Council planning record

Rewiring of castle keep: replacing existing aged PVC and VIR cabling with MICC and other type cables; Relocation of distribution boards; Upgrade of some existing luminaires to LED with some reconfiguration of switching controls and installation of control cabling; Installation of data cabling and wireless access points

Powis Castle Red Lane Welshpool Powys SY21 8RG

Decision MadeReference: 25/0712/LBCPowys County Council

Last published check: 13 Oct 2026, 13:40. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received date

    Published milestoneCouncil source
  2. Valid date

    Published milestoneCouncil source
  3. Scheduled Decision Date

    Published milestoneCouncil source
  4. Decision date

    Published milestoneCouncil source
  5. Decision notice sent date

    Published milestoneCouncil source

Application summary

Status
Decision Made
Application type
Listed Building Consent
Received
12 May 2025
Validated
12 May 2025
Determination deadline
Not published
Local authority
Powys County Council

Application overview

Rewiring of castle keep: replacing existing aged PVC and VIR cabling with MICC and other type cables; Relocation of distribution boards; Upgrade of some existing luminaires to LED with some reconfiguration of switching controls and installation of control cabling; Installation of data cabling and wireless access points

Proposal details

Reference
25/0712/LBC
Alternative references
Powis Castle Long Term Rewiri...

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Powis Castle Red Lane Welshpool Powys SY21 8RG

This record has no verified map location.

Documents 102 of 102

DocumentPublishedAction
PROJECT A_PH 4_ROOM 27_1_OAK DRAWING ROOMPlans · PDF12 May 2025View
PROJECT A_PH 1.5_ ROOM 33A AND 33B_HOUSEKEEPERS STOREPlans · PDF12 May 2025View
PROJECT A_PH BACKUP_CORRIDOR 94Plans · PDF12 May 2025View
PROJECT A_PH 3_ROOM 19B_2_GREEN STAIRCASEPlans · PDF12 May 2025View
PROJECT A_PH 1_ROOM 30_2_BLUE_DRAWING_ROOM R.Plans · PDF16 May 2025View
PROJECT A_PH 1_ROOM 31_1_BACK_STAIRCASEPlans · PDF16 May 2025View
PROJECT A_PH 4_ROOM 43_2_SMALL PRIVATE DINING ROOMPlans · PDF12 May 2025View
PROJECT A_PH 1.5_ ROOM 44_2_LARGE PRIVATE ROOMPlans · PDF12 May 2025View
PROJECT A_PH 5_ROOM 40_1_SITTING ROOMPlans · PDF20 May 2025View
PROJECT A_PH BACKUP_ROOM 93_LARDERPlans · PDF12 May 2025View
PROJECT A_PH BACKUP_CORRIDOR 101Plans · PDF12 May 2025View
POWIS REWIRING_023 SECOND AND THIRD FLOOR PLAN AS PROPOSED REV BPlans · PDF12 May 2025View
FIRST FLOOR PLAN WIFI LOCATIONS-Plans · PDF12 May 2025View
PROJECT A_PH 4.5_ROOM 20-20A_1_DUKES ROOMPlans · PDF12 May 2025View
PROJECT A_PH 1_ROOM 28_2_LIBRARY.Plans · PDF16 May 2025View
PROJECT A_PH 5_ROOM 37_2_STONE CORRIDORPlans · PDF12 May 2025View
POWIS REWIRING_010 LOWER GROUND FLOOR AND BASEMENT PLAN AS EXISTINGPlans · PDF12 May 2025View
POWIS REWIRING_011 GROUND FLOOR PLAN AS EXISTINGPlans · PDF12 May 2025View
PROJECT A_PH BACKUP_ROOM 95 AND 100_CELLAR AND CHAMPAGNE STOREPlans · PDF12 May 2025View
PROJECT A_PH 4_ROOM 13B_1_RED STAIRPlans · PDF12 May 2025View
APPENDIX C - COLLECTIONS PLANNING STORAGE PROTECTION AND REINSTATEMENTSupporting documents · PDF12 May 2025View
ADDENDUM TO HERITAGE IMPACT STATEMENTAdditional information · PDF5 Aug 2025View
PROJECT A_PH BACKUP_ROOM 98 CELLARPlans · PDF12 May 2025View
PROJECT A_PH 4_ROOM 21-21A_1_BATHROOMPlans · PDF20 May 2025View
PROJECT A_PH BACKUP_101A 101B AND 101CPlans · PDF12 May 2025View
SCHEDULE OF FIXTURES AND FITTINGSPlans · PDF12 May 2025View
PROJECT A_PH 4_ROOM 27_2_OAK DRAWING ROOMPlans · PDF12 May 2025View
POWIS REWIRING_200 PROJECT A_DETAILS_PROPOSED PANELLING AND FLOORBOARD DETAILSPlans · PDF12 May 2025View
PROJECT A_PH 1.5_ ROOM 44_1_LARGE PRIVAT....Plans · PDF16 May 2025View
PROJECT A_PH 5_ROOM 41A_1_WCPlans · PDF12 May 2025View
HERITAGE IMPACT STATEMENT FEB 2025 UPDATESupporting documents · PDF12 May 2025View
PROJECT A_PH 4.5_ROOM 19_GALLERY ROOMPlans · PDF12 May 2025View
PROJECT A_PH 4.5_ROOM 20-20A_2_DUKES ROOM..Plans · PDF20 May 2025View
POWIS REWIRING_013 SECOND AND THIRD FLOOR PLAN AS EXISTINGPlans · PDF12 May 2025View
APPENDIX D - NT PROTECTION OF HISTORIC COLLECTIONS AND INTERIORSSupporting documents · PDF12 May 2025View
PROJECT A_PH 3_ROOM 19B_1_GREEN STAIRSPlans · PDF12 May 2025View
PROJECT A_PH 1.5_ ROOM 34_1_ENTRANCE LOBBYPlans · PDF12 May 2025View
PROJECT A_PH 1.5_ ROOM 33_1_GRAND STAIRC...Plans · PDF16 May 2025View
PROJECT A_PH 2_ROOM 32_2_DINING ROOMPlans · PDF12 May 2025View
PROJECT A_PH BACKUP_ROOM 99 CELLAR1Plans · PDF12 May 2025View
APPLICATIONFORMREDACTEDApplication Form · PDF12 May 2025View
PROJECT A_PH 5_ROOM 41_1_MUSIC ROOMPlans · PDF12 May 2025View
POWIS REWIRING_022 FIRST FLOOR PLAN AS PROPOSED REV BPlans · PDF12 May 2025View
BAT REPORT - STAR ECOLOGY - POWIS_ROOF-SPACES_BATSupporting documents · PDF12 May 2025View
CADW LISTED BUILDINGSConsultee Comment · PDF12 Jan 2026View
PROJECT A_PH 4_ROOM 25_2_GATEWAY ROOMPlans · PDF12 May 2025View
PROJECT A_PH 1_ROOM 31_2_BACK_STAIRCASEPlans · PDF12 May 2025View
PROJECT A_PH 1.5_ ROOM 33_3_GRAND STAIRCASEPlans · PDF12 May 2025View
PROJECT A_PH BACKUP_ROOM 81 AND 82_SCULLERY...Plans · PDF20 May 2025View
PROJECT A_PH 1_ROOM 30_BLUE DRAWING ROOM_CUPBOARD SKETCHPlans · PDF12 May 2025View
PROJECT A_PH 4.5_ROOM 17_2_WALCOT ROOMPlans · PDF20 May 2025View
CADW RE DELEGATED DECISIONConsultee Comment · PDF7 Jan 2026View
PROJECT A_PH 4_ROOM 42_OPEN LOBBYPlans · PDF20 May 2025View
APPENDIX E - POWIS CASTLE PANELLING REMOVAL METHODOLOGYSupporting documents · PDF12 May 2025View
PROJECT A_PH 4.5_ROOM 24_1_STATE BEDROOMPlans · PDF20 May 2025View
PROJECT A_PH 1_ROOM 30_3_BLUE_DRAWING_ROOMPlans · PDF12 May 2025View
POW-BL-PL-SF V1Plans · PDF12 May 2025View
PROJECT A_PH 1_ROOM 30_1_BLUE_DRAWING_RO..Plans · PDF16 May 2025View
PROJECT A_PH 1.5_ ROOM 59_1_WEST ENTRANCE LOBBYPlans · PDF12 May 2025View
PROJECT A_PH 4_ROOM 25_1_GATEWAY ROOMPlans · PDF12 May 2025View
PROJECT A_PH 1_ROOM 28_1_LIBRARY.Plans · PDF16 May 2025View
PROJECT A_PH 2_ROOM 32_1_DINING ROOMPlans · PDF12 May 2025View
APPENDIX A - IN SITU PROTECTION PRINCIPLESSupporting documents · PDF12 May 2025View
REPORT DR SAM JOHNSONDelegated Report23 Dec 2025View
PROJECT A_PH 1.5_ ROOM 33_2_GRAND STAIRCASEPlans · PDF12 May 2025View
POW-BL-PL-GF V4Plans · PDF12 May 2025View
LBC APPROVAL NOTICEDecision · PDF14 Jan 2026View
POWIS REWIRING_020 LOWER GROUND FLOOR PLAN AS PROPOSED REV CPlans · PDF12 May 2025View
PROJECT A_PH 4.5_ROOM 24_2_STATE BEDROOMPlans · PDF12 May 2025View
PROJECT A_PH 4_ROOM 13B_2_RED STAIRPlans · PDF12 May 2025View
BLOCK PLANPlans · PDF12 May 2025View
LETTER FROM AGENTCorrespondence · PDF13 Nov 2025View
PROJECT A_PH 3_ROOM 102_BIN STOREPlans · PDF12 May 2025View
PROJECT A_PH 4_ROOM 43_1_SMALL PRIVATE DINING ROOMPlans · PDF12 May 2025View
PROJECT A_PH 4.5_ROOM 17_1_WALCOT ROOMPlans · PDF12 May 2025View
PROJECT A_PH 4_ROOM 23_1_GALLERYPlans · PDF12 May 2025View
POW-BL-PL-FF V5Plans · PDF12 May 2025View
PROJECT A_PH 4_ROOM 23A_1_GALLERYPlans · PDF20 May 2025View
PROJECT A_PH 1.5_ROOM 22_1_LOWER TOWER B....Plans · PDF16 May 2025View
APPENDIX F - OUTLINE SPECIFICATIONSSupporting documents · PDF12 May 2025View
PROJECT A_PH 5_ROOM 36_1Plans · PDF12 May 2025View
APPENDIX B - METHODS FOR PACKING AND PROTECTING THE CONTENTS OF HOUSESSupporting documents · PDF12 May 2025View
PROJECT A_PH BACKUP_ROOM 80_KITCHENPlans · PDF20 May 2025View
PROJECT A_PH 5_ROOM 35_1_BEDROOMPlans · PDF12 May 2025View
PROJECT A_PH 5_ROOM 39_1_LIBRARYPlans · PDF12 May 2025View
PROJECT A_PH 1.5_ROOM 22_2_LOWER TOWER BEDROOMPlans · PDF12 May 2025View
PROJECT A_PH 5_ROOM 35_2_BEDROOMPlans · PDF12 May 2025View
PROJECT A_PH 5_ROOM 38_1_CHINESE SITTING ROOMPlans · PDF12 May 2025View
POWIS REWIRING_012 FIRST FLOOR PLAN AS EXISTINGPlans · PDF12 May 2025View
PROJECT A_PH 2_ROOM 32_3_DINING ROOM_CUPBOARD_SKETCHPlans · PDF12 May 2025View
PROJECT A_PH 1.5_ROOM 45_1_LAVATORIESPlans · PDF12 May 2025View
PROJECT A_PH BACKUP_ROOM 96 AND 97_CELLAR AND WINE CELLARPlans · PDF12 May 2025View
HERITAGE IMPACT ASSESSMENT ADDENDUM 2 -Additional information · PDF13 Nov 2025View
POWIS REWIRING_021 GROUND FLOOR PLAN AS PROPOSED REV BPlans · PDF12 May 2025View
COMMUNITY COUNCILConsultee Comment · PDF17 Jun 2025View
PROJECT A_PH 5_ROOM 37_1_STONE CORRIDORPlans · PDF12 May 2025View
POWIS REWIRING_121 PHOTOGRAPHS PROPOSED WIFI UNIT LOCATIONS AND CABLINGPlans · PDF12 May 2025View
PROJECT A_PH 4_ROOM 23_2_GALLERYPlans · PDF12 May 2025View
PROJECT A_PH 4.5_ROOM 18_STATE BATHROOMPlans · PDF20 May 2025View
LOWER GROUND FLOOR PLAN WIFI LOCATIONSPlans · PDF12 May 2025View
LOCATION PLANPlans · PDF12 May 2025View
PROJECT A_PH BACKUP_ROOM 92_SMALL KITCHEN...Plans · PDF20 May 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Approve
CADW RE DELEGATED DECISION LBC APPROVAL NOTICE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.