Council planning record

New 11Kva Over Headline spur in Ardroil, Isle of Lewis. This new line would consist of 2 new spans in total, for a length of approx. 120 Meters. The line would consist of 2 single poles and a total of 3 support stays, one on existing pole No.219 and two on the new pole No.2. The pole heights are documented below and the overhead line design is shown on the attached plan. The final single pole will have a 100KV Transformer installed on it and a section of underground Low Voltage cable then going from the base of the pole to the new Supply point. (approx. 30 mtrs)

11Kva Overhead Line Spur Ardroil Uig Isle Of Lewis

DecidedReference: 25/00245/OHLNa h-Eileanan Siar

Last published check: 21 Oct 2026, 00:25. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Decision Issued Date

    Published milestoneCouncil source
  4. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided
Application type
Overhead Electricity Lines
Received
7 Jul 2025
Validated
7 Jul 2025
Determination deadline
6 Sept 2025
Local authority
Na h-Eileanan Siar

Application overview

New 11Kva Over Headline spur in Ardroil, Isle of Lewis. This new line would consist of 2 new spans in total, for a length of approx. 120 Meters. The line would consist of 2 single poles and a total of 3 support stays, one on existing pole No.219 and two on the new pole No.2. The pole heights are documented below and the overhead line design is shown on the attached plan. The final single pole will have a 100KV Transformer installed on it and a section of underground Low Voltage cable then going from the base of the pole to the new Supply point. (approx. 30 mtrs)

Proposal details

Reference
25/00245/OHL
Ward
Sgir' Uige Agus Carlabhagh

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

11Kva Overhead Line Spur Ardroil Uig Isle Of Lewis

This record has no verified map location.

View council map

Documents 5 of 5

DocumentPublishedAction
ECU DECISION AS PER 25/00070/OHLDecision · PDF25 Sept 2025View
SIMPLIFIED NOTIFICATIONApplication Form8 Jul 2025View
01 LOCATION PLANDrawing · PDF8 Jul 2025View
02 SITE PLANDrawing · PDF8 Jul 2025View
REG 8 SCREENING OPINIONDrawing · PDF8 Jul 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

No Objections (NPDs,PNs and Electricity)
ECU DECISION AS PER 25/00070/OHL
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.