Council planning record

Change of use of the site for storage

Riverside Yard, Romsey Road, Ower, SO51 6AF

This application was decided on 01 Apr 2026.Reference: 25/01499FULLNew Forest National Park Authority

Last published check: 3 Oct 2026, 10:06. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Press notice start date

    Published milestoneCouncil source
  4. Registration date

    Published milestoneCouncil source
  5. Site notice date

    Published milestoneCouncil source
  6. Valid date

    Published milestoneCouncil source
  7. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Dispatch date

    Published milestoneCouncil source
  11. Decision date

    Published milestoneCouncil source
  12. Extension date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
This application was decided on 01 Apr 2026.
Application type
Full Application
Received
25 Dec 2025
Validated
9 Jan 2026
Determination deadline
4 Mar 2026
Local authority
New Forest National Park Authority

Application overview

Change of use of the site for storage

Proposal details

Reference
25/01499FULL
Alternative references
PP-14585968
Development type
Conservation Area Consent Demolition
Parish
Copythorne Parish Council
Agent
Mr Mark Sennitt
UPRN
10097103254

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Riverside Yard, Romsey Road, Ower, SO51 6AF

This record has no verified map location.

Documents 14 of 14

DocumentPublishedAction
Existing Site Survey (Page 2)Drawing29 Dec 2025View
Existing Site Survey (Page 1)Drawing29 Dec 2025View
Sustainability StatementBackGround Papers29 Dec 2025View
Preliminary Ecological AppraisalBackGround Papers29 Dec 2025View
Site Block PlanDrawing29 Dec 2025View
Application for Planning PermissionApplication Form29 Dec 2025View
2025 Flood Risk AssessmentBackGround Papers6 Jan 2026View
Highway Technical NoteBackGround Papers6 Jan 2026View
Site Location PlanDrawing8 Jan 2026View
Planning StatementBackGround Papers14 Jan 2026View
Parish Briefing NoteParish Briefing Note3 Feb 2026View
Officer ReportOfficers Report1 Apr 2026View
DecisionDecision1 Apr 2026View
Riverside Yard Officer ReportOfficers Report1 Apr 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Grant Subject to Conditions
Decision
Planning conditions
  1. No external lighting shall be installed on the site unless details of such proposals have been submitted to and approved in writing by the New Forest National Park Authority. Reason: To protect the amenities of the area in accordance with Policies DP2 and SP15 of the adopted New Forest National Park Local Plan 2016 - 2036 (August 2019).
  2. Development shall only be carried out in accordance with drawings: Rear Site – Red Boundary – Reference 2451-B10-12 Site Location Plan – Reference DD-SW-01 Rev A Site Block Plan – Reference DD-SW-02 Rev B No alterations to the approved development shall be made unless otherwise agreed in writing by the New Forest National Park Authority. Reason: To ensure an acceptable appearance of the building in accordance with Policies SP16, SP17, DP18 and DP2 of the adopted New Forest National Park Local Plan 2016- 2036 (August 2019).
  3. The Authority has considered the application in relation to its adopted Local Plan, the National Planning Policy Framework and any other relevant material planning consideration and has confirmed to the applicant or their agent that the development is compliant and does not harm the character and appearance or amenities of the area.
  4. The applicant is reminded that, under the Conservation of Habitats and Species Regulations 2017 (as amended) and the Wildlife and Countryside Act 1981 (as amended), it is an offence to (amongst other things): deliberately capture, disturb, injure, or kill great crested newts; damage or destroy a breeding or resting place; intentionally or recklessly obstruct access to a resting or sheltering place. Planning permission for a development does not provide a defence against prosecution under this legislation. Should great crested newts be found at any stage of the development works, then all works should cease, and a professional and/or suitably qualified and experienced ecologist (or Natural England) should be contacted for advice on any special precautions before continuing, including the need for a licence. If at any point during construction works any great crested newts are identified, then the following instructions must be strictly adhered to: Stop all works immediately and leave the area Inform an ecologist immediately who will provide further guidance / instructions Do not try to handle or rescue a great crested newt Do not resume construction works until advised it is safe to do so by an ecologist It should be noted that if an individual great crested newt is found at any point during the works, a European Protected Species Licence (EPSL) or District Licence (DL) may be required to permit works that would potentially cause disturbance and otherwise commit an offence under the relevant legislation. If the applicant wishes to completely avoid any risks relating to great crested newts, they have the option to enquire for the New Forest National Park Authority’s District Licence, which provides full legal cover for any impacts to great crested newts and therefore removes the risk of having to stop works if great crested newts are found on site. More details on the District Licensing Scheme operated by the council can be found at https://naturespaceuk.com/.
  5. The hedgerow, as idnetified on Appendix 1 (Survey/Habitat map) of the approved Ecology Survey (Arbtech 28th November 2025), shall be retained in perpetuity and maintained at a minimum height of 1.2 metres and minimum width of 0.5. Reason: To ensure the appearance and setting of the development is satisfactory and to preserve local ecological interests and to comply with Policies DP2 and SP6 of the adopted New Forest National Park Local Plan 2016 - 2036 (August 2019).
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.