Council planning record

Creation of a mixed use development comprising three separate components: an office building of up to 18 storeys (Use Class E (g)) with ground floor commercial, leisure, food and drink uses (All Use Class E (g)) and/ or drinking establishment (Sui Generis) with rooftop plant and roof top amenity; a residential building up to 37 storeys (Use Class C3a) with roof top plant level, basement car and cycle parking; and a residential building up to 49 storeys (Use Class C3) with ground floor commercial, leisure, food and drink uses (Use Class E) and/ or drinking establishment (Sui Generis), roof top plant level, basement cycle parking, together with landscaping and public realm, drainage, sub-station, servicing and access arrangements, surface car parking for 7 cars, highway alterations and other associated works following demolition of the existing building complex.

Albert Bridge House Bridge Street Manchester M3 5AH

FinalReference: 143164/FO/2025Manchester City Council

Last published check: 15 Oct 2026, 18:49. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Valid date

    Published milestoneCouncil source
  2. Consultation Deadline Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  3. Date of committee

    Published milestoneCouncil source
  4. Target decision date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Final
Application type
Full planning permission
Received
Not published
Validated
19 Jun 2025
Determination deadline
28 Aug 2026
Local authority
Manchester City Council

Application overview

Creation of a mixed use development comprising three separate components: an office building of up to 18 storeys (Use Class E (g)) with ground floor commercial, leisure, food and drink uses (All Use Class E (g)) and/ or drinking establishment (Sui Generis) with rooftop plant and roof top amenity; a residential building up to 37 storeys (Use Class C3a) with roof top plant level, basement car and cycle parking; and a residential building up to 49 storeys (Use Class C3) with ground floor commercial, leisure, food and drink uses (Use Class E) and/ or drinking establishment (Sui Generis), roof top plant level, basement cycle parking, together with landscaping and public realm, drainage, sub-station, servicing and access arrangements, surface car parking for 7 cars, highway alterations and other associated works following demolition of the existing building complex.

Proposal details

Reference
143164/FO/2025
Alternative references
PP-14073241
Ward
Deansgate
Agent
Mr Adam Watson

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Albert Bridge House Bridge Street Manchester M3 5AH

This record has no verified map location.

Documents 193 of 193

DocumentPublishedAction
Airport Safeguarding 18 Sep.pdfConsultee Comment · PDF18 Sept 2025View
086313-CUR-XX-XX-T-TP-00003-P04_WMS.pdfWaste Management · PDF24 Sept 2025View
Decision Notice - 143164_FO_2025 · PDF15 Oct 2026View
ABH - Statement of Community Involvement.pdfSupporting Information · PDF10 Jun 2025View
FRT 30 Sep.pdfConsultee Comment · PDF30 Sept 2025View
0476-SEW-CC-18-DR-A-PL1163.pdfPlan · PDF13 Oct 2025View
718689.pdfPublic Comment · PDF31 Jul 2025View
760088.pdfOther · PDF24 Oct 2025View
EHO 7 Oct.pdfConsultee Comment · PDF7 Oct 2025View
GMP 5 Sep.pdfConsultee Comment · PDF5 Sept 2025View
0476-SEW-ZZ-40-DR-A-PL1040.pdfPlan · PDF13 Oct 2025View
734686.pdfPublic Comment · PDF12 Sept 2025View
Highways 30 Sep.pdfConsultee Comment · PDF30 Sept 2025View
HSE 22 Jul.pdfConsultee Comment · PDF22 Jul 2025View
ABH - Preliminary Ecological Appraisal.pdfEcology report · PDF10 Jun 2025View
ABH - Waste Management Strategy.pdfWaste Management · PDF10 Jun 2025View
Distances between buikdings 0476-SEW-ZZ-ZZ-DR-A-SK0001.pdfOther · PDF24 Sept 2025View
0476-SEW-ZZ-00-DR-A-PL1000_P2.pdfPlan · PDF8 Oct 2025View
0476-SEW-BB-08-DR-A-PL1124.pdfPlan · PDF13 Oct 2025View
ABH - Biodiversity Net Gain Assessment.pdfEcology report · PDF10 Jun 2025View
01382 ABH ES V2 Appendix 2.2 Scoping Opinion.pdfEnvironmental Statement · PDF10 Jun 2025View
ABH - Technical Aerodrome Safeguarding Assessment.pdfSupporting Information · PDF10 Jun 2025View
01382 ABH ES V2 Appendix 2.1 EIA Scoping Report 080425.pdfEnvironmental Statement · PDF10 Jun 2025View
01382 ABH ES V2 Appendix 7.2 Photomontages.pdfEnvironmental Statement · PDF10 Jun 2025View
Work & Skills 8 Sep.pdfConsultee Comment · PDF8 Sept 2025View
143164FO2025 - Albert Bridge House Bridge Street Manchester M3 5AH.pdfOfficer Report · PDF15 Oct 2025View
NATS 5 Sep.pdfConsultee Comment · PDF5 Sept 2025View
NATS 2 Jul.pdfConsultee Comment · PDF2 Jul 2025View
0476-SEW-AA-ZZ-DR-A-PL1302.pdfPlan · PDF10 Jun 2025View
ABH - Archaeological Assessment.pdfSupporting Information · PDF10 Jun 2025View
0476-SEW-CC-ZZ-DR-A-PL2323.pdfPlan · PDF19 Jun 2025View
ABH - Planning and Tall Building Statement.pdfSupporting Information · PDF10 Jun 2025View
ABH - Operational Management Plan.pdfSupporting Information · PDF10 Jun 2025View
01382 ABH ES V2 Appendix 8.6 Daylight, Sunlight and Overshadowing - 2022 Application vs Proposed Scheme.pdfEnvironmental Statement · PDF10 Jun 2025View
ABH - Flood Risk Assessment.pdfFlood Risk Assessment or Drainage · PDF10 Jun 2025View
0476-SEW-ZZ-ZZ-DR-A-PL1200.pdfSite Plan · PDF10 Jun 2025View
719339.pdfPublic Comment · PDF1 Aug 2025View
01382 ABH ES V2 Appendix 1.1 Statement of Technical Competence.pdfEnvironmental Statement · PDF10 Jun 2025View
ABH - Drainage Strategy Report.pdfFlood Risk Assessment or Drainage · PDF10 Jun 2025View
Distances between buikdings 0476-SEW-ZZ-ZZ-DR-A-SK0001.pdfOther · PDF24 Sept 2025View
0476-SEW-ZZ-ZZ-DR-A-SK0002.pdfPlan · PDF3 Oct 2025View
ABH - Fire Statement.pdfSupporting Information · PDF10 Jun 2025View
Highways 4 Aug.pdfConsultee Comment · PDF4 Aug 2025View
0476-SEW-CC-ZZ-DR-A-PL1354.pdfPlan · PDF10 Jun 2025View
0476-SEW-AA-ZZ-DR-A-PL2302.pdfPlan · PDF19 Jun 2025View
0476-SEW-CC-ZZ-DR-A-PL2322.pdfPlan · PDF19 Jun 2025View
0476-SEW-CC-ZZ-DR-A-PL2320.pdfPlan · PDF19 Jun 2025View
ABH - Air Quality Assessment.pdfSupporting Information · PDF10 Jun 2025View
0476-SEW-ZZ-ZZ-DR-L-PL0100.pdfPlan · PDF28 Aug 2025View
FRT 29 Jul.pdfConsultee Comment · PDF29 Jul 2025View
ABH - Ventilation Statement.pdfSupporting Information · PDF10 Jun 2025View
EA 22 Sep.pdfConsultee Comment · PDF22 Sept 2025View
ABH - Broadband Connectivity Assessment.pdfSupporting Information · PDF10 Jun 2025View
01382 ABH ES V2 Appendix 8.2 Drawings.pdfEnvironmental Statement · PDF10 Jun 2025View
01382 ABH ES V4 Non-Technical Summary 030625.pdfEnvironmental Statement · PDF10 Jun 2025View
HSE 25 Sep.pdfConsultee Comment · PDF25 Sept 2025View
01382 ABH ES V2 Appendix 12.1 Daylight, Sunlight and Overshadowing Cumulative and Future Baselines.pdfEnvironmental Statement · PDF10 Jun 2025View
0476-SEW-ZZ-ZZ-DR-A-PL0102.pdfPlan · PDF10 Jun 2025View
086313-CUR-XX-XX-T-TP-00003-P04_WMS.pdfWaste Management · PDF8 Oct 2025View
IMG_20250702_1247363597 Oct 2026View
ABH - Financial Viability Statement.pdfSupporting Information · PDF10 Jun 2025View
0476-SEW-ZZ-01-DR-A-PL1001_P2.pdfPlan · PDF8 Oct 2025View
ABH - Environmental Noise Survey.pdfNoise assessment or information · PDF10 Jun 2025View
ABH - Ground Investigation Phase 1 STU5827-R01_Rev_E.pdfGround Survey · PDF10 Jun 2025View
0476-SEW-CC-ZZ-DR-A-PL1353.pdfPlan · PDF10 Jun 2025View
713752.pdfPublic Comment · PDF21 Jul 2025View
01382 ABH ES V2 Appendix 1.2 Required information.pdfEnvironmental Statement · PDF10 Jun 2025View
261014 Albert Bridge House Second S106 COMPLETE_RedactedSupporting Information · PDF15 Oct 2026View
PF-JF-25-4866-RSA1.pdfOther · PDF29 Sept 2025View
01382 ABH ES V1 Compiled Figures.pdfEnvironmental Statement · PDF10 Jun 2025View
City Centre Regeneration 24 Jul.pdfConsultee Comment · PDF24 Jul 2025View
01382 ABH ES V2 Appendix 8.4 Sun Hours on Ground Assessments.pdfEnvironmental Statement · PDF10 Jun 2025View
0476-SEW-ZZ-B1-DR-A-PL0999.pdfPlan · PDF28 Aug 2025View
Airport Safeguarding 7 Jul.pdfConsultee Comment · PDF7 Jul 2025View
0476-SEW-ZZ-ZZ-DR-A-PL0200.pdfPlan · PDF10 Jun 2025View
Work & Skills 7 Jul.pdfConsultee Comment · PDF7 Jul 2025View
713767.pdfPublic Comment · PDF21 Jul 2025View
01382 ABH ES V1 Compiled.pdfEnvironmental Statement · PDF10 Jun 2025View
01382 ABH ES V2 Appendix 6.5 Façade Sound Insulation Performance New Homes Examples.pdfEnvironmental Statement · PDF10 Jun 2025View
ABH - Television and Radio Baseline Survey and Report.pdfSupporting Information · PDF10 Jun 2025View
0476-SEW-ZZ-ZZ-DR-A-PL0001.pdfSite Plan · PDF10 Jun 2025View
0476-SEW-CC-02-DR-A-PL1162.pdfPlan · PDF10 Jun 2025View
0476-SEW-BB-48-DR-A-PL1125.pdfPlan · PDF19 Jun 2025View
Highways 31 Jul.pdfConsultee Comment · PDF31 Jul 2025View
ABH - BNG Metric.xlsmEcology report10 Jun 2025View
Leasing_Strategy_ABH DEL .docxOther14 Oct 2025View
713786.pdfPublic Comment · PDF21 Jul 2025View
energy-and-carbon-proforma_v1-0.xlsxOther3 Oct 2025View
PF-JF-25-4866-RSA1.pdfOther · PDF27 Aug 2025View
086313-CUR-XX-XX-T-TP-00005-P02_RSA DTR.pdfOther · PDF28 Aug 2025View
0476-SEW-ZZ-ZZ-DR-A-PL1201.pdfSite Plan · PDF10 Jun 2025View
0476-SEW-ZZ-ZZ-DR-A-PL0011.pdfSite Plan · PDF10 Jun 2025View
0476-SEW-ZZ-ZZ-RP-A-PL00001 (3).pdfDesign & Access Statement · PDF10 Jun 2025View
01382 ABH ES V2 Appendix 8.5 Transient Overshadowing Results.pdfEnvironmental Statement · PDF10 Jun 2025View
Active Travel 31 Jul.pdfConsultee Comment · PDF31 Jul 2025View
0476-SEW-AA-ZZ-DR-A-PL2301.pdfPlan · PDF19 Jun 2025View
TfGMs Metrolink 7 Oct.pdfConsultee Comment · PDF7 Oct 2025View
707542.pdfPublic Comment · PDF7 Jul 2025View
ABH - Environmental Standard Statement.pdfSupporting Information · PDF10 Jun 2025View
0476-SEW-AA-02-DR-A-PL1102.pdfPlan · PDF13 Oct 2025View
696847.pdfApplication Form · PDF10 Jun 2025View
0476-SEW-ZZ-32-DR-A-PL1032.pdfPlan · PDF13 Oct 2025View
IMG_20250702_1248207647 Oct 2026View
Albert Bridge House - Manchseter_Final Document_Additional Views.pdfEnvironmental Statement · PDF4 Sept 2025View
01382 ABH ES V2 Appendix 9.1 Wind Microclimate Technical Report.pdfEnvironmental Statement · PDF10 Jun 2025View
0476-SEW-ZZ-ZZ-DR-A-PL1201.pdfPlan · PDF27 Aug 2025View
0476-SEW-ZZ-ZZ-DR-L-PL0100.pdfPlan · PDF10 Jun 2025View
0476-SEW-AA-ZZ-DR-A-PL2303.pdfPlan · PDF19 Jun 2025View
Flood Risk Assessment addendum - Review of latest EA mapping_20251006.pdfOther · PDF6 Oct 2025View
01382 ABH ES V2 Appendix 8.3 Daylight and Sunlight Results.pdfEnvironmental Statement · PDF10 Jun 2025View
0476-SEW-ZZ-ZZ-DR-A-PL0302.pdfPlan · PDF10 Jun 2025View
ABH - Energy Strategy.pdfSupporting Information · PDF10 Jun 2025View
01382 ABH ES V2 Appendix 6.2 Legislation and Guidance.pdfEnvironmental Statement · PDF10 Jun 2025View
IMG_20250702_1246318897 Oct 2026View
2719792_Redacted 21 Jul.pdfPublic Comment · PDF21 Jul 2025View
Highways 24 Sep.pdfConsultee Comment · PDF24 Sept 2025View
0476-SEW-ZZ-ZZ-DR-A-PL1200.pdfPlan · PDF27 Aug 2025View
0476-SEW-ZZ-ZZ-DR-A-PL0100.pdfPlan · PDF10 Jun 2025View
Distances between buikdings 0476-SEW-ZZ-ZZ-DR-A-SK0001.pdfOther · PDF25 Sept 2025View
743730.pdfPublic Comment · PDF5 Oct 2025View
086313-CUR-XX-XX-T-TP-00005-P02_RSA DTR.pdfOther · PDF29 Sept 2025View
0476-SEW-BB-ZZ-DR-A-PL1321.pdfPlan · PDF10 Jun 2025View
Salford MBC 24 Sep.pdfConsultee Comment · PDF24 Sept 2025View
ABH - Ground Investigation Phase 2 STX6912-R01-Rev_B.pdfGround Survey · PDF10 Jun 2025View
0476-SEW-BB-05-DR-A-PL1123.pdfPlan · PDF13 Oct 2025View
0476-SEW-ZZ-50-DR-A-PL1050.pdfPlan · PDF13 Oct 2025View
ABH - Cover Letter.pdfCorrespondence · PDF10 Jun 2025View
734341.pdfPublic Comment · PDF12 Sept 2025View
0476-SEW-ZZ-00-DR-A-PL1000.pdfPlan · PDF10 Jun 2025View
0476-SEW-BB-ZZ-DR-A-PL2312.pdfPlan · PDF19 Jun 2025View
ABH - Arboricultural Impact Assessment.pdfTree survey or information · PDF10 Jun 2025View
734694.pdfPublic Comment · PDF13 Sept 2025View
0476-SEW-ZZ-02-DR-A-PL1002.pdfPlan · PDF10 Jun 2025View
01382 ABH ES V2 Appendix 6.3 Noise and Vibration Survey.pdfEnvironmental Statement · PDF10 Jun 2025View
Highways 6 Aug.pdfConsultee Comment · PDF6 Aug 2025View
Highways 4 Sep.pdfConsultee Comment · PDF4 Sept 2025View
86313-CUR-XX-00-D-TP-75001-P06_AccessArrangement.pdfOther · PDF29 Sept 2025View
Active Travel 23 Sep.pdfConsultee Comment · PDF23 Sept 2025View
0476-SEW-ZZ-50-DR-A-PL1050_P2.pdfPlan · PDF8 Oct 2025View
GMAAS 2 Jul.pdfConsultee Comment · PDF2 Jul 2025View
MCC Active Travel 29 Jul.pdfConsultee Comment · PDF29 Jul 2025View
IMG_20250702_124648376_HDR7 Oct 2026View
01382 ABH ES V2 Appendix 8.1 Daylight, Sunlight and Overshadowing Assessment Methodology and Glossary.pdfEnvironmental Statement · PDF10 Jun 2025View
0476-SEW-ZZ-ZZ-SH-A-PL01001 (1).pdfSupporting Information · PDF10 Jun 2025View
0476-SEW-BB-02-DR-A-PL1122.pdfPlan · PDF13 Oct 2025View
ABH - Framework Travel Plan.pdfTransport or Travel information · PDF10 Jun 2025View
ABH - Crime Impact Statement.pdfSupporting Information · PDF10 Jun 2025View
0476-SEW-ZZ-01-DR-A-PL1001.pdfPlan · PDF10 Jun 2025View
20th Century Society 29 Jul.pdfConsultee Comment · PDF29 Jul 2025View
EHO 12 Sep.pdfConsultee Comment · PDF12 Sept 2025View
ABH - Local Labour Agreement.pdfSupporting Information · PDF10 Jun 2025View
ABH - Heritage Statement FINAL.pdfHeritage Statement · PDF10 Jun 2025View
0476-SEW-ZZ-ZZ-DR-A-PL0301.pdfPlan · PDF10 Jun 2025View
IMG_20250702_1246024957 Oct 2026View
UU 7 Jul.pdfConsultee Comment · PDF7 Jul 2025View
Neighbourhood Team Leader (Arboriculture)-.pdfConsultee Comment · PDF17 Oct 2025View
0476-SEW-ZZ-ZZ-DR-L-PL0100_P2.pdfPlan · PDF8 Oct 2025View
C&RT 5 Sep.pdfConsultee Comment · PDF5 Sept 2025View
ABH - Transport Statement.pdfTransport or Travel information · PDF10 Jun 2025View
0476-SEW-ZZ-ZZ-DR-A-PL0201.pdfPlan · PDF10 Jun 2025View
Sport England 9 Jul.pdfConsultee Comment · PDF9 Jul 2025View
717440.pdfPublic Comment · PDF29 Jul 2025View
0476-SEW-BB-ZZ-DR-A-PL1322.pdfPlan · PDF10 Jun 2025View
01382 ABH ES V2 Appendix 6.4 Construction Vibration.pdfEnvironmental Statement · PDF10 Jun 2025View
01382 ABH ES V3 Environmental Management Plan 020625.pdfEnvironmental Statement · PDF10 Jun 2025View
0476-SEW-AA-36-DR-A-PL1106.pdfPlan · PDF13 Oct 2025View
0476-SEW-BB-ZZ-DR-A-PL2310.pdfPlan · PDF19 Jun 2025View
0476-SEW-ZZ-ZZ-DR-A-PL0000.pdfLocation Plan · PDF10 Jun 2025View
GMAAS 10 Sep.pdfConsultee Comment · PDF10 Sept 2025View
080823-CUR-XX-00-D-TP-75002-P02_ProposedAccessArrangement.pdfOther · PDF29 Sept 2025View
0476-SEW-AA-04-DR-A-PL1103.pdfPlan · PDF13 Oct 2025View
24567-Albert Bridge House - Daylight Correction - 2-8 Left Bank Apartments.pdfOther · PDF15 Oct 2025View
NE 11 Jul.pdfConsultee Comment · PDF11 Jul 2025View
0476-SEW-ZZ-B1-DR-A-PL0999.pdfPlan · PDF10 Jun 2025View
718687.pdfPublic Comment · PDF31 Jul 2025View
0476-SEW-AA-08-DR-A-PL1104.pdfPlan · PDF13 Oct 2025View
GMEU 9 Aug.pdfConsultee Comment · PDF9 Aug 2025View
708169.pdfPublic Comment · PDF8 Jul 2025View
Sport England 5 Sep.pdfConsultee Comment · PDF5 Sept 2025View
EA 24 Jul.pdfConsultee Comment · PDF24 Jul 2025View
713772.pdfPublic Comment · PDF21 Jul 2025View
705566.pdfConsultee Comment · PDF1 Jul 2025View
01382 ABH ES V2 Appendix 7.1 Townscape and Visual Impact Assessment.pdfEnvironmental Statement · PDF10 Jun 2025View
0476-SEW-BB-ZZ-DR-A-PL2311.pdfPlan · PDF19 Jun 2025View
01382 ABH ES V2 Appendix 6.1 Consultation With Manchester City Council.pdfEnvironmental Statement · PDF10 Jun 2025View
C&RT 2 Jul.pdfConsultee Comment · PDF2 Jul 2025View
78622.xlsxOther3 Oct 2025View
0476-SEW-AA-12-DR-A-PL1105.pdfPlan · PDF13 Oct 2025View
0476-SEW-ZZ-ZZ-DR-A-PL0300.pdfPlan · PDF10 Jun 2025View
HE 14 Jul.pdfConsultee Comment · PDF14 Jul 2025View
0476-SEW-ZZ-ZZ-DR-L-PL0102.pdfPlan · PDF10 Jun 2025View
0476-SEW-CC-ZZ-DR-A-PL2321.pdfPlan · PDF19 Jun 2025View
0476-SEW-AA-ZZ-DR-A-PL1301.pdfPlan · PDF10 Jun 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Approve
Decision Notice - 143164_FO_2025
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.