Council planning record

Approval of details required by conditions 22 (Highways infrastructure) and 59 (Surface water drainage scheme) of permission ref. 21/00999/OUTEIS

Mk East Development, London Road, Newport Pagnell

Decision MadeReference: 24/01563/DISCONMilton Keynes City Council

Last published check: 30 Sept 2026, 03:24. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Decision Notice Sent Date

    Published milestoneCouncil source

Application summary

Status
Decision Made
Application type
Approval of details reserved by a condition
Received
Not published
Validated
Not published
Determination deadline
Not published
Local authority
Milton Keynes City Council

Application overview

Approval of details required by conditions 22 (Highways infrastructure) and 59 (Surface water drainage scheme) of permission ref. 21/00999/OUTEIS

Proposal details

Reference
24/01563/DISCON
Ward
Olney (Historic 2026)
Parish
Moulsoe
Agent
Miss Liora Lederman

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Mk East Development, London Road, Newport Pagnell

This record has no verified map location.

Documents 868 of 868

DocumentPublishedAction
Proposed Contours Sheet 29APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
KERBING AND FOOTWAY STANDARD DETAIL SHEET 1APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
FENCING SHEET 12APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
A509 RBT 1 ROUNDABOUT VISIBILITYAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
DRAINAGE LAYOUT SHEET 14APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
ROUNDABOUT MAINTENANCE LAYBY VEHICLE TRACKING SHEET 1APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
PAVEMENT CONSTRUCTION DETAILS ON STRUCTURES SHEET 2APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
JUNCTION VISIBILITY LINK 512APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Link 303 Long Section CH 000.000m - CH 146.779mAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Traffic Signs Construction Details Sheet 9A Phase 1 Highway InfrastructureAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Maintenance Layby Longitudinal Sections Sheet 2 of 2APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
MAINTENANCE LAYBY LONGITUDINAL SECTIONS SHEET 1 OF 2APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Footways and Paved Areas Sheet 12APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Surface Water Drainage Overview Plan Phase 1 Highway InfrastructureAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
FENCING SHEET 15 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 304 CROSS SECTIONSAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
TRAFFIC SIGNS CONSTRUCTION DETAILS SHEET 18 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Proposed Contours Sheet 20APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 110 LONG SECTION CH 000.000m - CH 553.555mAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
JUNCTION VISIBILITY CRANFIELD LINK (CL RBT)APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
LINK 501 LONGITUDINAL SECTION CH 600.000m - CH 788.366APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
DRAINAGE LAYOUT SHEET 17APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Drainage Layout Sheet 22APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
DMRB COMPLIANT DRAWING A509 ROUNDABOUT 2 (A509 RBT2) SHEET 3APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
GENERAL ARRANGEMENT SHEET 10APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
PROPOSED CONTOURS SHEET 14APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Site Clearance Sheet 17APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
SURFACE WATER DRAINAGE LONG SECTIONS SHEET 48APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
LINK 511 REFUSE VEHICLE TRACKINGAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
FENCING SHEET 15 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
FENCING SHEET 13APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Surface Water Drainage Long Sections Sheet 8APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
SIGNAGE LAYOUT SHEET 13 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Drainage Layout Sheet 21APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
GENERAL ARRANGEMENT SHEET 15 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
DRAINAGE LAYOUT SHEET 14APPCONIN - Condition Submitted Details · PDF19 Jul 2024View
Kerbing and Footway Standard Details Sheet 3APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
VEHICLE RESTRAINT SYSTEM KEY AND NOTESAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
BOX VAN - VEHICLE TRACKING A509 ROUNDABOUT LINK 108, LINK 509, LINK 510APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
GENERAL ARRANGEMENT SHEET 19APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Proposed Contours Sheet 17APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
JUNCTION VISIBILITY LINK 503APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
ROAD MARKING LAYOUT SHEET 9 PHASE 2 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Surface Water Drainage Manhole Schedule Sheet 1APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Link 304 Long Section CH 000.000m - CH 151.145mAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Cranfield Link RBT Longitudinal Section Roundabout Approach Arms Sheet 2 of 3APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 108 PUMPING STATION ACCESS JUNCTION VISIBILITYAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Eastern Link RBT 2 Longitudinal Section CH 000.000m - CH 179.071m Sheet 1 of 3APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
DMRB COMPLIANT DRAWING A509 ROUNDABOUT 2 (A509 RBT 2) SHEET 4APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
GENERAL ARRANGEMENT PRIMARY SUBSTATIONAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
DMRB COMPLIANT DRAWING CRANFIELD LINK (CL RBT) SHEET 1APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
GENERAL ARRANGEMENT, VISIBILITY AND RBT COMPLIANCE KEY AND NOTESAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
PROPOSED CONTOURS SHEET 15 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Kerbing Sheet 21APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 108 - 511 BUS STOP TRACKINGAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
MAINTENANCE LAYBY LONGITUDINAL SECTIONS SHEET 2 OF 2APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
JUNCTION VISIBILITY EASTERN LINK ROUNDABOUT 1APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
FOOTWAYS AND PAVED AREAS SHEET 19APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
HIGHWAY DRAINAGE NOTES AND LEGENDAPPCONIN - Condition Submitted Details · PDF19 Jul 2024View
GENERAL ARRANGEMENT SHEET 22APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
ROAD MARKING LAYOUT SHEET 10 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
VEHICLE RESTRAINT SYSTEM SHEET 18APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
SIGNAGE LAYOUT SHEET 19 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
HIGHWAY DRAINAGE TYPICAL DETAILS SHEET 4APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
PAVEMENT AND SURFACING SHEET 18APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
DMRB COMPLIANT DRAWING M1 J14 ROUNDABOUT 1 (M1 J14 RBT) SHEET 4APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
HIGHWAY DRAINAGE TYPICAL DETAILS SHEET 6APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
DRAINAGE LAYOUT SHEET 12APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Fencing Sheet 18APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
EASTERN LINK RBT 2 LONGITUDINAL SECTION SUBWAY & REDWAY RAMPS SHEET 1APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
LINK 304, LINK 110 FIRE TENDER JUNCTION TRACKINGAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Fencing Sheet 11APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
FENCING SHEET 20APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Pavement Construction Details on Structures Sheet 2APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Surface Water Drainage Phase 1 Highway Infrastructure Manhole Schedule Sheet 3APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
KERBING SHEET 21APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
A509 RBT 1 Longitudinal Section Roundabout Approach Arms Sheet 2 of 3APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Vehicle Restraint System Sheet 21APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
HIF Infrastructure 9APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Surface Water Drainage Manhole Schedule Sheet 12APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
SIGNAGE LAYOUT SHEET 20 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Pavement Construction Details Sheet 4APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
EASTERN LINK RBT 1 SUBWAY - FOOTWAYS AND PAVED AREASAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
DMRB COMPLIANT DRAWING CRANFIELD LINK ROUNDABOUT (CL RBT) SHEET 4APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Surface Water Drainage Long Sections Sheet 45APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Link 101 Long Section CH 000.000m - CH 440.570mAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Surface Water Drainage Headwall Schedule Agreement 7APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
SIGNAGE LAYOUT SHEET 15 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
JUNCTION VISIBILITY LINK 512APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 306 LONG SECTION CH 000.000m - CH 23.502mAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
FOOTWAYS AND PAVED AREAS SHEET 15 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
FOOTWAYS AND PAVED AREAS SHEET 14APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
LINK 511 CROSS SECTIONSAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
JUNCTION VISIBILITY LINK 501 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
GENERAL ARRANGEMENT SHEET 29APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
DRAINAGE LAYOUT SHEET 24APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Attenuation Basin Sections Basin 14APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
ROAD MARKING LAYOUT SHEET 13 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 110, LINK 503 FIRE TENDER JUNCTION TRACKINGAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
EASTERN LINK RBT 2 LONGITUDINAL SECTION ROUNDABOUT APPROACH ARMS SHEET 2 OF 3 PHASE 1 HIGHWAY INFRASTRUCTUAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
TRAFFIC SIGNS CONSTRUCTION DETAILS SHEET 13A PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
HGV - VEHICLE TRACKING A509 ROUNDABOUT LINK 108, LINK 509, LINK 510APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Pavement Construction Details on Structures Sheet 3APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Drainage Layout Sheet 10APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
SURFACE WATER DRAINAGE LONG SECTIONS SHEET 7APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
LLFA commentAPPCONR - Consultation Responses · PDF11 Sept 2024View
Covering letterAPPSUPP - Other Supporting Documents/Information · PDF18 Jul 2024View
FOOTWAYS AND PAVED AREAS SHEET 17APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
SITE CLEARANCE SHEET 21APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
PROPOSED CONTOURS SHEET 21APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
LINK 510 PUMPING STATION ACCESS JUNCTION VISIBILITYAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
EL RBT 1 LONGITUDINAL SECTION ROUNDABOUT APPROACH ARMS SHEET 3 OF 3APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
GENERAL ARRANGEMENT PYMS SUB STATIONAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
SURFACE WATER DRAINAGE PHASE 1 HIGHWAY INFRASTRUCTURE HEADWALL SCHEDULE AGREEMENT 2APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
PAVEMENT CONSTRUCTION DETAILS STEPPED TIE IN DETAILSAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
GENERAL ARRANGEMENT SHEET 15 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF19 Jul 2024View
Fencing Sheet 12APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Signs and Lines Key and Notes Phase 1 Highway InfrastructureAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
JUNCTION VISIBILITY EASTERN LINK ROUNDABOUTAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Surface Water Drainage Long Sections Sheet 21APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Link 503 Long Section CH 000.000m - CH 101.135mAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Pavement and Surfacing Sheet 10APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 110 CROSS SECTION SHEET 1APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Highway Drainage Typical Details Sheet 2APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Link 301 Long Section CH 000.000m - CH 202.533mAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Site Clearance Notes and KeyAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Traffic Signs Construction Details Sheet 30 Phase 1 Highway InfrastructureAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
SITE CLEARANCE SHEET 10APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
ROAD MARKING LAYOUT SHEET 30 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Vehicle Restraint System Sheet 18APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
GENERAL ARRANGEMENT SHEET 12APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Link 501 Longitudinal Section CH 600.000m - CH 788.366mAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Traffic Signs Construction Details Sheet 17A Phase 1 Highway InfrastructureAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Site Clearance Sheet 21APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
PAVEMENT AND SURFACING SHEET 15 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
GENERAL ARRANGEMENT SHEET 14APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
DMRB COMPLIANT DRAWING CRANFIELD LINK ROUNDABOUT (CL RBT) SHEET 4APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
HIF Infrastructure 1APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Surface Water Drainage Phase 1 Highway Infrastructure Headwall Schedule Agreement 1APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Kerbing Sheet 19APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Pavement and Surfacing Sheet 22APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 102 CROSS SECTION SHEET 3 OF 3APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
DMRB COMPLIANT DRAWING EASTERN LINK ROUNDABOUT 1 (EL RBT 1) SHEET 4APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
SCHEMATIC OVERVIEWAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Highway Drainage MicroDrainage Calculations - HIF - 9APPCONIN - Condition Submitted Details · PDF19 Jul 2024View
Fencing Key and NotesAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Link 512 Longitudinal Section CH 000.000m - CH 23.757mAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 110, LINK 503 REFUSE VEHICLE JUNCTION TRACKINGAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
FENCING SHEET 19APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
FENCING SHEET 22APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
EASTERN LINK RBT 1 LONGITUDINAL SECTION SUBWAY & REDWAY RAMPS SHEET 1APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
LINK 511 FIRE VEHICLE TRACKINGAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Link 501 Cross Section Sheet 1APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 511 BUS STOP AND THROUGH JUNCTION TRACKINGAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
SIGNAGE LAYOUT SHEET 13 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF19 Jul 2024View
Contour and Key NotesAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Road Marking Layout Sheet 18 Phase 1 Highway InfrastructureAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
A509 RBT 2 ROUNDABOUT VISIBILITYAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
GENERAL ARRANGEMENT SHEET 22APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Pavement Construction Details Stepped Tie In DetailsAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Link 502 Long Section CH 000.000m - CH 50.000mAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
FOOTWAYS AND PAVED AREAS SHEET 9 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
GENERAL ARRANGEMENT PRIMARY SUBSTATIONAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
JUNCTION VISIBILITY A509 ROUNDABOUT 2APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
DMRB COMPLIANT DRAWING CRANFIELD LINK (CL RBT) SHEET 2APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
FOOTWAYS AND PAVED AREAS SHEET 15 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
DMRB COMPLIANT DRAWING EASTERN LINK ROUNDABOUT 2 (EL RBT 2) SHEET 3APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
NEWPORT ROAD TURNING HEAD TRACKINGAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Vehicle Restraint System Sheet 22APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Phase 1 Drawing List (Excel)APPCONIN - Condition Submitted Details19 Jul 2024View
GENERAL ARRANGEMENT SHEET 9 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
GENERAL ARRANGEMENT SUB STATION 4APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 502 CROSS SECTIONAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
HGV AND BOX VAN CRANFIELD ROUNDABOUT JUNCTION TRACKINGAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
M1 JUNCTION 14 ROUNDABOUT LINK 101 VEHICLE TRACKINGAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 110, LINK 503 REFUSE VEHICLE JUNCTION TRACKINGAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Maintenance Layby Longitudinal Sections Sheet 1 of 2APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Vehicle Restraint System Sheet 12APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Road Marking Layout Sheet 30 Phase 1 Highway InfrastructureAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Schematic OverviewAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 501 CROSS SECTION SHEET 1APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Kerbing Sheet 22APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 512 REFUSE VEHICLE TRACKINGAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LLFAAPPCONR - Consultation Responses · PDF29 Aug 2024View
Site Clearance Sheet 28APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
A509 RBT 2 LONGITUDINAL SECTION CH 000.00m - CH 116.239m SHEET 1 OF 3APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
KERBING SHEET 12APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
LINK 110, LINK 503 BOX VAN JUNCTION TRACKINGAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
FENCING KEY AND NOTESAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
JUNCTION VISIBILITY LINK 301APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Highway Drainage Typical Details Sheet 6APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Drainage Layout Sheet 13 Phase 1 Highways InfrastructureAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Traffic Signs Construction Details Sheet 15A Phase 1 Highway InfrastructureAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Footways and Paved Areas Sheet 21APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 504 CROSS SECTION SHEET 1APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
PAVEMENT CONSTRUCTION DETAILS SHEET 1APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
LINK 504 LONG SECTION CH 000.000m - CH 60.000mAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Link 108 Cross Sections Sheet 1APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Pavement and Surfacing Sheet 30APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Pavement Construction Details Sheet 5APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
SITE CLEARANCE SHEET 15 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Site Clearance Sheet 24APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
PROPOSED CONTOURS SHEET 12APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
CONTOURS SHEET 22APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
SITE CLEARANCE SHEET 27APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
SITE CLEARANCE SHEET 23APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
SIGNAGE LAYOUT SHEET 18 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Link 501 Long Section CH 000.000m - CH 600.000mAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
A509 RBT 2 Longitudinal Section Roundabout Approach Arms Sheet 2 of 3APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Eastern Link RBT 2 Longitudinal Section Subway & Redway Ramps Sheet 1APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 110 CROSS SECTION SHEET 4APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
DMRB COMPLIANT DRAWING M1 J14 ROUNDABOUT 1 (M1 J14 RBT) SHEET 1APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
LINK 304, LINK 110 BOX VAN JUNCTION TRACKINGAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Phase 1 Drawing ListAPPSUPP - Other Supporting Documents/Information · PDF15 Jul 2024View
Surface Water Drainage Long Sections Sheet 9APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Site Clearance Sheet 13APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
General Arrangement, Visibility and RBT Compliance Key and NotesAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
DRAINAGE LAYOUT SHEET 29APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Kerbing and Footway Standard Details Sheet 4APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
A509 RBT 1 SUBWAY - FOOTWAYS AND PAVED AREAS PHASE 2 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
DRAINAGE LAYOUT SHEET 9 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
DMRB COMPLIANT DRAWING A509 ROUNDABOUT 1 (A509 RBT 1) SHEET 3APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Footways and Paved Areas Sheet 10APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
FENCING SHEET 14APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
LINK 511 FIRE VEHICLE TRACKINGAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
PAVEMENT AND SURFACING SHEET 21APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
SURFACE WATER DRAINAGE MANHOLE SCHEDULE SHEET 12APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Surface Water Drainage Long Sections Sheet 16APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 512 REFUSE VEHICLE TRACKINGAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
JUNCTION VISIBILITY LINK 306APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
EASTERN LINK RBT 1 LONGITUDINAL SECTION SUBWAY & REDWAY RAMPS SHEET 1APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
KERBING SHEET 9 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
LINK 512 LONGITUDINAL SECTION CH 000.000m - CH 23.757mAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
LINK 102 15m BUS BUS STOP TRACKINGAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
A509 RBT 1 SUBWAY - KERBING PHASE 2 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
ROAD MARKING LAYOUT SHEET 18 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Fencing Sheet 30APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
A509 RBT 2 LONGITUDINAL SECTION ROUNDABOUT APPROACH ARMS SHEET 3 OF 3APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Footways and Paved Areas Sheet 17APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
KERBING SHEET 20APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
GENERAL ARRANGEMENT TYPICAL SUBSTATIONAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Pavement Construction Details Sheet 2APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
PROPOSED CONTOURS SHEET 20APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
DMRB COMPLIANT DRAWING CRANFIELD LINK (CL RBT) SHEET 1APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Kerbing Sheet 18APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Link 108 Longitudinal Section CH 000.000m - CH 548.651mAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
SIGNAGE LAYOUT SHEET 14 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
FOOTWAYS AND PAVED AREAS SHEET 22APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Site Clearance Sheet 27APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 102 CROSS SECTION SHEET 1 OF 3APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
A509 RBT 1 LONGITUDINAL SECTION ROUNDABOUT APPROACH ARMS SHEET 3 OF 3APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
KERBING SHEET 13APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
HIGHWAY DRAINAGE TYPICAL DETAILS SHEET 5APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
DMRB COMPLIANT DRAWING CRANFIELD LINK (CL RBT) SHEET 2APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
DRAINAGE LAYOUT SHEET 18APPCONIN - Condition Submitted Details · PDF19 Jul 2024View
ATTENUATION BASIN SECTIONS BASIN 14APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
PAVEMENT AND SURFACING SHEET 14APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
KERBING SHEET 17APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Road Marking Layout Sheet 17 Phase 1 Highway InfrastructureAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
SITE CLEARANCE SHEET 15 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Traffic Signs Construction Details Sheet 10 Phase 1 Highway InfrastructureAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
EASTERN LINK RBT 1 SUBWAY - FOOTWAYS AND PAVED AREASAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Link 511 Cross SectionsAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
FOOTWAYS AND PAVED AREAS SHEET 30APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
KERBING AND FOOTWAY STANDARD DETAILS SHEET 3APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Footways and Paved Areas Sheet 20APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
M1 JUNCTION 14 ROUNDABOUT LINK 101 VEHICLE TRACKINGAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Link 502 Cross SectionAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Eastern Link RBT 2 Longitudinal Section Subway & Redway Ramps Sheet 2APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Site Clearance Sheet 25APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
EL RBT 1 ROUNDABOUT VISIBILITYAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
A509 RBT 1 LONGITUDINAL SECTION SUBWAY & REDWAY RAMPS SHEET 1 PHASE 1 INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
LINK 512 BOX VAN TRACKINGAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Site Clearance Sheet 19APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
ATTENUATION BASIN SECTIONS BASIN 18A-1APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Proposed Contours Sheet 13APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
ROAD MARKING LAYOUT SHEET 9 PHASE 2 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
SURFACE WATER DRAINAGE PHASE 1 HIGHWAY INFRASTRUCTURE LONG SECTIONS SHEET 20APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
LINK 102 ARTICULATED BUS BUS STOP TRACKINGAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Site Clearance Sheet 26APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
General Arrangement Sheet 17APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Kerbing and Footway Standard Detail Sheet 1APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
DRAINAGE LAYOUT SHEET 22APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
HighwaysAPPCONR - Consultation Responses · PDF7 Aug 2024View
TRAFFIC SIGNS CONSTRUCTION DETAILS SIMMONSIGN UPLIGHTER PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
PAVEMENT CONSTRUCTION DETAILS SHEET 4APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Fencing Construction Details Sheet 1APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Link 107 Cross Sections Phase 1 InfrastructureAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
SURFACE WATER DRAINAGE HEADWALL SCHEDULE AGREEMENT 11APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
EL RBT 2 ROUNDABOUT VISIBILITYAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
PAVEMENT CONSTRUCTION DETAILS SHEET 7APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
GENERAL ARRANGEMENT TYPICAL SUBSTATIONAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Proposed Contours Sheet 14APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
DRAINAGE LAYOUT SHEET 21APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Surface Water Drainage Headwall Schedule Agreement 8APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Highway Drainage Typical Details Sheet 5APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
HGV - VEHICLE TRACKING A509 ROUNDABOUT 2, LINK 302, LINK 303, LINK 501APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
ROAD MARKING LAYOUT SHEET 20 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
LINK 303 LONG SECTION CH 000.000m - CH 146.779mAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
DMRB COMPLIANT DRAWING A509 ROUNDABOUT 1 (A509 RBT 1) SHEET 1APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Proposed Contours Sheet 11APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
ATTENUATION BASIN SECTIONS BASIN 9APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
SURFACE WATER DRAINAGE MANHOLE SCHEDULE SHEET 2 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
SURFACE WATER DRAINAGE PHASE 1 HIGHWAY INFRASTRUCTURE LONG SECTIONS SHEET 15APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
SIGNS AND LINES KEY AND NOTES PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Link 110 Cross Section Sheet 2APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Site Clearance Sheet 11APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
TYPICAL BUS STOP DETAILAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
ROUNDABOUT MAINTENANCE LAYBY VEHICLE TRACKING SHEET 1APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
TRAFFIC SIGNS CONSTRUCTION DETAILS SHEET 12A PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Link 110 Cross Section Sheet 3APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
SIGNAGE LAYOUT SHEET 11 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
KERBING SHEET 10APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Private/LLFA Cutoff Ditch Long Sections Sheet 1 Phase 1 Highway InfrastructureAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Link 102 Long Section CH 000.000m - CH 455.490mAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
ATTENUATION BASIN SECTIONS BASIN 5APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Link 306 Long Section CH 000.000m - CH 23.502mAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
SURFACE WATER DRAINAGE LONG SECTIONS SHEET 11APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
DMRB COMPLIANT DRAWING EASTERN LINK ROUNDABOUT 1 (EL RBT SHEET 4APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
GENERAL ARRANGEMENT SHEET 13APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
HIF Infrastructure 7APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
DRAINAGE LAYOUT SHEET 30APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
HGV - VEHICLE TRACKING EASTERN LINK ROUDNABOUT 1, LINK 101, LINK LINK 301, LINK 302 SHEET 1APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
PRIVATE/LLFA CUTOFF DITCH LONG SECTIONS SHEET 4 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
SURFACE WATER DRAINAGE LONG SECTIONS SHEET 22APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
PAVEMENT AND SURFACING SHEET 19APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
TRAFFIC SIGNS CONSTRUCTION DETAILS SHEET 22A PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
DMRB COMPLIANT DRAWING A509 ROUNDABOUT 1 (A509 RBT 1) SHEET 4APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
KERBING SHEET 9 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 110, LINK 503 FIRE TENDER JUNCTION TRACKINGAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Link 512 Cross SectionsAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
General Arrangement Sheet 12APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
General Arrangement Sheet 14APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Link 304 Cross SectionsAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Site Clearance Sheet 12APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
JUNCTION VISIBILITY LINK 501 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF19 Jul 2024View
SIGNAGE LAYOUT SHEET 22 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Traffic Signs Construction Details Sheet 20 Phase 1 Highway InfrastructureAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 108 PUMPING STATION ACCESS JUNCTION VISIBILITYAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Pavement and Surfacing Sheet 20APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
EASTERN LINK RBT 2 LONGITUDINAL SECTION ROUNDABOUT APPROACH ARMS SHEET 3 OF 3 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
SURFACE WATER DRAINAGE PHASE 1 HIGHWAY INFRASTRUCTURE MANHOLE SCHEDULE SHEET 4APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
GENERAL ARRANGEMENT SHEET 20APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Highway Drainage MicroDrainage Calculations - HIF - 8APPCONIN - Condition Submitted Details · PDF19 Jul 2024View
A509 RBT 2 Longitudinal Section Roundabout Approach Arms Sheet 3 of 3APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
JUNCTION VISIBILITY LINK 304APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
JUNCTION VISIBILITY A509 ROUNDABOUT 1APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Surface Water Drainage Phase 1 Highway Infrastructure Headwall Schedule Agreement 2APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
SIGNAGE LAYOUT SHEET 09 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
DMRB COMPLIANT DRAWING M1 J14 ROUNDABOUT 1 (M1 J14 RBT) SHEET 2APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
SURFACE WATER DRAINAGE LONG SECTIONS SHEET 12APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Fencing Sheet 29APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Surface Water Drainage Long Sections Sheet 13APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Private/LLFA Cutoff Ditch Long Sections Sheet 3 Phase 1 Highway InfrastructureAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
EASTERN LINK RBT 1 LONGITUDINAL SECTION CH 000.000m - CH 163.363m SHEET 1 OF 3APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Footways and Paved Areas Sheet 22APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
KERBING SHEET 19APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Cranfield Link RBT Longitudinal Section Roundabout Approach Arms Sheet 3 of 3APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 512 BOX VAN TRACKINGAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
PAVEMENT CONSTRUCTION DETAILS ON STRUCTURES SHEET 1APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
DMRB COMPLIANT DRAWING EASTERN LINK ROUNDABOUT 2 (EL RBT 2) SHEET 1APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Drainage Layout Sheet 9 Phase 1 Highway InfrastructureAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Surface Water Drainage Long Sections Sheet 19APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Pavement and Surfacing Sheet 17APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
DMRB COMPLIANT DRAWING A509 ROUNDABOUT 1 (A509 RBT 1) SHEET 2APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
GENERAL ARRANGEMENT SUB STATION 2APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Road Marking Layout Sheet 19 Phase 1 Highway InfrastructureAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
SURFACE WATER DRAINAGE LONG SECTIONS SHEET 18APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
TRAFFIC SIGNS CONSTRUCTION DETAILS SHEET 11A PHASE 2 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Highway Drainage Typical Details Sheet 3APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Attenuation Basin Sections Basin 5APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
PROPOSED CONTOURS SHEET 10APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Private/LLFA Cutoff Ditch Long Sections Sheet 4 (Phase 1 Highway Infrastructure)APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
PAVEMENT CONSTRUCTION DETAILS ON STRUCTURES SHEET 3APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
FOOTWAYS AND PAVED AREAS SHEET 10APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Pavement Construction Details Sheet 6APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 511 REFUSE VEHICLE TRACKINGAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
SURFACE WATER DRAINAGE HEADWALL SCHEDULE AGREEMENTAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
PAVEMENT CONSTRUCTION DETAILS SHEET 6APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Link 304 T3 Long Section CH 000.000m - CH 25.000mAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 103 CROSS SECTIONS SHEET 1 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Site Clearance Sheet 20APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
ROUNDABOUT MAINTENANCE LAYBY VEHICLE TRACKING SHEET 2APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Site Clearance Sheet 30APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
SIGNAGE LAYOUT SHEET 19 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Surface Water Drainage Manhole Schedule Sheet 10APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
FENCING SHEET 11APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
DRAINAGE LAYOUT SHEET 23APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
TRAFFIC SIGNS CONSTRUCTION DETAILS SHEET 17A PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
ATTENUATION BASIN SECTIONS BASIN 16APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Surface Water Drainage Key PlanAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 512 REFUSE VEHICLE TRACKINGAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Surface Water Drainage Long Sections Sheet 14APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Pavement Key and NotesAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 101 CROSS SECTION SHEET 3 OF 4APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Contours Sheet 30APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Link 102 Cross Section Sheet 2 of 3APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
SURFACE WATER DRAINAGE LONG SECTIONS SHEET 49APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Link 110 Cross Section Sheet 4APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Kerbing Sheet 11APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Surface Water Drainage Long Sections Sheet 6APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Covering Letter and C59 AnnexAPPSUPP - Other Supporting Documents/Information · PDF3 Sept 2024View
DMRB COMPLIANT DRAWING EASTERN LINK ROUNDABOUT 2 (EL RBT 2) SHEET 4APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
PRIVATE/ LLFA CUTOFF DITCHES OVERVIEW PLAN PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
FOOTWAYS AND PAVED AREAS SHEET 21APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
SURFACE WATER DRAINAGE HEADWALL SCHEDULE AGREEMENT 8APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
DRAINAGE LAYOUT SHEET 25APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
ROAD MARKING LAYOUT SHEET 12 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Site Clearance Sheet 10APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Surface Water Drainage Manhole Schedule Sheet 11APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Link 302 Long Section CH 000.000m - CH208.894mAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 110 CROSS SECTION SHEET 3APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
KERBING SHEET 30APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
VEHICLE RESTRAINT SYSTEM SHEET 15 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Link 504 Cross Section Sheet 1APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
CRANFIELD LINK RBT LONGITUDINAL SECTION ROUNDABOUT APPROACH ARMS SHEET 2 OF 3APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
DRAINAGE LAYOUT SHEET 27APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
KERBING AND FOOTWAY STANDARD DETAILS SHEET 2APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
SITE CLEARANCE SHEET 24APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
DRAINAGE LAYOUT SHEET 26 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
PROPOSED CONTOURS SHEET 9 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
HGV - VEHICLE TRACKING A509 ROUNDABOUT 2, LINK 302, LINK 303, LINK 501APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Highway Drainage Microcalculations - HIF - 1APPCONIN - Condition Submitted Details · PDF19 Jul 2024View
TRAFFIC SIGNS CONSTRUCTION DETAILS SHEET 10 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
EL RBT 1 Longitudinal Section Roundabout Approach Arms Sheet 3 of 3APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
SURFACE WATER DRAINAGE LONG SECTIONS SHEET 16APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
GENERAL ARRANGEMENT SUB STATION 4APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Site Clearance Sheet 18APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
PROPOSED CONTOURS SHEET 29APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
LINK 304, LINK 110 REFUSE VEHICLE JUNCTION TRACKINGAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
DRAINAGE LAYOUT SHEET 10APPCONIN - Condition Submitted Details · PDF19 Jul 2024View
Traffic Signs Construction Details Sheet 12B Phase 1 Highway InfrastructureAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
PAVEMENT AND SURFACING SHEET 9 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
SURFACE WATER DRAINAGE LONG SECTIONS SHEET 6APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Eastern Link RBT 2 Longitudinal Section Roundabout Approach Arms Sheet 2 of 3 Phase 1 Highway InfrastructureAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
FOOTWAYS AND PAVED AREAS SHEET 12APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Road Marking Layout Sheet 20 Phase 1 Highway InfrastructureAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
EL RBT 1 Longitudinal Section Roundabout Approach Arms Sheet 2 of 3APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
PRIVATE/LLFA CUTOFF DITCHES LONG SECTIONS SHEET 2 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Link 303 Cross SectionsAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
GENERAL ARRANGEMENT SUB STATION 2APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
DMRB COMPLIANT DRAWING EASTERN LINK ROUNDABOUT 1 (EL RBT 1) SHEET 3APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
TRAFFIC SIGNS CONSTRUCTION DETAILS SHEET 20 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
SITE CLEARANCE SHEET 12APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Highway Drainage MicroDrainage Calculations - HIF - 7APPCONIN - Condition Submitted Details · PDF19 Jul 2024View
A509 RBT 2 Longitudinal Section CH 000.00m - CH 116.239m Sheet 1 of 3APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Traffic Signs Construction Details Sheet 11A Phase 1 Highway InfrastructureAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Surface Water Drainage Flow Control ScheduleAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
HIGHWAY DRAINAGE TYPICAL DETAILS SHEET 3APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
SIGNAGE LAYOUT SHEET 09 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
FOOTWAYS AND PAVED AREAS SHEET 11APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Proposed Contours Sheet 12APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
GENERAL ARRANGEMENT SHEET 11APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Phase 1 Drawing List (PDF)APPCONIN - Condition Submitted Details · PDF19 Jul 2024View
DRAINAGE LAYOUT SHEET 28APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Site Clearance Sheet 22APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
EASTERN LINK ROUNDABOUT 2 SUBWAY - CONTOURSAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
HIGHWAY DRAINAGE TYPICAL DETAILS SHEET 2APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Footways and Paved Areas Sheet 29APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
FENCING SHEET 9 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Link 107 Longitudinal Section CH 730.000m - CH 757.927m Phase 1 Highway InfrastructureAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 511 BOX VAN TRACKINGAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Surface Water Drainage Phase 1 Highway Infrastructure Long Sections Sheet 15APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
General Arrangement Sheet 10APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
TRAFFIC SIGNS CONSTRUCTION DETAILS SHEET 14A PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
LINK 302 CROSS SECTIONSAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
FENCING SHEET 10APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Footways and Paved Areas Sheet 14APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
KERBING SHEET 14APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
PAVEMENT AND SURFACING SHEET 13APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
LINK 102 ARTICULATED BUS BUS STOP TRACKINGAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
SIGNAGE LAYOUT SHEET 30 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
FENCING SHEET 18APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
LINK 305 LONG SECTION CH 000.000m - CH 60.000mAPPCONIN - Condition Submitted Details · PDF13 Nov 2024View
DMRB COMPLIANT DRAWING M1 J14 ROUNDABOUT 1 (M1 J14 RBT) SHEET 1APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
VEHICLE RESTRAINT SYSTEM SHEET 9 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF18 Jul 2024View
DRAINAGE LAYOUT SHEET 13 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
FENCING SHEET 29APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
DMRB COMPLIANT DRAWING A509 ROUNDABOUT 1 (A509 RBT 1) SHEET 2APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 512 REFUSE VEHICLE TRACKINGAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
DMRB COMPLIANT DRAWING CRANFIELD LINK (CL RBT) SHEET 3APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
HGV - VEHICLE TRACKING EASTERN LINK ROUNDABOUT 2, LINK 102, LINK 502APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
SURFACE WATER DRAINAGE LONG SECTIONS SHEET 8APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
DMRB COMPLIANT DRAWING A509 ROUNDABOUT 1 (A509 RBT 1) SHEET 4APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Drainage Layout Sheet 20APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Eastern Link RBT 1 Longitudinal Section Subway & Redway Ramps Sheet 2APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 107 CROSS SECTIONS PHASE 1 INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Surface Water Drainage Long Sections Sheet 22APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Site Clearance Sheet 29APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
DMRB COMPLIANT DRAWING EASTERN LINK ROUNDABOUT 1 (EL RBT 1) SHEET 1APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 102 CROSS SECTION SHEET 2 OF 3APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
SITE CLEARANCE SHEET 14APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
DRAINAGE LAYOUT SHEET 20APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
CRANFIELD LINK (CL RBT) ROUNDABOUT VISIBILITYAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
ROAD MARKING LAYOUT SHEET 19 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
FENCING SHEET 9 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Footways and Paved Areas Sheet 18APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
GENERAL ARRANGEMENT SHEET 17APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
PAVEMENT KEY AND NOTESAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
DMRB COMPLIANT DRAWING EASTERN LINK ROUNDABOUT 2 (EL RBT 2) SHEET 2APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
KERBING AND FOOTWAY STANDARD DETAILS SHEET 5APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Traffic Signs Construction Details Sheet 13B Phase 1 Highway InfrastructureAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 101 CROSS SECTION SHEET 4 OF 4APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Link 101 Cross Section Sheet 4 of 4APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Traffic Signs Construction Details Sheet 18 Phase 1 Highway InfrastructureAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 510 PUMPING STATION ACCESS JUNCTION VISIBILITYAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
SURFACE WATER DRAINAGE OVERVIEW PLAN PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Proposed Contours Sheet 19APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Link 501 Cross Sections Sheet 2APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
VEHICLE RESTRAINT SYSTEM SHEET 12APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
[Superseded] Covering letterAPPSUPER - Superseded Plans · PDF18 Jul 2024View
Highway Drainage Typical Details Sheet 4APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 503 CROSS SECTIONAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
LINK 108 LONGITUDINAL SECTION CH 000.000m - CH 548.651mAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
LINK 108 CROSS SECTIONS SHEET 1APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
JUNCTION VISIBILITY LINK 301APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Traffic Signs Construction Details Sheet 14A Phase 1 Highway InfrastructureAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
SITE CLEARANCE SHEET 29APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
PAVEMENT AND SURFACING SHEET 22APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Drainage Layout Sheet 30APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
DMRB COMPLIANT DRAWING A509 ROUNDABOUT 2 (A509 RBT 2) SHEET 1APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
SIGNAGE LAYOUT SHEET 22 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Pavement and Surfacing Sheet 13APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
FENCING SHEET 17APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Vehicle Restraint System Sheet 14APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
SITE CLEARANCE SHEET 19APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Footways and Paved Areas Sheet 30APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
PAVEMENT AND SURFACING SHEET 10APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
SITE CLEARANCE SHEET 17APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
VEHICLE RESTRAINT SYSTEM SHEET 22APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
SIGNAGE LAYOUT SHEET 30 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
JUNCTION VISIBILITY A509 ROUNDABOUT 1APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Pavement and Surfacing Sheet 19APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Pavement and Surfacing Sheet 18APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Proposed Contours Sheet 9 Phase 1 Highway InfrastructureAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
HGV - VEHICLE TRACKING A509 ROUNDABOUT LINK 108, LINK 509, LINK 510APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 305 CROSS SECTION SHEET 1APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Drainage Layout Sheet 29APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
DRAINAGE LAYOUT SHEET 17APPCONIN - Condition Submitted Details · PDF19 Jul 2024View
A509 RBT 1 SUBWAY - FENCINGAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Link 108 Cross Sections Sheet 2APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Link 102 Cross Section Sheet 3 of 3APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Surface Water Drainage Manhole Schedule Sheet 5 (Phase 1 Highway Infrastructure)APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 102 LONG SECTION CH 000.000m - CH 455.490mAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Drainage Layout Sheet 26 (Phase 1 Highway Infrastructure)APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
DMRB COMPLIANT DRAWING EASTERN LINK ROUNDABOUT 1 (EL RBT 1) SHEET 2APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Surface Water Drainage Long Sections Sheet 18APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
ROAD MARKING LAYOUT SHEET 12 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
SURFACE WATER DRAINAGE MANHOLE SCHEDULE SHEET 11APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Highway Drainage Typical Details Culvert 25APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Attenuation Basin Sections Basin 15APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
GENERAL ARRANGEMENT SHEET 21APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
GENERAL ARRANGEMENT HEALTH HUB - LINK 108APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
A509 RBT 1 Longitudinal Section CH 000.000m - CH 179.071m Sheet 1 of 3APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
A509 RBT 1 Longitudinal Section Subway & Redway Ramps Sheet 2 Phase 1 InfrastructureAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
SITE CLEARANCE SHEET 22APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Drainage Layout Sheet 25APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
PAVEMENT AND SURFACING SHEET 11APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Fencing Sheet 14APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Link 103 Cross Sections Sheet 1 Phase 1 Highway InfrastructureAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
SIGNAGE LAYOUT SHEET 10 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
KERBING SHEET 15 PHASE 1 HIGHWAY INFRASTRUCTURE [duplicate]APPCONIN - Condition Submitted Details · PDF19 Jul 2024View
Vehicle Restraint System Key and NotesAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
PRIVATE/LLFA CUTOFF DITCH LONG SECTIONS SHEET 1 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
LINK 301 CROSS SECTIONSAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Kerbing Sheet 12APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
General Arrangement Sheet 13APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
TRAFFIC SIGNS CONSTRUCTION DETAILS SHEET 19 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
SIGNAGE LAYOUT SHEET 17 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
JUNCTION VISIBILITY LINK 503APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
PAVEMENT CONSTRUCTION DETAILS SHEET 5APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Link 511 Longitudinal Section CH 000.000m - CH 25.569mAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
CONTOURS SHEET 30APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
GENERAL ARRANGEMENT SUB STATION 5APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
HGV - VEHICLE TRACKING EASTERN LINK ROUNDABOUT 1, LINK 101, LINK 102, LINK 301, LINK 302 SHEET 2APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
GENERAL ARRANGEMENT PYMS SUB STATIONAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Pavement Construction Details Sheet 3APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 501 CROSS SECTIONS SHEET 2APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Surface Water Drainage Manhole Schedule Sheet 2 (Phase 1 Highway Infrastructure)APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Cranfield Link RBT Longitudinal Section CH 000.000m - CH 163.363m Sheet 1 of 3APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 101 CROSS SECTION SHEET 2 OF 4APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
HGV - VEHICLE TRACKING EASTERN LINK ROUDNABOUT 1, LINK 101, LINK LINK 301, LINK 302 SHEET 1APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
GENERAL ARRANGEMENT SHEET 30APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
A509 RBT 1 LONGITUDINAL SECTION SUBWAY & REDWAY RAMPS SHEET 2 PHASE 1 INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
LINK 304 T3 LONG SECTION CH 000.000m -- CH 25.000mAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Traffic Signs Construction Details Sheet 19 Phase 1 Highway InfrastructureAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Application FormAPPFRWEB - Application Form - Web Form · PDF18 Jul 2024View
EL RBT 2 ROUNDABOUT VISIBILITYAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Kerbing Sheet 20APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
SIGNAGE LAYOUT SHEET 12 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
KERBING SHEET 15 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
ATTENUATION BASIN SECTIONS POND 18-2APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Link 110 Cross Section Sheet 1APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Private/LLFA Cutoff Ditches Long Sections Sheet 2 Phase 1 Highway InfrastructureAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
TRAFFIC SIGNS CONSTRUCTION DETAILS SHEET 12B PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Eastern Link RBT 1 Longitudinal Section CH 000.000m - CH 163.363m Sheet 1 of 3APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 108 CROSS SECTIONS SHEET 2APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
SITE CLEARANCE SHEET 11APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Link 102 Cross Section Sheet 1 of 3APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 108 - 512 BUS STOP TRACKINGAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
SITE CLEARANCE SHEET 9 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
SURFACE WATER DRAINAGE LONG SECTIONS SHEET 19APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Proposed Contours Sheet 18APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Attenuation Basin Sections Basin 16APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
ATTENUATION BASIN SECTIONS BASIN 15APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Surface Water Drainage Headwall Schedule Section 9APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
DMRB COMPLIANT DRAWING M1 J14 ROUNDABOUT 1 (M1 J14 RBT) SHEET 3APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
GENERAL ARRANGEMENT SHEET 21APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
PAVEMENT AND SURFACING SHEET 20APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
A509 RBT 1 SUBWAY - CONTOURSAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 302 LONG SECTION CH 000.000m - CH 208.894mAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
KERBING SHEET 22APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
JUNCTION VISIBILITY LINK 306APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
SURFACE WATER DRAINAGE PHASE 1 HIGHWAY INFRASTRUCTURE HEADWALL SCHEDULE AGREEMENT 1APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
EASTERN LINK ROUNDABOUT 2 SUBWAY - FOOTWAYS AND PAVED AREASAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
JUNCTION VISIBILITY LINK 511APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
LINK 501 LONG SECTION CH 000.000m - CH 600.000mAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
CONTOUR KEY AND NOTESAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
SIGNAGE LAYOUT SHEET 10 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
TRAFFIC SIGNS CONSTRUCTION DETAILS SHEET 15A PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
JUNCTION VISIBILITY EASTERN LINK ROUNDABOUT 2APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 502 LONG SECTION CH 000.000m - CH 50.000mAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
VEHICLE RESTRAINT SYSTEM SHEET 21APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
LINK 304, LINK 110 BOX VAN JUNCTION TRACKINGAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
DMRB COMPLIANT DRAWING EASTERN LINK ROUNDABOUT 2 (EL RBT 2) SHEET 2APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
DMRB COMPLIANT DRAWING M1 J14 ROUNDABOUT 1 (M1 J14 RBT) SHEET 4APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Surface Water Drainage Phase 1 Highway Infrastructure Long Sections Sheet 10APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
DRAINAGE LAYOUT SHEET 18APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
HIGHWAY DRAINAGE TYPICAL DETAILS CULVERT 25APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
FOOTWAYS AND PAVED AREAS SHEET 18APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
CRANFIELD LINK (CL RBT) ROUNDABOUT VISIBILITYAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
LINK 108 - 511 AND 108 - 512 THROUGH JUNCTION TRACKINGAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
FOOTWAYS AND PAVED AREAS SHEET 13APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
A509 RBT 1 SUBWAY - FOOTWAYS AND PAVED AREAS PHASE 2 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
DRAINAGE LAYOUT SHEET 12APPCONIN - Condition Submitted Details · PDF19 Jul 2024View
Footways and Paved Areas Sheet 11APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Traffic Signs Construction Details Sheet 12A Phase 1 Highway InfrastructureAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
GENERAL ARRANGEMENT SHEET 18APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
DMRB COMPLIANT DRAWING EASTERN LINK ROUNDABOUT 1 (EL RBT SHEET 1APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Proposed Contours Sheet 10APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
A509 RBT 1 LONGITUDINAL SECTION ROUNDABOUT APPROACH ARMS SHEET 2 OF 3APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
DRAINAGE LAYOUT SHEET 15 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
SIGNAGE LAYOUT SHEET 20 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Vehicle Restraint System Sheet 20APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Pavement Construction Details on Structures Sheet 1APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Pavement Construction Details Sheet 1APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Surface Water Drainage Long Sections Sheet 7APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
PAVEMENT CONSTRUCTION DETAILS SHEET 3APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
PAVEMENT AND SURFACING SHEET 15 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Decision Notice · PDF20 Nov 2024View
TRAFFIC SIGNS CONSTRUCTION DETAILS SHEET 9A PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
VEHICLE RESTRAINT SYSTEM SHEET 17APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
SURFACE WATER DRAINAGE PHASE 1 HIGHWAY INFRASTRUCTURE MANHOLE SCHEDULE SHEET 3APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
DMRB COMPLIANT DRAWING EASTERN LINK ROUNDABOUT 1 (EL RBT 1) SHEET 2APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
General Arrangement Sheet 20APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
ROAD MARKING LAYOUT SHEET 17 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
TRAFFIC SIGNS CONSTRUCTION DETAILS SHEET 30 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
SIGNAGE LAYOUT SHEET 17 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
KERBING AND FOOTWAY STANDARD DETAILS SHEET 4APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
SURFACE WATER DRAINAGE KEY PLANAPPCONIN - Condition Submitted Details · PDF19 Jul 2024View
SURFACE WATER DRAINAGE MANHOLE SCHEDULE SHEET 5 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
FOOTWAYS AND PAVED AREAS SHEET 29APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Link 302 Cross SectionsAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
JUNCTION VISIBILITY A509 ROUNDABOUT 2APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Link 509 Cross SectionsAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
SIGNAGE LAYOUT SHEET 18 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Attenuation Basin Sections Pond 18-2APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
HGV - VEHICLE TRACKING EASTERN LINK ROUNDABOUT 1, LINK 101, LINK 102, LINK 301, LINK 302 SHEET 2APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
EASTERN LINK RBT 2 LONGITUDINAL SECTION CH 000.000m - CH 179.071m SHEET 1 OF 3APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
LINK 107 LONGITUDINAL SECTION CH 730.000m - CH 757.927m PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
GENERAL ARRANGEMENT SHEET 30APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
A509 RBT 1 LONGITUDINAL SECTION CH 000.000m - CH 179.071m SHEET 1 OF 3APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Link 108 Cross Sections Sheet 1 Phase 1 InfrastructureAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
JUNCTION VISIBILITY LINK 304APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
FENCING SHEET 21APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
JUNCTION VISIBILITY M1 J14APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Link 503 Cross SectionAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Traffic Signs Construction Details Sheet 22A Phase 1 Highway InfrastructureAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
ROAD MARKING LAYOUT SHEET 15 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
SURFACE WATER DRAINAGE MANHOLE SCHEDULE SHEETAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
DRAINAGE LAYOUT SHEET 19APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Drainage Layout Sheet 28APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
DMRB COMPLIANT DRAWING A509 ROUNDABOUT 2 (A509 RBT2) SHEET 2APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Drainage Layout Sheet 24APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
SURFACE WATER DRAINAGE LONG SECTIONS SHEET 14APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
LINK 108 - 511 AND 108 - 512 THROUGH JUNCTION TRACKINGAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
SURFACE WATER DRAINAGE LONG SECTIONS SHEET 23APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
LINK 101 LONG SECTION CH 000.000m - CH440.570mAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
GENERAL ARRANGEMENT SHEET 9 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF19 Jul 2024View
A509 RBT 1 Longitudinal Section Subway & Redway Ramps Sheet 1 Phase 1 InfrastructureAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Link 101 Cross Section Sheet 2 of 4APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
DMRB COMPLIANT DRAWING A509 ROUNDABOUT 2 (A509 RBT 2) SHEET 4APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
FOOTWAYS AND PAVED AREAS SHEET 20APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
SITE CLEARANCE SHEET 18APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
PAVEMENT AND SURFACING SHEET 17APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Kerbing and Footway Standard Details Sheet 2APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
PROPOSED CONTOURS SHEET 13APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
SURFACE WATER DRAINAGE LONG SECTIONS SHEET 21APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
SITE CLEARANCE SHEET 13APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Surface Water Drainage Long Sections Sheet 12APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
JUNCTION VISIBILITY LINK 511APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Highway Drainage Notes and LegendAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Site Clearance Sheet 14APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Site Clearance Sheet 23APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
HGV - VEHICLE TRACKING EASTERN LINK ROUNDABOUT 2, LINK 102, LINK 502APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
SITE CLEARANCE SHEET 30APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Fencing Sheet 13APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
VEHICLE RESTRAINT SYSTEM SHEET 9 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
A509 RBT 2 LONGITUDINAL SECTION ROUNDABOUT APPROACH ARMS SHEET 2 OF 3APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Surface Water Drainage Long Sections Sheet 11APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Pavement Construction Details Sheet 7APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
HGV AND BOX VAN CRANFIELD ROUNDABOUT JUNCTION TRACKINGAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
KERBING SHEET 18APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Fencing Sheet 21APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Traffic Signs Construction Details Simmonsign Uplighter Phase 1 Highway InfrastructureAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
KERBING SHEET 15 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
LINK 110, LINK 503 BOX VAN JUNCTION TRACKINGAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Surface Water Drainage Long Sections Sheet 48APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Footways and Paved Areas and Kerbing Key and NotesAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
FENCING SHEET 30APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
SIGNAGE LAYOUT SHEET 14 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 509 LONGITUDINAL SECTION CH 000.000m - CH 75.000mAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
ROAD MARKING LAYOUT SHEET 10 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF19 Jul 2024View
VEHICLE RESTRAINT SYSTEM SHEET 15 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 102 15m BUS BUS STOP TRACKINGAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Link 101 Cross Section Sheet 1 of 4APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Kerbing Sheet 30APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 108 - 511 BUS STOP TRACKINGAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
SURFACE WATER DRAINAGE LONG SECTIONS SHEET 9APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
LINK 512 CROSS SECTIONSAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Fencing Sheet 20APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
PROPOSED CONTOURS SHEET 18APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Vehicle Restraint System Sheet 13APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
DMRB COMPLIANT DRAWING A509 ROUNDABOUT 2 (A509 RBT2) SHEET 2APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
DMRB COMPLIANT DRAWING EASTERN LINK ROUNDABOUT 1 (EL RBT 1) SHEET 3APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Eastern Link RBT 2 Longitudinal Roundabout Approach Arms Sheet 3 of 3 Phase 1 Highway InfrastructureAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
NEWPORT ROAD TURNING HEAD TRACKINGAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
DMRB COMPLIANT DRAWING CRANFIELD LINK (CL RBT) SHEET 3APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
SURFACE WATER DRAINAGE FLOW CONTROL SCHEDULEAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
JUNCTION VISIBILITY EASTERN LINK ROUNDABOUTAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
SURFACE WATER DRAINAGE PHASE 1 HIGHWAY INFRATSRUCTURE LONG SECTIONS SHEET 10APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
SURFACE WATER DRAINAGE LONG SECTIONS SHEET 17APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
LINK 304, LINK 110 FIRE TENDER JUNCTION TRACKINGAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Pavement and Surfacing Sheet 14APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
DMRB COMPLIANT DRAWING EASTERN LINK ROUNDABOUT 2 (EL RBT 2) SHEET 1APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Footways and Paved Areas Sheet 13APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
TRAFFIC SIGNS CONSTRUCTION DETAILS SHEET 13B PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
VEHICLE RESTRAINT SYSTEM SHEET 20APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
A509 RBT 1 ROUNDABOUT VISIBILITYAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
LINK 110 CROSS SECTION SHEET 2APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
SURFACE WATER DRAINAGE HEADWALL SCHEDULE SECTION 9APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
JUNCTION VISIBILITY M1 J14APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Surface Water Drainage Long Sections Sheet 17APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Kerbing and Footway Standard Details Sheet 5APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Eastern Link RBT 1 Longitudinal Section Subway & Redway Ramps Sheet 1APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
EASTERN LINK ROUNDABOUT 2 SUBWAY - CONTOURSAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
PAVEMENT AND SURFACING SHEET 12APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
A509 RBT 1 Longitudinal Section Roundabout Approach Arms Sheet 3 of 3APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 509 CROSS SECTIONSAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Pavement and Surfacing Sheet 11APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 108 - 512 BUS STOP TRACKINGAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
DMRB COMPLIANT DRAWING M1 J14 ROUNDABOUT 1 (M1 J14 RBT) SHEET 3APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
CRANFIELD LINK RBT LONGITUDINAL SECTION ROUNDABOUT APPROACH ARMS SHEET 3 OF 3APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Pavement and Surfacing Sheet 21APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
A509 RBT 1 SUBWAY - CONTOURSAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
LINK 304 LONG SECTION CH 000.000m - CH 151.145mAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
LINK 301 LONG SECTION CH 000.000m - CH 202.533mAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
GENERAL ARRANGEMENT SHEET 29APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
SITE CLEARANCE SHEET 28APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Surface Water Drainage Headwall Schedule Agreement 11APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Drainage Layout Sheet 27APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
EASTERN LINK RBT 2 LONGITUDINAL SECTION SUBWAY & REDWAY RAMPS SHEET 2APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
LINK 303 CROSS SECTIONSAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
PAVEMENT CONSTRUCTION DETAILS SHEET 2APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
BOX VAN - VEHICLE TRACKING A509 ROUNDABOUT LINK 108, LINK 509, LINK 510APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
LINK 304, LINK 110 HGV JUNCTION TRACKINGAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
DMRB COMPLIANT DRAWING A509 ROUNDABOUT 2 (A509 RBT2) SHEET 3APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
SIGNAGE LAYOUT SHEET 12 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF19 Jul 2024View
Proposed Contours Sheet 21APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Kerbing Sheet 14APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
EASTERN LINK RBT 1 SUBWAY - CONTOURSAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Link 110 Long Section CH 000.000m - CH 553.555mAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Link 504 Long Section CH 000.000m - CH 60.000mAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
PROPOSED CONTOURS SHEET 17APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
PAVEMENT AND SURFACING SHEET 30APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
EL RBT 1 ROUNDABOUT VISIBILITYAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
DMRB COMPLIANT DRAWING A509 ROUNDABOUT 2 (A509 RBT 2) SHEET 1APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
FOOTWAYS AND PAVED AREAS SHEET 9 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
JUNCTION VISIBILITY CRANFIELD LINK (CL RBT)APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Pavement and Surfacing Sheet 12APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Eastern Link Roundabout 2 Subway - Footways and Paved AreasAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Drainage Layout Sheet 23APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
DMRB COMPLIANT DRAWING EASTERN LINK ROUNDABOUT 2 (EL RBT 2) SHEET 3APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
ROAD MARKING LAYOUT SHEET 13 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
VEHICLE RESTRAINT SYSTEM SHEET 13APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Surface Water Drainage Phase 1 Highway Infrastructure Manhole Schedule Sheet 4APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Fencing Sheet 10APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
SIGNAGE LAYOUT SHEET 11 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
SITE CLEARANCE SHEET 9 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF19 Jul 2024View
GENERAL ARRANGEMENT HEALTH HUB - LINK 108APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Link 301 Cross SectionsAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Phase 1 Drawing ListAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
SITE CLEARANCE NOTES AND KEYAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
General Arrangement Sheet 11APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Kerbing Sheet 13APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
DMRB COMPLIANT DRAWING M1 J14 ROUNDABOUT 1 (M1 J14 RBT) SHEET 2APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Link 509 Longitudinal Section CH 000.000m - CH 75.000mAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
DMRB COMPLIANT DRAWING A509 ROUNDABOUT 1 (A509 RBT 1) SHEET 3APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Contours Sheet 22APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Attenuation Basin Sections Basin 9APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Fencing Sheet 22APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
EL RBT 1 LONGITUDINAL SECTION ROUNDBOUT APPROACH ARMS SHEET 2 OF 3APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
SURFACE WATER DRAINAGE LONG SECTIONS SHEET 13APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Drainage Layout Sheet 15 Phase 1 Highway InfrastructureAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Proposed Contours Sheet 15 Phase 1 Highway InfrastructureAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Attenuation Basin Sections Basin 18A - 1APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Vehicle Restraint System Sheet 17APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Link 305 Cross Section Sheet 1APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
SIGNAGE LAYOUT SHEET 15 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Traffic Signs Construction Details Sheet 13A Phase 1 Highway InfrastructureAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
FENCING CONSTRUCTION DETAILS SHEET 1APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
ROAD MARKING LAYOUT SHEET 15 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
PROPOSED CONTOURS SHEET 19APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
LINK 101 CROSS SECTION SHEET 1 OF 4APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
LINK 511 BOX VAN TRACKINGAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
LINK 511 BUS STOP AND THROUGH JUNCTION TRACKINGAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Surface Water Drainage Long Sections Sheet 23APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
CRANFIELD LINK RBT LONGITUDINAL SECTION CH 000.000m - CH 163.363m SHEET 1 OF 3APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
PAVEMENT AND SURFACING SHEET 9 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
KERBING SHEET 11APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
SITE CLEARANCE SHEET 26APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Kerbing Sheet 17APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
SITE CLEARANCE SHEET 25APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
A509 RBT 1 SUBWAY - FENCINGAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
SITE CLEARANCE SHEET 20APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
HIF Infrastructure 8APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
PROPOSED CONTOURS SHEET 11APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
General Arrangement Sheet 19APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK511 LONGITUDINAL SECTION CH 000.000m - CH 25.569mAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
FOOTWAYS AND PAVED AREAS AND KERBING KEY AND NOTESAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
LINK 503 LONG SECTION CH 000.000m - CH 101.135mAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
SURFACE WATER DRAINAGE LONG SECTIONS SHEET 45APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
TYPICAL BUS STOP DETAILAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
LINK 108 CROSS SECTIONS SHEET 1 PHASE 1 INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
PRIVATE/LLFA CUTOFF DITCH LONG SECTIONS SHEET 3 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Footways and Paved Areas Sheet 19APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Surface Water Drainage Long Sections Sheet 49APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
HIGHWAY DRAINAGE TYPICAL DETAILS SHEET 1APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Highway Drainage Typical Details Sheet 1APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Link 103 Long Section CH 000.00m - CH 25.000m Phase 1 Highway InfrastructureAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Drainage Layout Sheet 19APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
GENERAL ARRANGEMENT SUB STATION 5APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
DMRB COMPLIANT DRAWING A509 ROUNDABOUT 1 (A509 RBT 1) SHEET 1APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
SURFACE WATER DRAINAGE MANHOLE SCHEDULE SHEET 10APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
A509 RBT 1 SUBWAY - KERBING PHASE 2 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
General Arrangement Sheet 18APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Kerbing Sheet 10APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 304, LINK 110 HGV JUNCTION TRACKINGAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
Fencing Sheet 19APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
VEHICLE RESTRAINT SYSTEM SHEET 14APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
LINK 304, LINK 110 REFUSE VEHICLE JUNCTION TRACKINGAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
DMRB COMPLIANT DRAWING EASTERN LINK ROUNDABOUT 2 (EL RBT 2) SHEET 4APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
EASTERN LINK RBT 1 SUBWAY - CONTOURSAPPCONIN - Condition Submitted Details · PDF15 Jul 2024View
A509 RBT 2 ROUNDABOUT VISIBILITYAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Link 101 Cross Section Sheet 3 of 4APPCONIN - Condition Submitted Details · PDF15 Jul 2024View
LINK 103 LONG SECTION CH 000.00m - CH 25.000m SHEET 1 PHASE 1 HIGHWAY INFRASTRUCTUREAPPCONIN - Condition Submitted Details · PDF22 Jul 2024View
ROUNDABOUT MAINTENANCE LAYBY VEHICLE TRACKING SHEET 2APPCONIN - Condition Submitted Details · PDF22 Jul 2024View
Surface Water Drainage Phase 1 Highway Infrastructure Long Sections Sheet 20APPCONIN - Condition Submitted Details · PDF15 Jul 2024View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Approved
Decision Notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.