Council planning record

Material unloading, conveying and storage facility and associated importation of shale substitute kilnfeed material (ARM). This will also require the removal of a few elements of minor infrastructure and some vegetation.

Hope Cement Works Hope Works Hope Cement Works

Decided: GRANTED CONDITIONALLYReference: NP/HPK/1020/0929Peak District National Park Authority

Last published check: 29 Oct 2026, 02:40. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Registered

    Published milestoneCouncil source
  2. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided: GRANTED CONDITIONALLY
Application type
Not published
Received
Not published
Validated
Not published
Determination deadline
15 Feb 2021
Local authority
Peak District National Park Authority

Application overview

Material unloading, conveying and storage facility and associated importation of shale substitute kilnfeed material (ARM). This will also require the removal of a few elements of minor infrastructure and some vegetation.

Proposal details

Reference
NP/HPK/1020/0929
Parish
Hope
Agent
Wardell Armstrong LLP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Hope Cement Works Hope Works Hope Cement Works

This record has no verified map location.

Documents 260 of 260

DocumentPublishedAction
Design and Access Statement 01-10-2020Council documentNot publishedView
ARM import application Appendix 5.1 PDNP Pre application response 01-10-2020Council documentNot publishedView
ARM import application Appendix 5.2 Consultation response Derbyshire County Council Highways 01-10-2020Council documentNot publishedView
ARM import application Appendix 5.3 Consultation response the Environment Agency 01-10-2020Council documentNot publishedView
ARM import application Appendix 5.4 Consultation response Historic England 01-10-2020Council documentNot publishedView
ARM import application Appendix 5.5 Consultation response Natural England 01-10-2020Council documentNot publishedView
ARM import application Appendices 12.1 to 12.4 01-10-2020Council documentNot publishedView
ARM import application Appendix 3.2 Sustainability Statement 01-10-2020Council documentNot publishedView
ARM import application Appendix 3.3 Replacement Design Options Study 01-10-2020Council documentNot publishedView
ARM import application Appendix 3.4 Rail Maintenance Contractor Handbook 01-10-2020Council documentNot publishedView
ARM import application Appendix 4.1 Planning Policy Compliance Matrix 01-10-2020Council documentNot publishedView
ARM import application Appendix 6.2 Methodology for producing ZTVs 01-10-2020Council documentNot publishedView
ARM import application Appendix 7.2 Relevant Planning Policy and Legislation 01-10-2020Council documentNot publishedView
ARM import application Appendix 7.4 Summary of Defra Biodiversity Metric 2.0 01-10-2020Council documentNot publishedView
ARM import application Appendix 5.6 Consultation information boards 01-10-2020Council documentNot publishedView
ARM import application Appendix 5.7 Promotional poster 01-10-2020Council documentNot publishedView
ARM import application Appendix 5.8 Stakeholder letter a 01-10-2020Council documentNot publishedView
78860589-1020-0929_Supporting Documents - 1279682.pdfCouncil documentNot publishedView
ARM import application Appendix 11.2 CO2 Emissions Summary 01-10-2020Council documentNot publishedView
ARM import application Appendix 12.5 Dust Action Plan 01-10-2020Council documentNot publishedView
ARM import application Appendix 13.3 Weather October 2019 01-10-2020Council documentNot publishedView
ARM import application Appendix 13.4 Train Movements 01-10-2020Council documentNot publishedView
ARM import application Appendix 7.5 Phase 2 Pre-development Arboricultural Report 01-10-2020Council documentNot publishedView
ARM import application Appendix 10.1 Heritage Statement 01-10-2020Council documentNot publishedView
ARM import application Appendix 11.1 GHG Emissions Calculations 01-10-2020Council documentNot publishedView
ARM import application Chapter 3 figure 70056391-52-1210-A1 Issue 02 - Cut and Fill Exhibit for Proposed Material Storage Building 01-10-2020Council documentNot publishedView
ARM import application Chapter 3 figure 70056391-52-1211-A1 Issue 02 - Cut and Fill Sections for Material Storage Building 01-10-2020Council documentNot publishedView
ARM import application Chapter 3 figure 70056391-54-0001-A1 Issue 02 - Existing Site Layout 01-10-2020Council documentNot publishedView
ARM import application Chapter 3 figure 70056391-54-0002-A1 Issue 02 - Proposed Site Layout 01-10-2020Council documentNot publishedView
ARM import application Chapter 3 figure 70056391-54-0003-A1 Issue 02 - Building 01 - Rail Offloading Facility - General Arrangement Plans 01-10-2020Council documentNot publishedView
ARM import application Chapter 3 figure 70056391-54-0004-A1 Issue 02 - Building 01 - Rail Offloading Facility - North and West Elevations 01-10-2020Council documentNot publishedView
ARM import application Appendix 14.1 Collision Summary Sheet 01-10-2020Council documentNot publishedView
ARM import application Appendix 016A Summary of EffectsCouncil documentNot publishedView
ARM import application Chapter 3 figure 70056391-54-0010-A1 Issue 02 - Building 06 - CV01-ST2 - Northern Access Stairs - Plans Sections and Elevations 01-10-2020Council documentNot publishedView
ARM import application Chapter 3 figure 70056391-54-0013-A1 Issue 02 - Building 08 - Transfer Tower TT01 - General Arrangement Sections 01-10-2020Council documentNot publishedView
ARM import application Chapter 3 figure 70056391-54-0014-A1 Issue 02 - Building 09 - General Arrangement Ground 01-10-2020Council documentNot publishedView
ARM import application Figure 2.1 General Site Location 01-10-2020Council documentNot publishedView
ARM import application Chapter 3 figure 70056391-54-0005-A1 Issue 02 - Building 01 - Rail Off Loading Facility - South and East Elevations 01-10-2020Council documentNot publishedView
ARM import application Chapter 3 figure 70056391-54-0006-A1 Issue 02 - Building 01 - Rail Off Loading Building - Sections 01-10-2020Council documentNot publishedView
ARM import application Chapter 3 figure 70056391-54-0008-A1 Issue 01 - Buildings 03-07 - Conveyor CV01 - General Arrangement - Plan and Elevations 01-10-2020Council documentNot publishedView
ARM import application Figure 2.6 Access Routes 01-10-2020Council documentNot publishedView
ARM import application Figure 2.7 Local Access Routes 01-10-2020Council documentNot publishedView
ARM import application Figure 10.1 On site Derbyshire HER and PDNPA HBSMR entries 01-10-2020Council documentNot publishedView
ARM import application Figure 12.1 Air Quality Receptor Locations 01-10-2020Council documentNot publishedView
ARM import application Figure 12.2 Air Quality Concentrations and Ecological Designations 01-10-2020Council documentNot publishedView
ARM import application Figure 13.1 Existing Sensitive Receptors and Monitoring Locations 01-10-2020Council documentNot publishedView
ARM import application Figure 2.3 Topography (Surrounding Area) 01-10-2020Council documentNot publishedView
ARM import application Figure 2.5 Sensitive Receptors 01-10-2020Council documentNot publishedView
ARM import application Part 002 Site description 01-10-2020Council documentNot publishedView
ARM import application Part 003 Project description 01-10-2020Council documentNot publishedView
ARM import application Part 004 Planning policy context 01-10-2020Council documentNot publishedView
ARM import application Part 005 Consultation 01-10-2020Council documentNot publishedView
ARM import application Part 006 Landscape and Visual Impact Assessment 01-10-2020Council documentNot publishedView
ARM import application Figure 13.2 Predicted Construction Noise Levels 01-10-2020Council documentNot publishedView
ARM import application Figure 13.3 Predicted ARM Plant Noise Levels 01-10-2020Council documentNot publishedView
ARM import application Part 001 Introduction 01-10-2020Council documentNot publishedView
ARM import application Part 012 Air Quality 01-10-2020Council documentNot publishedView
ARM import application Part 013 Noise and Vibration 01-10-2020Council documentNot publishedView
ARM import application Part 015 Socioeconomics 01-10-2020Council documentNot publishedView
ARM import application Part 017 Glossary 01-10-2020Council documentNot publishedView
ARM import application Part 007 Biodiversity 01-10-2020Council documentNot publishedView
ARM import application Part 008 Access and Recreation 01-10-2020Council documentNot publishedView
ARM import application Part 009 Water resources 01-10-2020Council documentNot publishedView
ARM import application Part 010 Cultural heritage 01-10-2020Council documentNot publishedView
ARM import application Part 011 Climate change 01-10-2020Council documentNot publishedView
ARM import application Appendix 2.1 Application search under Hope Cement Works 01-10-2020Council documentNot publishedView
ARM import application Appendix 3.5 Traffic Survey Data 01-10-2020Council documentNot publishedView
ARM import application Appendix 7.3 Habitat Regulations Assessment 01-10-2020Council documentNot publishedView
ARM import application Appendix 5.8 Stakeholder letter b 01-10-2020Council documentNot publishedView
ARM import application Appendix 13.1 Noise Survey 01-10-2020Council documentNot publishedView
ARM import application Appendix 13.2 Vibration Survey 01-10-2020Council documentNot publishedView
ARM import application Appendix 9.1 Flood Risk Assessment 01-10-2020Council documentNot publishedView
ARM import application Appendix 13.5 SEL Calculations 01-10-2020Council documentNot publishedView
ARM import application Appendix 15.1 Socio-economic Impact Assessment 01-10-2020Council documentNot publishedView
ARM import application Chapter 3 figure 70056391-54-0011-A1 Issue 02 - Building 08 - Transfer Tower TT01 - General Arrangement Plans 01-10-2020Council documentNot publishedView
ARM import application Chapter 3 figure 70056391-54-0012-A1 Issue 02 - Building 08 - Transfer Tower TT01 - Elevations 01-10-2020Council documentNot publishedView
ARM import application Chapter 3 figure 70056391-54-0009-A1 Issue 02 - Building 04 - CV01-ST1 - Southern Access Stairs - Plans Sections and Elevations 01-10-2020Council documentNot publishedView
ARM import application Figure 2.2 Location Plan 01-10-2020Council documentNot publishedView
ARM import application Figure 2.4 Designated Areas 01-10-2020Council documentNot publishedView
ARM import application Figures 14.1 to 14.17 01-10-2020Council documentNot publishedView
ARM import application Part 000 Cover and Contents 01-10-2020Council documentNot publishedView
ARM import application Part 014 Traffic 01-10-2020Council documentNot publishedView
Proposed Site Layout 70056391-54-0002-A1 Issue 02 07-10-2020Council documentNot publishedView
Cover Letter from Agent - 07-10-2020Council documentNot publishedView
Existing Site Layout Dwg No 70056391-54-0001-A1 Issue 02 07-10-2020Council documentNot publishedView
Application Form 07-10-2020Council documentNot publishedView
General Site Location Dwg NT14126 100 Figure 2.1 20-10-2020Council documentNot publishedView
Location Plan Dwg NT14126 100 Figure 2.2 20-10-2020Council documentNot publishedView
Proposed Landscape Plan Dwg NT14126 100 Figure 6.44 20-10-2020Council documentNot publishedView
003A Project description [ES chapter 3 amended - table 3.5 additional collumn to link with proposed layout plan] RK 20.10.2020Council documentNot publishedView
Appendix 3.1A ARM Material Unloading Conveying & Storage facilitiesCouncil documentNot publishedView
NT14126 Figure 6.44 Proposed Landscape PlanCouncil documentNot publishedView
70056391-54-0016-A1 Issue 02 - Building 09 - Material Storage and Unloading Facility - General Arrangement - Elevations Sheet 1 of 2 26-10-2020Council documentNot publishedView
70056391-54-0007-A1 Issue 02 - Building 02 - Off-Loading Building Link to Conveyor CV01 - Plans Elevations and Sections 26-10-2020Council documentNot publishedView
70056391-54-0015-A1 Issue 02 - Building 09 - Material Storage and Unloading Facility - General Arrangement Conveyor and Roof Level Plans 26-10-2020Council documentNot publishedView
70056391-54-0017-A1 Issue 02 - Building 09 - Materials Storage and Unloading Facility - General Arrangement Elevations Sheet 2 of 2 26-10-2020Council documentNot publishedView
70056391-54-0018-A1 Issue 01 - Building 09 - Materials Storage and Unloading Facility - General Arrangement Sections 26-10-2020Council documentNot publishedView
70056391-54-0019-A1 Issue 02 - Building 10 - Reclaim Feeder FD02 Conveyor CV10 - Plan and Elevations 26-10-2020Council documentNot publishedView
70056391-54-0020-A1 Issue 02 - Building 11 - Surge Bin B001 - Structure General Arrangement Plans 26-10-2020Council documentNot publishedView
70056391-54-0021-A1 Issue 02 - Building 11 - Surge Bin B001 - Structure General Arrangement Elevations 26-10-2020Council documentNot publishedView
70056391-54-0022-A1 Issue 02 - Building 11 - Surge Bin B001 - Structure General Arrangement Sections 26-10-2020Council documentNot publishedView
70056391-54-0023-A1 Issue 02 - Building 12 - Power and Controls Building - Elevation and Section 26-10-2020Council documentNot publishedView
70056391-55-3202-A1-Issue 03 - Electrical Services - External Lighting - Site Layout 26-10-2020Council documentNot publishedView
70056391-55-3204-A1 Issue 01 - Electrical Drawing - External Lighting - Trackside Amendments 26-10-2020Council documentNot publishedView
Appendix 9.1 Flood Risk Assessment 26-10-2020Council documentNot publishedView
DCC Highways Comments 04-11-2020Council documentNot publishedView
NT14126 100 Figure 2.8 Application boundary[showing full blue line]Council documentNot publishedView
Hathersage Parish Council 09-11-2020Council documentNot publishedView
Tideswell Parish Council consultation response 10-11-2020Council documentNot publishedView
[red line amended to show highway access] NT14126 100 Figure 2.8 Location plan Rev ACouncil documentNot publishedView
NT14126 100 Figure 3.1 Building and overhead conveyors for removalCouncil documentNot publishedView
NT14126 100 Figure 3.2 Proposed Relocation of Contractor CompoundCouncil documentNot publishedView
NT14126 100 Figure 6.1 TopographyCouncil documentNot publishedView
NT14126 100 Figure 6.10 LVIA Viewpoint 7Council documentNot publishedView
NT14126 100 Figure 6.11 LVIA Viewpoint 8Council documentNot publishedView
NT14126 100 Figure 6.12 LVIA Viewpoint 9Council documentNot publishedView
NT14126 100 Figure 6.13 LVIA Viewpoint 10Council documentNot publishedView
NT14126 100 Figure 6.14 LVIA Viewpoint 11Council documentNot publishedView
NT14126 100 Figure 6.15 LVIA Viewpoint 12Council documentNot publishedView
NT14126 100 Figure 6.16 LVIA Viewpoint 13Council documentNot publishedView
NT14126 100 Figure 6.17 LVIA Viewpoint 14Council documentNot publishedView
NT14126 100 Figure 6.18 LVIA Viewpoint 15Council documentNot publishedView
NT14126 100 Figure 6.19 LVIA Viewpoint 16Council documentNot publishedView
NT14126 100 Figure 6.20 LVIA Viewpoint 17Council documentNot publishedView
NT14126 100 Figure 6.21 LVIA Viewpoint 18Council documentNot publishedView
NT14126 100 Figure 6.22 LVIA Viewpoint 19Council documentNot publishedView
NT14126 100 Figure 6.23 LVIA Viewpoint 20Council documentNot publishedView
NT14126 100 Figure 6.24 Viewpoint 1 VisualisationCouncil documentNot publishedView
NT14126 100 Figure 6.25 Viewpoint 2 VisualisationCouncil documentNot publishedView
NT14126 100 Figure 6.26 Viewpoint 3 VisualisationCouncil documentNot publishedView
NT14126 100 Figure 6.27 Viewpoint 4 VisualisationCouncil documentNot publishedView
NT14126 100 Figure 6.28 Viewpoint 5 VisualisationCouncil documentNot publishedView
NT14126 100 Figure 6.29 Viewpoint 6 VisualisationCouncil documentNot publishedView
NT14126 100 Figure 6.3 Landscape Character AreaCouncil documentNot publishedView
P18-451 Figure 7.1 Desk study resultsCouncil documentNot publishedView
P18-451 Figure 7.2 Extended Phase 1 Habitat Survey Results PlanCouncil documentNot publishedView
P18-451 Figure 7.3 Pond locationsCouncil documentNot publishedView
P18-451 Figure 7.5 Habitat enhancement and creation planCouncil documentNot publishedView
NT14126 100 Figure 6.30 Viewpoint 7 VisualisationCouncil documentNot publishedView
NT14126 100 Figure 6.31 Viewpoint 8 VisualisationCouncil documentNot publishedView
NT14126 100 Figure 6.32 Viewpoint 9 VisualisationCouncil documentNot publishedView
NT14126 100 Figure 6.33 Viewpoint 10 VisualisationCouncil documentNot publishedView
NT14126 100 Figure 6.34 Viewpoint 11 VisualisationCouncil documentNot publishedView
NT14126 100 Figure 6.35 Viewpoint 12 VisualisationCouncil documentNot publishedView
NT14126 100 Figure 6.36 Viewpoint 13 VisualisationCouncil documentNot publishedView
NT14126 100 Figure 6.37 Viewpoint 14 VisualisationCouncil documentNot publishedView
NT14126 100 Figure 6.38a Viewpoint 15 Visualisation (Wireframe)Council documentNot publishedView
NT14126 100 Figure 6.38b Viewpoint 15 Visualisation (Photomontage)Council documentNot publishedView
NT14126 100 Figure 6.39a Viewpoint 16 Visualisation (Wireframe)Council documentNot publishedView
NT14126 100 Figure 6.39b Viewpoint 16 Visualisation (Photomontage)Council documentNot publishedView
NT14126 100 Figure 6.4 LVIA Viewpoint 1Council documentNot publishedView
NT14126 100 Figure 6.40 Viewpoint 17 VisualisationCouncil documentNot publishedView
NT14126 100 Figure 6.41 Viewpoint 18 VisualisationCouncil documentNot publishedView
NT14126 100 Figure 6.42 Viewpoint 19 VisualisationCouncil documentNot publishedView
NT14126 100 Figure 6.43a Viewpoint 20 Visualisation (Wireframe)Council documentNot publishedView
NT14126 100 Figure 6.43b Viewpoint 20 Visualisation (Photomontage)Council documentNot publishedView
NT14126 100 Figure 6.5 LVIA Viewpoint 2Council documentNot publishedView
NT14126 100 Figure 6.6 LVIA Viewpoint 3Council documentNot publishedView
NT14126 100 Figure 6.7 LVIA Viewpoint 4Council documentNot publishedView
NT14126 100 Figure 6.8 LVIA Viewpoint 5Council documentNot publishedView
NT14126 100 Figure 6.9 LVIA Viewpoint 6Council documentNot publishedView
Copy of site notice 12-11-2020Council documentNot publishedView
Hope ARM Non Technical SummaryCouncil documentNot publishedView
Landscape consultation.docxCouncil documentNot publishedView
Historic England 23-11-2020Council documentNot publishedView
Bamford Parish Council - 23-11-2020Council documentNot publishedView
Bamford Parish Council response - 23-11-2020Council documentNot publishedView
Environment Agency consultation response 25-11-2020Council documentNot publishedView
Ord I - HEARD - 30-11-2020Council documentNot publishedView
Ord I - HEARD - Annex A2 30-11-2020Council documentNot publishedView
Ord I - HEARD - Annex A4 30-11-2020Council documentNot publishedView
Worsey S & Barr S 02-12-2020 at 14.42pmCouncil documentNot publishedView
High Peak Borough Council Environmental Health - 08-12-2020Council documentNot publishedView
Sutcliffe F and K 08-12-2020Council documentNot publishedView
Robinson J - 10-12-2020Council documentNot publishedView
Edale Parish Council 14-12-2020Council documentNot publishedView
Whiting T 14-12-2020Council documentNot publishedView
Vincent L - 15-12-2020Council documentNot publishedView
Bradwell Parish Council 14-12-2020Council documentNot publishedView
Hope Valley Climate Action 14-12-2020Council documentNot publishedView
Edmonds ML 15-12-2020Council documentNot publishedView
PDNPA-WA-Climate Change Policy Compliance s73 and ARM - 17 Dec 2020v2 comment removedCouncil documentNot publishedView
Madeley J & Cooper W 23-12-2020Council documentNot publishedView
Email clarifying 24 hour operation 14.01.21 RK-HKCouncil documentNot publishedView
NT14126 100 Figure 6.2 Zone of Theoretical Visibility of Proposed Storage BuildingCouncil documentNot publishedView
Officer email confirming no comment from rangers on and 1020-0908Council documentNot publishedView
cultural heritage BE comments 04-01-21Council documentNot publishedView
vibration comments EHO 16-12-21Council documentNot publishedView
SI report ARM application SI reducedCouncil documentNot publishedView
CC1 building emissionsCouncil documentNot publishedView
[amended to remove badger info]P18-451 Appendix 7.1 Ecology Baseline Report revised feb 2021Council documentNot publishedView
Environment Agency comments 15-02-2021Council documentNot publishedView
S33 - 18-03-2021Council documentNot publishedView
P18-451 Figure 7.4 Restoration phase planCouncil documentNot publishedView
Variation Notice EPR-BP3731VJ-V006Council documentNot publishedView
2018-09-21 WM2-3 for CoP F PDFCouncil documentNot publishedView
Appendix 11.2 CO2 Emissions summary for Hope April 2021Council documentNot publishedView
GHGE PermitCouncil documentNot publishedView
PDNPA-WA-Climate Change Policy Compliance s73 and ARM - 17 Dec 2020 HK numbering.docxCouncil documentNot publishedView
0041 Knighton hkCouncil documentNot publishedView
012 Air Quality April 2021Council documentNot publishedView
011 Climate change April 2021Council documentNot publishedView
2014 10 01 Waste code of practice plus annexesCouncil documentNot publishedView
DCC Flod Risk Team, Response - 08-06-2021Council documentNot publishedView
Extension of time 28/02/22Council documentNot publishedView
Appendix 13.2 Vibration Survey - 24-12-2021Council documentNot publishedView
Appendix 13.3 Weather October 2019 - 24-12-2021Council documentNot publishedView
Appendix 13.4 Train Movements - 24-12-2021Council documentNot publishedView
Appendix 13.5 SEL Calculations - 24-12-2021Council documentNot publishedView
Appendix 13.6 2019 Branch Line movements - 24-12-2021Council documentNot publishedView
Appendix 13.8 Noise Survey Notes - 24-12-2021Council documentNot publishedView
Figure 13.1 Noise Monitoring Location Plan - 24-12-2021Council documentNot publishedView
Figure 13.2A-Predicted ARM Plant day time noise.plt - 24-12-2021Council documentNot publishedView
Figure 13.3A - ARM Night-time noise contours.plt - 24-12-2021Council documentNot publishedView
Figure 13.4A-Construction Noise.pltCouncil documentNot publishedView
Figure 13.5A- Exisiting branchline noise.plt - 24-12-2021Council documentNot publishedView
Figure 13.6A- Proposed Operations.plt - 24-12-2021Council documentNot publishedView
Figure 13.7A- Proposed Operations - Point Removed .plt - 24-12-2021Council documentNot publishedView
Figure 13.8A - Proposed Operations - With Barrier .plt - 24-12-2021Council documentNot publishedView
Figure 13.9A- Proposed Mitigation for extraction fan .plt - 24-12-2021Council documentNot publishedView
Hope ARM Non Technical Summary 23 12 21 - 24-12-2021Council documentNot publishedView
NT14126 100 Figure 3.3 Section of electricity line undergrounded - 24-12-2021Council documentNot publishedView
Soil test results for mitigation habitat area - 24-12-2021Council documentNot publishedView
006A Landscape and Visual Impact Assessment - 24-12-2021Council documentNot publishedView
012A Air Quality - 24-12-2021Council documentNot publishedView
013A Noise and Vibration final - 24-12-2021Council documentNot publishedView
Appendix 13.1 Noise Survey - 24-12-2021Council documentNot publishedView
003B Project Description - 24-12-2021Council documentNot publishedView
Copy of site notice - 26-01-2022Council documentNot publishedView
HEARDs Comments 27-01-2022Council documentNot publishedView
Derbyshire County Council Comments 31-01-2022Council documentNot publishedView
High Peak Borough Council Comments 07-02-2022Council documentNot publishedView
Health & Safety Executive 16-02-2022Council documentNot publishedView
Tideswell Parish Council consultation response 21-02-2022Council documentNot publishedView
Edale Parish Council - 22-02-2022Council documentNot publishedView
Sutcliffe K & S 01-03-2022Council documentNot publishedView
Hope with Aston Parish Council response - 02-03-2022Council documentNot publishedView
Historic England Comments - 08-03-2022Council documentNot publishedView
archaeological consultation responseCouncil documentNot publishedView
Breedon response to DCC HighwaysCouncil documentNot publishedView
DCC Highways Response 17.03.22Council documentNot publishedView
DCC Highways Response 17.03.22Council documentNot publishedView
DCC Flood Risk MAnagement - 21-03-2022Council documentNot publishedView
Specification for PFA Sources to Breedon Cement, Hope WorksCouncil documentNot publishedView
Noise Technical Note – Applicant response to queries raised by EHOCouncil documentNot publishedView
High Peak BC EHO ResponseCouncil documentNot publishedView
High Peak BC Environmental Health Response 07-04-2022Council documentNot publishedView
Figure 7.5 Rev A Habitat Enhancement and Creation PlanCouncil documentNot publishedView
Figure 7.4 Rev A Restoration Phase PlanCouncil documentNot publishedView
Figure 7.5 Habitat Enhancement and Creation Plan Rev ACouncil documentNot publishedView
Figure 7.4 Restoration Phase Plan Rev ACouncil documentNot publishedView
Construction Traffic Likely Routes E-mailCouncil documentNot publishedView
Construction Traffic Likely RoutesCouncil documentNot publishedView
PDNPA Ecology ResponseCouncil documentNot publishedView
PDNPA Habitat Regulations AssessmentCouncil documentNot publishedView
Planning Committee ReportCouncil documentNot publishedView
Decision Notice - 11-11-2022Council documentNot publishedView
Reg 30 SoS Notification E-mailCouncil documentNot publishedView
Email from Helen Kennedy - 19-04-2024Council documentNot publishedView
Rail Upgrades - Extended Shift Requirements 19-04-2024Council documentNot publishedView

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Decided: GRANTED CONDITIONALLY
Copy of site notice 12-11-2020 Variation Notice EPR-BP3731VJ-V006 Copy of site notice - 26-01-2022 Decision Notice - 11-11-2022
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.