Council planning record

Phased housing development to erect 94 houses on brownfield site with associated roads and infrastructure.

Stornoway Airport Housing Development Melbost Point Isle Of Lewis

DecidedReference: 25/00457/SCR_LNa h-Eileanan Siar

Last published check: 24 Oct 2026, 16:46. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Standard Consultation Date

    Published milestoneCouncil source
  2. Application Received Date

    Published milestoneCouncil source
  3. Application Validated Date

    Published milestoneCouncil source
  4. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Decision Issued Date

    Published milestoneCouncil source
  7. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided
Application type
Environmental Screening Opinion
Received
11 Dec 2025
Validated
11 Dec 2025
Determination deadline
1 Jan 2026
Local authority
Na h-Eileanan Siar

Application overview

Phased housing development to erect 94 houses on brownfield site with associated roads and infrastructure.

Proposal details

Reference
25/00457/SCR_L
Ward
Ste�rnabhagh A Deas

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Stornoway Airport Housing Development Melbost Point Isle Of Lewis

This record has no verified map location.

View council map

Documents 12 of 12

DocumentPublishedAction
SCREENING OPINION DECISIONEIA Screening Opinion · PDF13 Mar 2026View
SEPA RESPONSEConsultation · PDF16 Dec 2025View
FRA - SURFACE WATER PIPE NETWORK DESIGN CALCULATIONSSupporting Information · PDF11 Dec 2025View
FRA - DETENTION BASIN CAPACITY DESIGN PHASE 1 AND 2 CALCULATIONSSupporting Information · PDF11 Dec 2025View
FRA - DETENTION BASIN CAPACITY DESIGN PHASE 3 CALCULATIONSSupporting Information · PDF11 Dec 2025View
FRA - SURFACE WATER PIPE NETWORK DESIGN PHASE 3 CALCULATIONSSupporting Information · PDF11 Dec 2025View
FRA - COASTAL FLOOD RISK CALCULATIONSSupporting Information · PDF11 Dec 2025View
FLOOD RISK ASSESSMENT (FRA)Supporting Information · PDF11 Dec 2025View
FRA - TIDE LEVEL CALCULATIONSSupporting Information · PDF11 Dec 2025View
01 LOCATION PLANDrawing · PDF11 Dec 2025View
02 SITE PLAN - PLANNING BOUNDARYDrawing · PDF11 Dec 2025View
03 SITE PLAN - GENERAL LAYOUTDrawing · PDF11 Dec 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

No Environmental Assessment Required
SCREENING OPINION DECISION
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.