and Visual (Rev1)Supporting documents · PDF18 Aug 2026View
2025-12-22 - Collaborative Benefits Report Appendix 2 - Bute Energy Community Energy Approach_Supporting documents · PDF18 Aug 2026View
2025-12-23 - ES Vol III - Appendix 14-1 - Long List of Committed DevelopmentsSupporting documents · PDF18 Aug 2026View
2022-07-15 - EIA Scoping Report - Figure 4.6 - Landscape Designations with Blade Tip ZTVSupporting documents · PDF18 Aug 2026View
2025-12-23 - ES Vol III - Appendix 13-2 - Substation Noise Impact AssessmentSupporting documents · PDF18 Aug 2026View
2025-12-23 - ES Vol III - Appendix 8-7 - Bat Roost Assessment Report_Supporting documents · PDF18 Aug 2026View
2022-07-15 - EIA Scoping Report - Figure 5.2 - Designated Heritage AssetsSupporting documents · PDF18 Aug 2026View
2025-12-23 - ES Vol III - Appendix 11-5 - Water Framework Directive AssessmentSupporting documents · PDF18 Aug 2026View
2026-04-16 - ES Vol II - Ch11 Land Soils and Water (Rev1)Supporting documents · PDF18 Aug 2026View
2025-12-22 - Planning Obligations and Draft Conditions StatementSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-19h - CZTV_ Proposed Development and Nant Mithil ApplicationSupporting documents · PDF18 Aug 2026View
2025-12-22 - Collaborative Benefits Report Appendix 6 - Future Skills Strategy_Supporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 14-2 - Committed Developments within 45 km and 10 kmSupporting documents · PDF18 Aug 2026View
2025-12-23 - ES Vol III - Appendix 11-1 - Flood Consequence AssessmentSupporting documents · PDF16 Sept 2026View
2025-12-22 - ES Vol III - Appendix 2-1 - AIL Route Environmental ReviewSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 11-3 - Superficial GeologySupporting documents · PDF18 Aug 2026View
2025-12-23 - ES Vol III - Appendix 8-8 - Banc Du and Rhiwlas AILR UKHab PEA_Supporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 3-11 - Typical Passing Place Plan and SectionSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-42(a-f) - VP23 - Wye Valley WalkSupporting documents · PDF18 Aug 2026View
2026-01-06 - ES Vol III - Appendix 12-1 - Transport Assessment_Supporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-29(a-g) - VP10 - Llyn Clwyedog viewpoint_Supporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-2 - LandformSupporting documents · PDF18 Aug 2026View
2025-12-22 - Socio-Economic StatementSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 8-7 - Illustrative Habitat EnhancementsSupporting documents · PDF18 Aug 2026View
2025-12-22 - Planning StatementSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-36(a-e) - VP17 - Offa's Dyke Hawthorn HillSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-34(a-f) - VP15 - Hill summit to the south of Llandrindod WellsSupporting documents · PDF18 Aug 2026View
2025-12-23 - ES Vol III - Appendix 8-12 - PAC CommentsSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-40(a-i) - VP21 - Wye Valley near DernolSupporting documents · PDF18 Aug 2026View
2025-12-23 - ES Vol III - Appendix 9-11 - Updated Breeding Bird Surveys_Supporting documents · PDF18 Aug 2026View
2026-04-16 - ES Vol II - Ch7 Cultural Heritage (Rev1)Supporting documents · PDF18 Aug 2026View
2025-12-23 - ES Vol III - Appendix 11-4 - Watercourse Crossing ScheduleSupporting documents · PDF18 Aug 2026View
2026-04-16 - ES Vol III - Appendix 11-2 - Borrow Pit Assessment (Rev1)Supporting documents · PDF18 Aug 2026View
2025-12-23 - ES Vol III - Appendix 10-1 - Carbon BalanceSupporting documents · PDF18 Aug 2026View
2025-04-04 - NOTIFF001 - Notification FormSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-7b - Hub Height ZTV with Viewpoints (A1)Supporting documents · PDF18 Aug 2026View
2026-08-17 - EXNXOTE001 - Acceptance NoticeSupporting documents · PDF18 Aug 2026View
2025-12-23 - ES Vol III - Appendix 9-1 - Survey MethodologySupporting documents · PDF16 Sept 2026View
2025-12-22 - ES Vol IV - Figure 4-1b - Alternative Site Development OptionsSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-24(a-g) - VP5 - B4518 south of LlanidloesSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol III - Appendix 1-2 - EIA Scoping Direction_Supporting documents · PDF18 Aug 2026View
2026-04-16 - Green Infrastructure Statement (Rev1)Supporting documents · PDF18 Aug 2026View
2026-04-16 - ES Vol III - Appendix 8-1 - Otter and Water Vole Report (Rev1)_Supporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-3c - Landscape Character LegendSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 7-8 - VPCH05 169086 Cwm y Saeson - CairnSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-6a - Blade Tip ZTV with Viewpoints (A3)Supporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-16 - Principal Visual Receptors and Blade Tip ZTV_ Site ContextSupporting documents · PDF18 Aug 2026View
2025-12-23 - ES Vol III - Appendix 3-1 - Wind Farm Aviation Lighting and Mitigation Technical Appendix_ (2)Supporting documents · PDF14 Sept 2026View
2022-07-15 - EIA Scoping Report - Figure 4.5 - LANDMAPSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol II - Ch 9 OrnithologySupporting documents · PDF18 Aug 2026View
2025-12-23 - ES Vol III - Appendix 11-8 - Outline Soil Management PlanSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 12-1 - Study AreaSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 8-1 - Habitat Condition Assessment PlanSupporting documents · PDF18 Aug 2026View
2026-04-16 - ES Vol III - Appendix 8-10 - Outline HMP (Rev1)_Supporting documents · PDF18 Aug 2026View
2022-07-15 - EIA Scoping Report - Figure 4.3 - Blade Tip ZTV with ViewpointsSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-5b - Principal Visual Receptors - Recreational RoutesSupporting documents · PDF18 Aug 2026View
2025-12-23 - ES Vol III - Appendix 3-1 - Wind Farm Aviation Lighting and Mitigation Technical Appendix_Supporting documents · PDF18 Aug 2026View
2026-08-17 - ES Vol I - Non-technical Summary (Rev1) - WelshSupporting documents · PDF18 Aug 2026View
2022-07-15 - EIA Scoping Report - Figure 1.3 - Site Constraints PlanSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-19f - CZTV_ Proposed Development and Esgair Cwmowen ApplicationSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-31(a-g) - VP12 - Summit of Pen Pumlumon Fawr _ Cambrian WaySupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 3-9 - Preliminary Visibility SplaySupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-23(g-k) - VP4 - Wye Valley Walk to the west of Llangurig (Part 2)Supporting documents · PDF18 Aug 2026View
2026-01-27 - ES Completeness Report (English)Supporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 12-4 - Abnormal Indivisible Loads Delivery RouteSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 7-7 - VPCH04 168781 Cwm y Saeson - CairnSupporting documents · PDF18 Aug 2026View
2026-04-16 - ES Vol III - Appendix 11-6 - PAC Comments (Rev1)Supporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-17b - Cumulative Wind Farms Within 20kmSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 3-7 - Substation Compound and Control Building ElevationsSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 3-13 - Main Construction Compound PlanSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 11-1 - Study AreaSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-8 - Horizontal Blade Tip ZTVSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 11-6 - HydrologySupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 8-4 - Abnormal Indivisible Load Route OverviewSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 11-4 - Soils and PeatSupporting documents · PDF18 Aug 2026View
2025-12-22 - Habitats Regulations AssessmentSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 7-3 - Historic assets included in the Environmental Statement due to identified setting effectsSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-28(a-i) - VP9 - A44 Wye Valley west of Llangurig_Supporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-25(a-g) - VP6 - Llanidloes (Part 1)Supporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 7-4 - VPCH01 RD119 Cwm y Saeson Standing StoneSupporting documents · PDF18 Aug 2026View
2025-12-22 - Collaborative Benefits Report Appendix 4 - Bute Energy Social Value PolicySupporting documents · PDF18 Aug 2026View
2022-07-15 - EIA Scoping Report - Figure 1.2 - Site LayoutSupporting documents · PDF18 Aug 2026View
2025-12-23 - ES Vol III - Appendix 9-2 - Bryn Titli Wind Farm Ecological and Ornithological Desk Study March 2019_Supporting documents · PDF18 Aug 2026View
2025-12-22 - PAC Appendices - Part 2_Supporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol II - Ch13 Noise and VibrationSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 11-5b - Peat Survey LocationsSupporting documents · PDF18 Aug 2026View
2025-12-22 - Collaborative Benefits Report Appendix 3 - Community Investment Strategy_Supporting documents · PDF18 Aug 2026View
2025-12-23 - ES Vol III - Appendix 9-6 - Rhiwlas Year 3 - Flight Activity Summary ReportSupporting documents · PDF14 Sept 2026View
2025-12-22 - ES Vol IV - Figure 6-1 - Site Location and Study AreaSupporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-19b - CZTV_ Proposed Development with Operational and Under Construction Wind Farms (20km)Supporting documents · PDF18 Aug 2026View
2025-12-22 - Turbine Details_Summary SheetSupporting documents · PDF18 Aug 2026View
Rhiwlas Energy Park ARWTN Statement v2Supporting documents · PDF18 Aug 2026View
2026-01-06 - ES Vol III - Appendix 3-2 - Aviation Technical Report_Supporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 3-4 - Typical Crane PadSupporting documents · PDF18 Aug 2026View
2025-12-23 - ES Vol III - Appendix 8-6 - 2024 Bat Static Detector Survey Report_Supporting documents · PDF18 Aug 2026View
2025-12-22 - ES Vol IV - Figure 6-15 - Principal Visual Receptors and Blade Tip ZTV_ Local ContextSupporting documents · PDF18 Aug 2026View
2022-07-15 - EIA Scoping Report - Figure 11.1 - Indicative Noise ContoursSupporting documents · PDF18 Aug 2026View
2025-12-23 - ES Vol III - Appendix 8-11 - Updated Ecology Surveys_Supporting documents · PDF18 Aug 2026View
2026-05-14 - ES Completeness Report (Welsh)Supporting documents · PDF18 Aug 2026View
2025-12-23 - ES Vol III - Appendix 6-2 - LANDMAPSupporting documents · PDF18 Aug 2026View
2025-12-23 - ES Vol III - Appendix 6-5 - Cumulative DevelopmentsSupporting documents · PDF18 Aug 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.