Construction, operation and decommissioning of onshore electricity transmission infrastructure associated with the Spiorad na Mara Offshore Windfarm, comprising: up to 12 electricity cables and associated transmission joint bays (TJBs) to the landfall point; up to two onshore substations (one located at landfall and one to the southwest of Stornoway); underground electricity cables and associated infrastructure connecting the TJBs and onshore substation(s) with the SSEN Lewis Hub; temporary and permanent access roads and tracks; and associated access, ancillary infrastructure and works. [Note: The period for representations to be submitted to Comhairle nan Eilean Siar closed on 12 August 2026]

Onshore Transmission Works Spiorad Na Mara Offshore Wind Farm Barvas Isle Of Lewis

Awaiting decisionReference: 26/00167/PPDMNa h-Eileanan Siar

Last published check: 21 Oct 2026, 17:29. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Environmental Impact Assessment Received

    Published milestoneCouncil source
  2. Application Received Date

    Published milestoneCouncil source
  3. Application Validated Date

    Published milestoneCouncil source
  4. Standard Consultation Date

    Published milestoneCouncil source
  5. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  6. Last Advertised In Press Date

    Published milestoneCouncil source
  7. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Agreed Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Determination Deadline

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Awaiting decision
Application type
Planning Permission (Detailed) Maj-Nat
Received
8 May 2026
Validated
2 Jun 2026
Determination deadline
18 Dec 2026
Local authority
Na h-Eileanan Siar

Application overview

Construction, operation and decommissioning of onshore electricity transmission infrastructure associated with the Spiorad na Mara Offshore Windfarm, comprising: up to 12 electricity cables and associated transmission joint bays (TJBs) to the landfall point; up to two onshore substations (one located at landfall and one to the southwest of Stornoway); underground electricity cables and associated infrastructure connecting the TJBs and onshore substation(s) with the SSEN Lewis Hub; temporary and permanent access roads and tracks; and associated access, ancillary infrastructure and works. [Note: The period for representations to be submitted to Comhairle nan Eilean Siar closed on 12 August 2026]

Proposal details

Reference
26/00167/PPDM
Alternative references
100739510-001
Ward
An Taobh Siar Agus Nis

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Onshore Transmission Works Spiorad Na Mara Offshore Wind Farm Barvas Isle Of Lewis

This record has no verified map location.

View council map

Documents 193 of 193

DocumentPublishedAction
FORESTRY - RESPONSEConsultation · PDF16 Sept 2026View
FLOOD RISK - RESPONSEConsultation · PDF7 Sept 2026View
REPRESENTATION 1028Other · PDF7 Sept 2026View
REPRESENTATION 1045Other · PDF7 Sept 2026View
REPRESENTATION 1053Other · PDF7 Sept 2026View
(85-128) REPRESENTATIONS LIST - AS AT 03.09.26Other · PDF3 Sept 2026View
(798-1047) REPRESENTATIONS LIST - AS AT 03.09.26Other · PDF3 Sept 2026View
(589-797) REPRESENTATIONS LIST - AS AT 03.09.26Other · PDF3 Sept 2026View
(350-588) REPRESENTATIONS LIST - AS AT 03.09.26Other · PDF3 Sept 2026View
(326-349) REPRESENTATIONS LIST - AS AT 03.09.26Other · PDF3 Sept 2026View
(176-325) REPRESENTATIONS LIST - AS AT 03.09.26Other · PDF3 Sept 2026View
(135-175) REPRESENTATIONS LIST - AS AT 03.09.26Other · PDF3 Sept 2026View
(129-134) REPRESENTATIONS LIST - AS AT 03.09.26Other · PDF3 Sept 2026View
(1048-1210) REPRESENTATIONS LIST - AS AT 03.09.26Other · PDF3 Sept 2026View
(01-84) REPRESENTATIONS LIST - AS AT 03.09.26Other · PDF3 Sept 2026View
NATURE.SCOT - RESPONSEConsultation · PDF14 Aug 2026View
ENVIRONMENTAL HEALTH - RESPONSEConsultation · PDF13 Aug 2026View
ROADS - RESPONSEConsultation · PDF13 Aug 2026View
OHFT - RESPONSEConsultation · PDF13 Aug 2026View
PUBLIC INFORMATION NOTE 3Other · PDF13 Aug 2026View
SEPA - RESPONSEConsultation · PDF12 Aug 2026View
HES - RESPONSEConsultation · PDF12 Aug 2026View
ARCHAEOLOGY - RESPONSEConsultation · PDF12 Aug 2026View
SSEN TRANSMISSION - RESPONSEConsultation · PDF12 Aug 2026View
STORNOWAY COMMUNITY COUNCIL - RESPONSEConsultation · PDF11 Aug 2026View
UIG COMMUNITY COUNCIL - RESPONSEConsultation · PDF11 Aug 2026View
LANDSCAPE - EXTERNAL CONSULTANT RESPONSEConsultation · PDF11 Aug 2026View
RSPB - RESPONSEConsultation · PDF11 Aug 2026View
TRANSPORT SCOTLAND - RESPONSEConsultation · PDF10 Aug 2026View
TRANSPORT SCOTLAND - RESPONSE ON DEVELOPMENT AFFECTING TRUNK ROADS AND SPECIAL RConsultation · PDF10 Aug 2026View
SANDWICK COMMUNITY COUNCIL - RESPONSEConsultation · PDF10 Aug 2026View
SHAWBOST COMMUNITY COUNCIL - RESPONSEConsultation · PDF10 Aug 2026View
ECONOMIC DEVELOPMENT - RESPONSEConsultation · PDF7 Aug 2026View
ECONOMIC DEVELOPMENT - EXTERNAL CONSULTANT RESPONSEConsultation · PDF7 Aug 2026View
NORTH LOCHS COMMUNITY COUNCIL - RESPONSEConsultation · PDF7 Aug 2026View
BUILDING STANDARDS - RESPONSEConsultation · PDF29 Jul 2026View
SSEN - RESPONSEConsultation · PDF3 Jul 2026View
HIAL - RESPONSEConsultation · PDF1 Jul 2026View
OFCOM - RESPONSEConsultation · PDF26 Jun 2026View
REPRESENTATION 25Other · PDF25 Jun 2026View
BRITISH HORSE SOCIETYConsultation · PDF24 Jun 2026View
LARGE VEHICLE GUIDANCEConsultation · PDF24 Jun 2026View
GATES GUIDANCEConsultation · PDF24 Jun 2026View
EXTENSION TO DETERMINATION PERIODOther · PDF24 Jun 2026View
PUBLIC INFORMATION NOTE 2Other · PDF24 Jun 2026View
MOD - RESPONSEConsultation · PDF19 Jun 2026View
MET OFFICE RESPONSEConsultation · PDF16 Jun 2026View
SCOTTISH WATER - RESPONSEConsultation · PDF16 Jun 2026View
NATS RESPONSEConsultation · PDF12 Jun 2026View
EG ADVERTOther · PDF12 Jun 2026View
PUBLIC INFORMATION NOTE 1Other · PDF11 Jun 2026View
SG ADVERTOther · PDF11 Jun 2026View
PRESS ADVERT - PRESS PUBLICATION DATE 11.06.26Other · PDF9 Jun 2026View
LIST OF NOTIFIED NEIGHBOURSOther · PDF9 Jun 2026View
APPENDIX - OFFSHORE EIA REPORT (LINK TO)Other · PDF8 Jun 2026View
PLANNING APPLICATION FORMApplication Form · PDF2 Jun 2026View
02 SITE PLAN SHEETS 1-13Drawing · PDF2 Jun 2026View
01 LOCATION PLANDrawing · PDF2 Jun 2026View
04 LANDFALL SUBSTN LAYOUTDrawing · PDF2 Jun 2026View
11 GRID SUBSTN LAYOUTDrawing · PDF2 Jun 2026View
10 GRID SUBSTN ELEVATIONSDrawing · PDF2 Jun 2026View
05 LANDFALL SUBSTN 138KV BLDG ELEVATIONS & PLANDrawing · PDF2 Jun 2026View
06 LANDFALL SUBSTN 275 KV BLDG ELEVATIONS & PLANDrawing · PDF2 Jun 2026View
08 GRID SUBSTN 275 KV BLDG ELEVATIONS & PLANDrawing · PDF2 Jun 2026View
09 GRID SUBSTN 400 KV BLDG ELEVATIONS & PLANDrawing · PDF2 Jun 2026View
NON TECHNICAL SUMMARYEIA Report - Vol 1 · PDF11 May 2026View
EIA CHAPTER 01 - INTRODUCTIONEIA Report - Vol 2 · PDF11 May 2026View
EIA CHAPTER 02 - POLICY AND LEGISLATIVE CONTEXTEIA Report - Vol 2 · PDF11 May 2026View
EIA CHAPTER 03 - PROJECT DESCRIPTIONEIA Report - Vol 2 · PDF11 May 2026View
EIA CHAPTER 04 - CONSIDERATION OF ALTERNATIVESEIA Report - Vol 2 · PDF11 May 2026View
EIA CHAPTER 05 - APPROACH TO ENVIRONMENTAL IMPACT ASSESSMENTEIA Report - Vol 2 · PDF11 May 2026View
EIA CHAPTER 06 - SOCIO ECONOMICSEIA Report - Vol 2 · PDF11 May 2026View
EIA CHAPTER 07 - CLIMATE RESILIENCEEIA Report - Vol 2 · PDF11 May 2026View
EIA CHAPTER 08 - GREENHOUSE GASESEIA Report - Vol 2 · PDF11 May 2026View
EIA CHAPTER 09 - LVIAEIA Report - Vol 2 · PDF11 May 2026View
EIA CHAPTER 10 - ONSHORE ECOLOGY AND ORNITHOLOGYEIA Report - Vol 2 · PDF11 May 2026View
EIA CHAPTER 11 - ONSHORE ARCHAEOLOGY AND CULTURAL HERITAGEEIA Report - Vol 2 · PDF11 May 2026View
EIA CHAPTER 12 - TRAFFIC AND ACCESSEIA Report - Vol 2 · PDF11 May 2026View
EIA CHAPTER 13 - PEAT, GEOLOGY, SOILS AND CONTAMINATED LANDEIA Report - Vol 2 · PDF11 May 2026View
EIA CHAPTER 14 - HYDROLGY AND HYDROGEOLOGYEIA Report - Vol 2 · PDF11 May 2026View
EIA CHAPTER 15 - AIRBORNE NOISE AND VIBRATIONEIA Report - Vol 2 · PDF11 May 2026View
EIA CHAPTER 16 - AIR QUALITYEIA Report - Vol 2 · PDF11 May 2026View
EIA CHAPTER 17 - LAND USEEIA Report - Vol 2 · PDF11 May 2026View
EIA CHAPTER 18 - HUMAN HEALTHEIA Report - Vol 2 · PDF11 May 2026View
EIA CHAPTER 19 - SIGNIFICANT RESIDUAL EFFECTSEIA Report - Vol 2 · PDF11 May 2026View
EIA CHAPTER 20 - SCHEDULE OF EIAR COMMITMENTSEIA Report - Vol 2 · PDF11 May 2026View
EIA CHAPTER 21 - COMBINED AND WHOLE PROJECT ASSESSMENTEIA Report - Vol 2 · PDF11 May 2026View
EIA FIGURES FOR CHAPTER 01 - INTRODUCTIONEIA Report - Vol 3 · PDF11 May 2026View
EIA FIGURES FOR CHAPTER 03 - PROJECT DESCRIPTIONEIA Report - Vol 3 · PDF11 May 2026View
EIA FIGURES FOR CHAPTER 04 - CONSIDERATION OF ALTERNATIVESEIA Report - Vol 3 · PDF11 May 2026View
EIA FIGURES FOR CHAPTER 05 - APPROACH TO ENVIRONMENTAL IMPACT ASSESSMENTEIA Report - Vol 3 · PDF11 May 2026View
EIA FIGURES FOR CHAPTER 06 - SOCIO ECONOMICSEIA Report - Vol 3 · PDF11 May 2026View
EIA FIGURES FOR CHAPTER 10 - ONSHORE ECOLOGY AND ORNITHOLOGYEIA Report - Vol 3 · PDF11 May 2026View
EIA FIGURES FOR CHAPTER 11 - ONSHORE ARCHAEOLOGY AND CULTURAL HERITAGEEIA Report - Vol 3 · PDF11 May 2026View
EIA FIGURES FOR CHAPTER 12 - TRAFFIC AND ACCESSEIA Report - Vol 3 · PDF11 May 2026View
EIA FIGURES FOR CHAPTER 13 - PEAT, GEOLOGY, SOILS AND CONTAMINATED LAND PART 1EIA Report - Vol 3 · PDF11 May 2026View
EIA FIGURES FOR CHAPTER 13 - PEAT, GEOLOGY, SOILS AND CONTAMINATED LAND PART 2EIA Report - Vol 3 · PDF11 May 2026View
EIA FIGURES FOR CHAPTER 13 - PEAT, GEOLOGY, SOILS AND CONTAMINATED LAND PART 3EIA Report - Vol 3 · PDF11 May 2026View
EIA FIGURES FOR CHAPTER 13 - PEAT, GEOLOGY, SOILS AND CONTAMINATED LAND PART 4EIA Report - Vol 3 · PDF11 May 2026View
EIA FIGURES FOR CHAPTER 14 - HYDROLOGY & HYDROGEOLOGYEIA Report - Vol 3 · PDF11 May 2026View
EIA FIGURES FOR CHAPTER 15 - AIRBORNE NOISE AND VIBRATIONEIA Report - Vol 3 · PDF11 May 2026View
EIA FIGURES FOR CHAPTER 16 - AIR QUALITYEIA Report - Vol 3 · PDF11 May 2026View
EIA FIGURES FOR CHAPTER 17 - LAND USE, TOURISM AND RECREATIONEIA Report - Vol 3 · PDF11 May 2026View
09.31_VP54_CREED BRIDGE CAR PARKEIA Report - Vol 4 · PDF11 May 2026View
09.30 RATHAD A BHUNAEIA Report - Vol 4 · PDF11 May 2026View
09.29_VP52 PENTLAND ROAD WESTEIA Report - Vol 4 · PDF11 May 2026View
09.28_VP51_MARYBANK PICNIC BENCHESEIA Report - Vol 4 · PDF11 May 2026View
09.27_VP50 CNOC NA CROIC SOUTHERN PATHEIA Report - Vol 4 · PDF11 May 2026View
09.26_VP49_A859 CREED ENTERPRISE PARKEIA Report - Vol 4 · PDF11 May 2026View
09.25_VP48 ARNISH ROADEIA Report - Vol 4 · PDF11 May 2026View
09.24_VP47 PENTLAND ROAD MARYBANKEIA Report - Vol 4 · PDF11 May 2026View
09.23_VP46_A859/B897 JUNCTION WEST OF STORNOWAEIA Report - Vol 4 · PDF11 May 2026View
09.22_VP45 LEWIS WAR MEMORIALEIA Report - Vol 4 · PDF11 May 2026View
09.21_VP21_A857 INLAND SOUTH OF BARVASEIA Report - Vol 4 · PDF11 May 2026View
09.20_VP44 MORVEN MINOR ROADEIA Report - Vol 4 · PDF11 May 2026View
09.19_VP43 DRUIM NAN CARNANEIA Report - Vol 4 · PDF11 May 2026View
09.18_VP13 BARVASEIA Report - Vol 4 · PDF11 May 2026View
09.17_VP11 NORTH OF BRUEEIA Report - Vol 4 · PDF11 May 2026View
09.16_VP10 BARVAS BEACHEIA Report - Vol 4 · PDF11 May 2026View
09.15_VP9 UPPER BARVASEIA Report - Vol 4 · PDF11 May 2026View
09.14_VP8 UPPER BARVAS CEMETERYEIA Report - Vol 4 · PDF11 May 2026View
09.13_VP7 CLACH AN TRUSEILEIA Report - Vol 4 · PDF11 May 2026View
09.12_VP5 SHADEREIA Report - Vol 4 · PDF11 May 2026View
APPENDIX A16.1 DUST IMPACT ASSESSMENT, TRAFFIC MODEL INPUTS AND RESULTSEIA Report - Vol 4 · PDF11 May 2026View
APPENDIX A15.5 OPERATIONAL NOISE ASSESSMENTEIA Report - Vol 4 · PDF11 May 2026View
APPENDIX A15.4 CONSTRUCTION TRAFFIC NOISE ASSESSMENTEIA Report - Vol 4 · PDF11 May 2026View
APPENDIX A15.3 CONSTRUCTION NOISE AND VIBRATION ASSESSMENTEIA Report - Vol 4 · PDF11 May 2026View
APPENDIX A15.2 BASELINE NOISE SURVEYEIA Report - Vol 4 · PDF11 May 2026View
APPENDIX A15.1 LEGISLATION, POLICIES, AND PLANS AND GUIDANCEEIA Report - Vol 4 · PDF11 May 2026View
APPENDIX A14.3 SCHEDULE OF WATERCOURSE CROSSINGSEIA Report - Vol 4 · PDF11 May 2026View
APPENDIX A14.2 GDWTE ASSESSMENTEIA Report - Vol 4 · PDF11 May 2026View
APPENDIX A14.1 FLOOD RISK ASSESSMENTEIA Report - Vol 4 · PDF11 May 2026View
APPENDIX A13.2 PRELIMINARY GEO-ENVIRONMENTAL RISK ASSESSMENTEIA Report - Vol 4 · PDF11 May 2026View
APPENDIX A13.1 PLHRA_WEBSITE LINKEIA Report - Vol 4 · PDF11 May 2026View
APPENDIX A12.1 ABNORMAL LOAD ROUTE ASSESSMENTEIA Report - Vol 4 · PDF11 May 2026View
APPENDIX A11.5 ONSHORE OUTLINE WRITTEN SCHEME OF INVESTIGATIONEIA Report - Vol 4 · PDF11 May 2026View
APPENDIX A11.4 TRIAL TRENCHING REPORTEIA Report - Vol 4 · PDF11 May 2026View
APPENDIX A11.3 CULTURAL HERITAGE BASELINE REPORTEIA Report - Vol 4 · PDF11 May 2026View
APPENDIX A11.2 GAZETTEEREIA Report - Vol 4 · PDF11 May 2026View
APPENDIX A11.1 CULTURAL HERITAGE LEGISLATION, POLICIES, PLANS AND GUIDANCEEIA Report - Vol 4 · PDF11 May 2026View
APPENDIX A10.7 HABITAT LOSS RATIONALE AND CALCULATIONSEIA Report - Vol 4 · PDF11 May 2026View
APPENDIX A10.6 SCREENING OF ECOLOGICAL FEATURES RATIONALEEIA Report - Vol 4 · PDF11 May 2026View
APPENDIX A10.5 ONSHORE AQUATIC HABITAT SURVEYEIA Report - Vol 4 · PDF11 May 2026View
APPENDIX A10.4 ORNITHOLOGY TECHNICAL REPORT YEAR 2EIA Report - Vol 4 · PDF11 May 2026View
APPENDIX A10.3 ORNITHOLOGY TECHNICAL REPORT YEAR 1EIA Report - Vol 4 · PDF11 May 2026View
APPENDIX A10.2 HABITATS AND VEGETATION SURVEY REPORTEIA Report - Vol 4 · PDF11 May 2026View
APPENDIX A10.2 HABITATS AND VEGETATION SURVEY REPORT ANNEXES PART 3EIA Report - Vol 4 · PDF11 May 2026View
APPENDIX A10.2 HABITATS AND VEGETATION SURVEY REPORT ANNEXES PART 2EIA Report - Vol 4 · PDF11 May 2026View
APPENDIX A10.2 HABITATS AND VEGETATION SURVEY REPORT ANNEXES PART 1EIA Report - Vol 4 · PDF11 May 2026View
APPENDIX A10.1 ECOLOGICAL DESK STUDYEIA Report - Vol 4 · PDF11 May 2026View
APPENDIX A09.3 COLOUR STUDYEIA Report - Vol 4 · PDF11 May 2026View
APPENDIX A09.2 FIGURES AND VISUALISATIONS PART 1EIA Report - Vol 4 · PDF11 May 2026View
APPENDIX A09.2 FIGURES AND VISUALISATIONS PART 2EIA Report - Vol 4 · PDF11 May 2026View
APPENDIX A09.2 FIGURES AND VISUALISATIONS PART 3EIA Report - Vol 4 · PDF11 May 2026View
APPENDIX A09.2 FIGURES AND VISUALISATIONS PART 4EIA Report - Vol 4 · PDF11 May 2026View
APPENDIX A09.2 FIGURES AND VISUALISATIONS COVER WEBSITE LINKSEIA Report - Vol 4 · PDF11 May 2026View
APPENDIX A09.1 LVIA METHODOLOGYEIA Report - Vol 4 · PDF11 May 2026View
APPENDIX A07.1 CLIMATE CHANGE VULNERABILITY ASSESSMENTEIA Report - Vol 4 · PDF11 May 2026View
APPENDIX A06.2 FOCUS GROUP SUMMARY REPORTEIA Report - Vol 4 · PDF11 May 2026View
APPENDIX A06.1 DETAILED SOCIAL AND ECONOMIC BASELINEEIA Report - Vol 4 · PDF11 May 2026View
APPENDIX A05.3 OFFSHORE PROJECT DESCRIPTION SUMMARYEIA Report - Vol 4 · PDF11 May 2026View
APPENDIX A05.2 ONSHORE STAKEHOLDER CONSULTATION AND ENGAGEMENTEIA Report - Vol 4 · PDF11 May 2026View
APPENDIX A05.1 EIA REGULATIONS REQUIREMENTSEIA Report - Vol 4 · PDF11 May 2026View
APPENDIX A03.1 CROSSING SCHEDULEEIA Report - Vol 4 · PDF11 May 2026View
APPENDIX A01.2 COMPETENT EXPERTSEIA Report - Vol 4 · PDF11 May 2026View
APPENDIX A01.1 GLOASSARY AND ABBREVIATIONSEIA Report - Vol 4 · PDF11 May 2026View
06.9 - ONSHORE PAC REPORT PART 4EIA Report - Vol 6 · PDF11 May 2026View
06.9 - ONSHORE PAC REPORT PART 3EIA Report - Vol 6 · PDF11 May 2026View
06.9 - ONSHORE PAC REPORT PART 2EIA Report - Vol 6 · PDF11 May 2026View
06.9 - ONSHORE PAC REPORT PART 1EIA Report - Vol 6 · PDF11 May 2026View
06.8 OUTLINE SOIL AND PEAT MANAGEMENTEIA Report - Vol 6 · PDF11 May 2026View
06.7 OUTLINE CONSTRUCTION TRAFFIC MANAGEMENT PLANEIA Report - Vol 6 · PDF11 May 2026View
06.6 OUTLINE CEMPEIA Report - Vol 6 · PDF11 May 2026View
06.5 OUTLINE BIRD PROTECTION PLANEIA Report - Vol 6 · PDF11 May 2026View
06.4 OUTLINE BREPEIA Report - Vol 6 · PDF11 May 2026View
06.3 ONSHORE RIAAEIA Report - Vol 6 · PDF11 May 2026View
06.2 DESIGN AND ACCESS STATEMENTEIA Report - Vol 6 · PDF11 May 2026View
APPENDIX 9.2 LIST OF FIGURES/VISUALISATIONSEIA Report - Vol 4 · PDF11 May 2026View
SPIORAD NA MARA ONSHORE TRANSMISSION WORKS PLANNING STATEMENTPlanning Statement · PDF8 May 2026View
14 INDICATIVE JOINT BAY AND LINK BOX PLAN AND SECTIONDrawing · PDF8 May 2026View
03 LANDFALL SUBSTN SITE PLANDrawing · PDF8 May 2026View
17 SUBSTN 1 TEMP CONSTRUCTION COMPOUNDSDrawing · PDF8 May 2026View
16 LANDFALL HDD TEMP CONSTRUCTION COMPOUNDDrawing · PDF8 May 2026View
19 TYPICAL CABLE CORRIDOR TEMP CONSTRUCTION COMPOUNDSDrawing · PDF8 May 2026View
20 TYPICAL CABLE HDD CORRIDOR TEMP CONSTRUCTION COMPOUNDDrawing · PDF8 May 2026View
13 INDICATIVE CABLE TRENCH DETAILSDrawing · PDF8 May 2026View
21 ACCESS JUNCTION TO LANDFALLDrawing · PDF8 May 2026View
23 TYPICAL CABLE CORRIDOR BELL MOUTH ACCESSDrawing · PDF8 May 2026View
15 TYPICAL HDD RIVER CROSSING ALIGNMENT AND PROFILEDrawing · PDF8 May 2026View
12 2XHDD LANDFALL CABLE ROUTE PLANDrawing · PDF8 May 2026View
22 ACCESS TO SUBSTN 2Drawing · PDF8 May 2026View
18 SUBSTN 2 TEMP CONSTRUCTION COMPOUNDDrawing · PDF8 May 2026View
07 GRID SUBSTN SITE PLANDrawing · PDF8 May 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Decision not yet published

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.