Council planning record

The erection of two sequence batch reactor tanks, distribution chambers, motor control centre kiosks, two blower buildings, two sludge storage tanks, Strainpress, two screen sludge storage tanks, odour control unit, Storm tank, Inlet works motor control centre, generator, final effluent wastewater pumping station, Interstage pumping station, sludge reception pumping station, strainpress feed pumping station, centrifuge feed pumping station, Rotomat sludge screen, motor control centre, flood bund, landscaping, internal access road, lighting, fencing, site access road, demolition works, along with a temporary contractor's compound and construction access.

Llanfoist Sewage Treatment Works And Premise, Heads Of The Valley Road, Llanfoist, Monmouthshire, NP7 9LH

DecidedReference: DC/2016/01127Monmouthshire County Council

Last published check: 17 Oct 2026, 02:09. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  5. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Actual Committee Date

    Published milestoneCouncil source
  9. Decision Issued Date

    Published milestoneCouncil source
  10. Decision Made Date

    Published milestoneCouncil source

Application summary

Status
Decided
Application type
Planning Permission
Received
27 Sept 2016
Validated
17 Oct 2016
Determination deadline
6 Feb 2017
Local authority
Monmouthshire County Council

Application overview

The erection of two sequence batch reactor tanks, distribution chambers, motor control centre kiosks, two blower buildings, two sludge storage tanks, Strainpress, two screen sludge storage tanks, odour control unit, Storm tank, Inlet works motor control centre, generator, final effluent wastewater pumping station, Interstage pumping station, sludge reception pumping station, strainpress feed pumping station, centrifuge feed pumping station, Rotomat sludge screen, motor control centre, flood bund, landscaping, internal access road, lighting, fencing, site access road, demolition works, along with a temporary contractor's compound and construction access.

Proposal details

Reference
DC/2016/01127
Alternative references
05397333
Ward
Llanfoist Fawr
Parish
Llanfoist Fawr Community Council

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Llanfoist Sewage Treatment Works And Premise, Heads Of The Valley Road, Llanfoist, Monmouthshire, NP7 9LH

This record has no verified map location.

View council map

Documents 117 of 117

DocumentPublishedAction
START OF WORKS NOTIFICATIONCorrespondence29 Aug 2017View
DELEGATED OFFICER REPORTReport · PDF20 Jul 2017View
APPROVAL NOTICEDecision · PDF20 Jul 2017View
LANDSCAPE PLANTING PLANDrawing · PDF10 Jul 2017View
E-MAIL FROM AGENTCorrespondence10 Jul 2017View
FINAL ECOLOGY COMMENTSCorrespondence · PDF27 Jun 2017View
HABITATS REGS ASSESSMENTCorrespondence · PDF27 Jun 2017View
NCDMSEC-001 V.2 ECOLOGICAL MITIGATION OF VEGETATION CONSTRUCTION METHOD ...Other · PDF20 Jun 2017View
NCDMSEC-001 V.2 CONSTRUCTION METHOD STATEMENT FOR WORKS AT LLANFOIST WWT...Other · PDF20 Jun 2017View
ECOLOGICAL MITIGATION OF VEGETATION CONSTRUCTION METHOD STATEMENT FOR WO... (002Other · PDF25 May 2017View
CONSTRUCTION METHOD STATEMENT FOR WORKS AT LLANFOIST WWTW_09012017Other · PDF25 May 2017View
LLANFOIST_OTTER SURVEY_3594-S-202-HYD-XX-XX-RP-NX-10012_MAY 2017_FINAL(3...Other · PDF25 May 2017View
LANDSCAPE PLANTING PLAN V7Other · PDF17 May 2017View
LLANFOIST GI CONCEPT STATEMENT_V05Other · PDF17 May 2017View
LANDSCAPE & GI COMMENTSCorrespondence · PDF24 Jan 2017View
TREE OFFICERCorrespondence · PDF9 Dec 2016View
NRW COMMENTSCorrespondence · PDF30 Nov 2016View
ONLINE COMMENT: OBJECT TO PROPOSAL FOR APPLICATION DC/2016/01127Online Comment11 Nov 2016View
GROUND INVESTIGATION INTERP REPORTOther · PDF10 Nov 2016View
GROUND INVESTIGATION INTERP REPORTOther · PDF10 Nov 2016View
GROUND INVESTIGATION INTERP REPORTOther · PDF10 Nov 2016View
GROUND INVESTIGATION INTERP REPORTOther · PDF10 Nov 2016View
GROUND INVESTIGATION INTERP REPORTOther · PDF10 Nov 2016View
GROUND INVESTIGATION INTERP REPORTOther · PDF10 Nov 2016View
GROUND INVESTIGATION INTERP REPORTOther · PDF10 Nov 2016View
GROUND INVESTIGATION INTERP REPORTOther · PDF10 Nov 2016View
GROUND INVESTIGATION INTERP REPORTOther · PDF10 Nov 2016View
GROUND INVESTIGATION INTERP REPORTOther · PDF10 Nov 2016View
TECHNICAL APPENDICESReport · PDF10 Nov 2016View
TECHNICAL APPENDICESReport · PDF10 Nov 2016View
TECHNICAL APPENDICESReport · PDF10 Nov 2016View
TECHNICAL APPENDICESReport · PDF10 Nov 2016View
TECHNICAL APPENDICESReport · PDF10 Nov 2016View
TECHNICAL APPENDICESReport · PDF10 Nov 2016View
TECHNICAL APPENDICESReport · PDF10 Nov 2016View
SCREENING REPORTReport · PDF9 Nov 2016View
EXISTING SITE LAYOUTDrawing · PDF9 Nov 2016View
PROPOSED DEVELOPMENT LAYOUTDrawing · PDF9 Nov 2016View
PROPOSED ELEVATIONS (NORTHSOUTH)Drawing · PDF9 Nov 2016View
PROPOSED ELEVATIONS (EASTWEST)Drawing · PDF9 Nov 2016View
PHASE 1 HABITAT SURVEYDrawing · PDF9 Nov 2016View
HERITAGE ASSET LOCATION PLANDrawing · PDF9 Nov 2016View
STUDY AREAS CATCHMENT HYDROLOGY SURFACE WATER FEATURESDrawing · PDF9 Nov 2016View
LANDSCAPE AND VISUAL CONSIDERATIONSDrawing · PDF9 Nov 2016View
LOCAL LANDSCAPE CHARACTERDrawing · PDF9 Nov 2016View
VIEWPOINTS-SHEET 1 OF 7Drawing · PDF9 Nov 2016View
VIEWPOINTS-SHEET 2 OF 7Drawing · PDF9 Nov 2016View
VIEWPOINTS-SHEET 3 OF 7Drawing · PDF9 Nov 2016View
VIEWPOINTS-SHEET 4 OF 7Drawing · PDF9 Nov 2016View
VIEWPOINTS-SHEET 5 OF 7Drawing · PDF9 Nov 2016View
VIEWPOINTS-SHEET 6 OF 7Drawing · PDF9 Nov 2016View
VIEWPOINTS-SHEET 7 OF 7Drawing · PDF9 Nov 2016View
PHOTOMONTAGES-SHEET 1 OF 7Drawing · PDF9 Nov 2016View
PHOTOMONTAGES-SHEET 2 OF 7Drawing · PDF9 Nov 2016View
PHOTOMONTAGES-SHEET 3 OF 7Drawing · PDF9 Nov 2016View
PHOTOMONTAGES-SHEET 4 OF 7Drawing · PDF9 Nov 2016View
PHOTOMONTAGES-SHEET 5 OF 7Drawing · PDF9 Nov 2016View
PHOTOMONTAGES-SHEET 6 OF 7Drawing · PDF9 Nov 2016View
PHOTOMONTAGES-SHEET 7 OF 7Drawing · PDF9 Nov 2016View
PROPOSED ACCESS ROUTESDrawing · PDF9 Nov 2016View
TRAFFIC SURVEY LOCATIONSDrawing · PDF9 Nov 2016View
LOCATION AND SEVERITY OF PERSONAL INJURY ACCIDENTSDrawing · PDF9 Nov 2016View
BASELINE NOISE SURVEY LOCATIONSDrawing · PDF9 Nov 2016View
AIR QUALITY SENSITIVE RECEPTORSDrawing · PDF9 Nov 2016View
GEO ENVIRONMENTAL CONSTRAINTSDrawing · PDF9 Nov 2016View
FIGURES - PAGE & CONTENTSOther · PDF9 Nov 2016View
TRANSPORT ASSESSMENTReport · PDF9 Nov 2016View
CTMPReport · PDF9 Nov 2016View
VOL 2 - ENV STATEMENTReport · PDF9 Nov 2016View
NON-TECHNICAL SUMMARYReport · PDF9 Nov 2016View
SITE LOCATIONDrawing · PDF9 Nov 2016View
PLANNING APPLICATION BOUNDARYDrawing · PDF9 Nov 2016View
CUMMULATIVE SITESDrawing · PDF9 Nov 2016View
LETTER FROM GGATGeneral Comment · PDF4 Nov 2016View
LLANFOIST FAWR COMMUNITY COUNCIL: GENERAL OBSERVATION FOR APPLICATION DC/2016/01Online Comment4 Nov 2016View
EXISTING SITE LAYOUTDrawing · PDF31 Oct 2016View
E-MAIL FROM PLANNING POLICYGeneral Comment · PDF28 Oct 2016View
ALISON SPENCERGeneral Comment · PDF28 Oct 2016View
NEIGHBOUR COMMENT - A SPENCEROther · PDF27 Oct 2016View
LETTER FROM WALES & WESTCorrespondence · PDF26 Oct 2016View
LETTER FROM WALES & WESTCorrespondence · PDF26 Oct 2016View
NRW CHECKLISTOfficer Notes · PDF20 Oct 2016View
THE ERECTION OF TWO SEQUENCE BATCH REACTOR TANKS, DISTRIBUTION CHAMBERS, MOTOR CApplication Form · PDF4 Oct 2016View
PROPOSED ODOUR CONTROL UNIT PLAN AND ELEVATIONSDrawing · PDF4 Oct 2016View
PROPOSED SEQUENCE BATCH REACTOR MCC KIOSK PLAN AND ELEVATIONDrawing · PDF4 Oct 2016View
PROPOSED SEQUENCE BATCH REACTOR MCC KIOSK PLAN AND ELEVATIONDrawing · PDF4 Oct 2016View
PROPOSED SEQUENCE BATCH REACTORDrawing · PDF4 Oct 2016View
ELEVATIONS LOOKING WEST (2 OF 2)Drawing · PDF4 Oct 2016View
PROPOSED BLOWER BUILDING PLAN AND ELEVATIONSDrawing · PDF4 Oct 2016View
PROPOSED SEQUENCE BATCH REACTOR EAST AND WEASTDrawing · PDF4 Oct 2016View
PROPOSED SEQUENCE BATCH REACTOR NORTH AND SOUTH ELEVATIONSDrawing · PDF4 Oct 2016View
ELEVATIONS LOOKING WEST (1 OF2)Drawing · PDF4 Oct 2016View
ELEVATIONS LOOKING NORTH (1 OF 2)Drawing · PDF4 Oct 2016View
PROPOSED DEVELOPMENT SITE LAYOUTDrawing · PDF4 Oct 2016View
PLANNING APPLICATION SITE BOUNDARYDrawing · PDF4 Oct 2016View
PROPOSED SITE LAYOUTDrawing · PDF4 Oct 2016View
ELEVATIONS LOOKING EAST (2OF2)Drawing · PDF4 Oct 2016View
ELEVATIONS LOOKING EAST (1 OF2)Drawing · PDF4 Oct 2016View
ELEVATIONS LOOKING SOUTH (2 OF 2)Drawing · PDF4 Oct 2016View
ELEVATIONS LOOKING SOUTH (1 OF 2)Drawing · PDF4 Oct 2016View
ELEVATIONS LOOKING NORTH (2 OF 2)Drawing · PDF4 Oct 2016View
GREEN INFRASTRUCTURE CONCEPT STATEMENTOther · PDF4 Oct 2016View
WATER FRAMEWORK DIRECTIVE ASSESSMENT SCREENING REPORTOther · PDF4 Oct 2016View
DESIGN AND ACCESS STATEMENTOther · PDF4 Oct 2016View
CONSULTATION REPORTOther · PDF4 Oct 2016View
FIGURE 3 GREEN INFRASTRUCTURE CONCEPT PROPOSALSDrawing · PDF4 Oct 2016View
FIGURE 2 GREEN INFRASTRUCTURE OPPORTUNITIESDrawing · PDF4 Oct 2016View
FIGURE 1 GREEN INFRASTRUCTURE ASSETSDrawing · PDF4 Oct 2016View
PROPOSED THICKENER BUILDING PLAN AND ELEVATIONSDrawing · PDF4 Oct 2016View
PROPOSED GENERATOR PLAN AND ELEVATIONSDrawing · PDF4 Oct 2016View
PROPOSED INLET WORKS MCC PLAN AND ELEVATIONSDrawing · PDF4 Oct 2016View
PROPOSED STRIN PRESS PLAN AND ELEVATIONSDrawing · PDF4 Oct 2016View
PROPOSED STORM TANK PLAN AND ELEVATIONSDrawing · PDF4 Oct 2016View
PROPOSED SCREENED SLUDGE STORAGE TANK PLAN AND ELEVATIONSDrawing · PDF4 Oct 2016View
PROPOSED SLUDGE STORAGE TANK NO1 AND NO2 PLAN AND ELEVATIONSDrawing · PDF4 Oct 2016View
PROPOSED FINAL EFFLUENT WASTEWATER KIOSK PLAN AND ELEVATIONSDrawing · PDF4 Oct 2016View
PROPOSED CAUSTIC DOSING KIOSK PLAN AND ELEVATIONDrawing · PDF4 Oct 2016View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Approve
APPROVAL NOTICE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.