The development shall begin not later than five years from the date of this decision. Reason: Required to be imposed pursuant to Section 91 (1) of the Town and Country Planning Act 1990 (as amended).
The development shall be carried out in accordance with the following approved plans and documents: • Plan 01 Rev A3 Proposed North Elevation rec 18/8/26 • Plan 02 Rev A3 Proposed South Elevation rec 18/8/26 • Plan 03 Rev A Proposed East and West Elevations rec 18/8/26 • Plan 04 Rev A Proposed Ground Floor Plan • Plan 05 Rev A3 Proposed First Floor Plan Rev 02 • Plan 07 Rev 03A Alterations and First Floor Extension to Dwelling • Location Plan • Photographs • Green Infrastructure Statement • Preliminary Bat Roost Assessment Report rec 30/07/26 • Existing Layout Plan rec 09/09/26 • Proposed Layout Plan rec 09/09/26 Reason: In order to be clear on the approved scheme of development in the interests of protecting visual amenity and the special qualities of the National Park. Policy: Local Development Plan 2 – Policies 1 (National Park Purposes and Duty), 8 (Special Qualities), 14 (Conservation of the Pembrokeshire Coast National Park) and 29 (Sustainable Design).
Lighting: Any additional external lighting in connection with the proposed development should be low level, hooded and downward facing to avoid light spill, avoid shining directly onto features such as woodland edge and hedgerows, and should be operated on a PIR activated timer. Lighting details should be submitted to and approved in writing by the Local Planning Authority prior to installation. Reason: In the interests of maintaining the special qualities of the landscape and habitats of the National Park through the protection, creation and enhancement of links between sites and their protection for amenity, landscape and biodiversity value. Policy: Local Development Plan 2 - Policies 1 (National Park Purposes and Duty), 8 (Special Qualities), 11 (Nationally Protected Sites and Species), 14 (Conservation of the Pembrokeshire Coast National Park), 30 (Amenity) and to comply with the Wildlife & Countryside Act 1981 (as amended), the Conservation of Habitats and Species Regulations 2017 and the Environment (Wales) Act 2016.
In the first available planting seasons following approval, planting must be implemented according to the Green Infrastructure Statement (Green Infrastructure Statement). Any existing plants retained; or new plants planted in accordance with the approved scheme which, within a period of 5 years after implementation of the approved development are removed, die, become diseased or damaged to such extent that, in the opinion of the Local Planning Authority, the function in relation to this planning approval is no longer delivered, shall be replaced with plants of similar size and specification. Any variations to the details of the documents and plans must only be undertaken after the proposed variations have been agreed in writing by the LPA. Reason: To prevent detrimental impact to trees, hedges and other landscape features which contribute to the amenity, landscape & biodiversity of the site and surrounding area. Local Development Plan 2 – Policies: 1 (National Park Purposes and Duty), 8 (Special Qualities), 14 (Conservation and enhancement of the Pembrokeshire Coast National Park), 30 (Amenity), SPG 12 – Biodiversity, Technical Advice Note (TAN) 5: Nature Conservation and Planning (2009), Technical Advice Note (TAN) 10: Tree Preservation Orders (1997).
The bat and bird boxes shall be installed in full adherence to the details submitted to this authority (Green Infrastructure Statement & Plan 03 Rev A Proposed East and West Elevations rec 18/8/26, Plan 02 Rev A3 Proposed South Elevation rec 18/8/26, and Plan 01 Rev A3 Proposed North Elevation rec 18/8/26) within 6 months of the other works hereby approved being completed. Any variations to the details of the documents and plans must only be undertaken after the proposed variations have been agreed in writing by the LPA. Reason: To prevent detrimental impact to trees, hedges and other landscape features which contribute to the amenity, landscape & biodiversity of the site and surrounding area. Local Development Plan 2 – Policies: 1 (National Park Purposes and Duty), 8 (Special Qualities), 14 (Conservation and enhancement of the Pembrokeshire Coast National Park), 30 (Amenity), SPG 12 – Biodiversity, Technical Advice Note (TAN) 5: Nature Conservation and Planning (2009), Technical Advice Note (TAN) 10: Tree Preservation Orders (1997).
The existing single-storey flat roof of the application dwelling shall not be used as a balcony, terrace, roof garden, sitting-out area, amenity area or for any other recreational or leisure purpose. Access to the flat roof shall be restricted to access reasonably required for the inspection, repair and maintenance of the building, roof and associated equipment only. No decking, patio furniture, seating, tables, planters, balustrades, railings or other structures or items intended to facilitate or encourage use of the flat roof as an external amenity area shall be installed, placed or maintained upon the roof. Reason: To protect the character, appearance, and use of the building/land and its setting and the amenity and appearance of the Pembrokeshire Coast National Park. Policy: Local Development Plan 2 – Policies 1 (National Park Purposes and Duty), 8 (Special Qualities) and 14 (Conservation of the Pembrokeshire Coast National Park).
Informatives PCNPA Public Rights of Way Officer • The proposed development would abut - and access is via - a public right of way, Public Footpath PP7/21 • The public rights of way must not be obstructed. • There must be no diminution to the width of the public right of way • No damage is to be caused to the surface of the public rights of way • No additional barriers are to be placed on the public rights of way, either of a temporary or permanent nature
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.