Scotland · Local authority

Na h-Eileanan Siar planning applications

PlanningTrack collects planning applications and decisions from the public planning register of Na h-Eileanan Siar. Search an address, application reference or proposal. Official Na h-Eileanan Siar website

Collected application statistics

Collected records · All available dates
12,187Searchable applications
79Recorded as pending
99%Approval rate · 9,606 approved or refused records
141Refused applications

9,465 approved · 141 refused · 0 withdrawn. Received dates in our records: 23 Dec 1993 to 23 Oct 2026. Most recent record check: 24 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas4 mapped area records
Article 4 direction areasBoundary dataset not connected

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.

More application records

  1. Decided21/00605/PPD

    Erect front extension

    2 Lower Sandwick Sandwick Isle Of Lewis HS2 0AE

    Received 3 Dec 2021
  2. Decided21/00606/PPD

    Erect agricultural building and create access

    Agricultural Building 26 Coll Coll Isle Of Lewis

    Received 6 Dec 2021
  3. Decided21/00607/PPD

    Erect Steel Framed Shed

    Shell Bay House Liniclate Creagorry Isle Of Benbecula HS7 5PJ

    Received 6 Dec 2021
  4. Decided21/00608/PPD

    Resubmission - 21/00232/PPD Erect dwelling and garage with associated access, parking and drainage

    36 Borve Berneray Isle Of North Uist

    Received 6 Dec 2021
  5. Decided21/00609/PPD

    Site caravan pod for holiday let

    Caravan Pod 12 Guershader Laxdale Isle Of Lewis

    Received 6 Dec 2021
  6. Decided21/00610/FFSCSC

    Install a feed system and 10 circular pens of 160m circumference or alternativly 5 or 6 pens of 200m circumference

    Stulaigh Island South Fish Farm Locheynort Isle Of South Uist

    Received 9 Dec 2021
  7. Decided21/00611/PPD

    Construct thatched cottage on the footprint of the former 'Angmar Cottage' and associated vehicle access, foul and surface water drainage and solar pv ground mounted array

    Angmar Cottage Malaclate Sollas Isle Of North Uist

    Received 9 Dec 2021
  8. Decided21/00612/PPD

    Erect house with associated access and infrastructure

    Ceol Culla Nunton Balivanich Isle Of Benbecula

    Received 9 Dec 2021
  9. Decided21/00613/PPD

    Site pre-converted steel cabin 32ft x 10ft to use as gift shop

    The Chalet Seaview 1 Ahmor Lochmaddy Isle Of North Uist HS6 5BW

    Received 9 Dec 2021
  10. Decided21/00614/PPD

    Installation of dosing kiosk, safety shower and associated apparatus

    Scottish Water Sewage Treatment Works Holm Point Sandwick Isle Of Lewis HS2 0AQ

    Received 10 Dec 2021
  11. Decided21/00615/PPP

    Erect house. Create access.

    3C Sheshader Point Isle Of Lewis

    Received 10 Dec 2021
  12. Decided21/00616/TEL

    Install 3 No. Antennas, 2 No. Cabinets, 1 No. Face Frame

    Aerial And Cable Clettraval Hosta Tigharry Isle Of North Uist

    Received 10 Dec 2021
  13. Decided21/00617/PPD

    Removal of Portakabin and erection of extension to shorebase

    Base Shed Breasclete Isle Of Lewis

    Received 10 Dec 2021
  14. Decided21/00618/PPD

    Erect dwelling with associated vehicular access, foul and surface water drainage and site solar pv array mounted on the south facing garage roof.

    2 Clachan Na Luib Clachan Locheport Isle Of North Uist

    Received 13 Dec 2021
  15. Decided21/00621/PPD

    Renewal of planning permission 16/00607 for siting of a container and to site an additional container. External finish is dark green metal sheeting.

    Storage Container Callicvol Ness Isle Of Lewis

    Received 14 Dec 2021
  16. Decided21/00622/PPD

    Erect house. Install air source heat pump.

    12A Garrabost Point Isle Of Lewis

    Received 14 Dec 2021
  17. Decided21/00623/PPD

    Site portacabin to use as office

    Shore Base Kallin Harbour Kallin Grimsay Isle Of North Uist

    Received 15 Dec 2021
  18. Decided21/00624/PPD

    Installation of roadside safety barrier.

    Scottish Water Water Treatment Works Northbay Inn Northbay Isle Of Barra

    Received 15 Dec 2021
  19. Decided21/00625/PPD

    Installation of roadside safety barrier.

    Scottish Water Water Treatment Works Northbay Inn Northbay Isle Of Barra

    Received 15 Dec 2021
  20. Decided21/00626/DEMPA

    Demolish house

    4 Swordale Point Isle Of Lewis HS2 0BP

    Received 16 Dec 2021
  21. Decided21/00627/FFSCR

    Removal of existing 20 x 100 metre cages and replacement with 8 x 160 metre cages within boundary of existing fish farm

    Caolas A Deas Loch Shell Eishken Lochs Isle Of Lewis

    Received 16 Dec 2021
  22. Decided21/00629/PPD

    Erect single storey dwelling with associated services

    13B Tigharry Isle Of North Uist

    Received 16 Dec 2021
  23. Unknown21/00631/PANSCR

    Construction of a High Voltage Direct Current Converter Station and ancillary Infrastructure (Incorporating a 132kv/33kv Substation)

    Area 3 Arnish Isle Of Lewis

    Received 17 Dec 2021
  24. Decided21/00632/AGRIC

    Erect agricultural building

    Agricultural Building 19 North Bragar Bragar Isle Of Lewis

    Received 17 Dec 2021

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Get emailed about new planning applications in Na h-Eileanan Siar

Area alerts send a daily or weekly email with new applications and decisions near a postcode, filtered by project type. £29 a month, up to 3 areas. Records are limited to the councils we collect.

Set up an area alert

Researching a proposal in Na h-Eileanan Siar

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Na h-Eileanan Siar, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage