Council planning record

I am working on behalf of an ECO install company. We are installing a number of energy efficiency measures under the ECO4 funded scheme at Old Booth Farm, Sheffield, South Yorkshire, S36 4ZA. The property is located within a conservation area, and we are proposing the installation of internal insulation measures, an air source heat pump, and solar panels. The solar panels are proposed to be installed on the south-east facing roof elevation, comprising a total of 18 panels. The air source heat pump will be located at the rear of the property, adjacent to an existing unheated building. The exact locations of both the solar panels and the heat pump will be clearly indicated on the submitted site block plans and elevation drawings.

Old Booth Farm, Canyards Hills Lane, Sheffield, S36 4ZA

Decided: SPLIT DECISIONReference: NP/S/0625/0634Peak District National Park Authority

Last published check: 31 Oct 2026, 21:20. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Registered

    Published milestoneCouncil source
  2. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided: SPLIT DECISION
Application type
Not published
Received
Not published
Validated
Not published
Determination deadline
21 Aug 2025
Local authority
Peak District National Park Authority

Application overview

I am working on behalf of an ECO install company. We are installing a number of energy efficiency measures under the ECO4 funded scheme at Old Booth Farm, Sheffield, South Yorkshire, S36 4ZA. The property is located within a conservation area, and we are proposing the installation of internal insulation measures, an air source heat pump, and solar panels. The solar panels are proposed to be installed on the south-east facing roof elevation, comprising a total of 18 panels. The air source heat pump will be located at the rear of the property, adjacent to an existing unheated building. The exact locations of both the solar panels and the heat pump will be clearly indicated on the submitted site block plans and elevation drawings.

Proposal details

Reference
NP/S/0625/0634
Parish
Bradfield
Agent
Mr Daniel Wallis - ECS ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Old Booth Farm, Canyards Hills Lane, Sheffield, S36 4ZA

This record has no verified map location.

Documents 13 of 13

DocumentPublishedAction
2-1- ApplicationFormRedactedCouncil documentNot publishedView
2-2 - LocationPlanCouncil documentNot publishedView
2-3 - OLD BOOTH FARM SHEFFIELD SOUTH YORKSHIRE SOUTH YORKSHIRE S36 4ZA - block planCouncil documentNot publishedView
2-4- OLD BOOTH FARM SHEFFIELD SOUTH YORKSHIRE SOUTH YORKSHIRE S36 4ZA - floor planCouncil documentNot publishedView
2-5 - OLD BOOTH FARM SHEFFIELD SOUTH YORKSHIRE SOUTH YORKSHIRE S36 4ZA Easy PV Project ReportCouncil documentNot publishedView
2-6 - OLD BOOTH FARM SHEFFIELD SOUTH YORKSHIRE SOUTH YORKSHIRE S36 4ZA- roof planCouncil documentNot publishedView
2-7 - RMS-OldBooth-S36 Location AssessmentCouncil documentNot publishedView
2-8 - Roof Plan - Proposed_included_in_Roof Plan - ExistingCouncil documentNot publishedView
2-9 - FeeCalculationCouncil documentNot publishedView
2-10 - AttachmentSummaryCouncil documentNot publishedView
001 DELEGATED REPORT - AE SIGNED 24.10.2025.pdfCouncil documentNot publishedView
002 APPROVAL CERTIFICATE - AE SIGNED 24.10.2025.pdfCouncil documentNot publishedView
003 REFUSAL CERTIFICATE - AE SIGNED 24.10.2025.pdfCouncil documentNot publishedView

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Decided: SPLIT DECISION
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.