Council planning record

Phased development comprising: Phase A - demolition of existing buildings and structures, erection of a basement (C1 Building and C2 Building) and a podium across lower ground and upper ground floors comprising flexible commercial space (Class E and/or Sui Generis drinking establishment), erection of a building (C1 Building) to form offices (Class E), landscaping works, highways, access, servicing, infrastructure and other associated works; Phase B - erection of a podium across lower ground and upper ground floors and a new building (C2 Building) to form offices (Class E) and flexible commercial and community uses (Class E, F2 and/or Sui Generis drinking establishment), alterations to the existing Sculptural Wall (Hollaway Wall), relocation of existing art work, landscaping works, highways, access, servicing, infrastructure and other associated works; Phase C - change of use and associated works to railway Viaduct arches to form flexible commercial units (Class E and/or Sui Generis drinking establishment) including highways, access and servicing arrangements, and other associated works.

Sister Plot C Former UMIST Campus Altrincham Street Manchester M1 7JA

FinalReference: 143024/FO/2025Manchester City Council

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Valid date

    Published milestoneCouncil source
  2. Date of committee

    Published milestoneCouncil source
  3. Decision notice sent date

    Published milestoneCouncil source
  4. Target decision date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Final
Application type
Full planning permission
Received
Not published
Validated
23 May 2025
Determination deadline
16 Mar 2026
Local authority
Manchester City Council

Application overview

Phased development comprising: Phase A - demolition of existing buildings and structures, erection of a basement (C1 Building and C2 Building) and a podium across lower ground and upper ground floors comprising flexible commercial space (Class E and/or Sui Generis drinking establishment), erection of a building (C1 Building) to form offices (Class E), landscaping works, highways, access, servicing, infrastructure and other associated works; Phase B - erection of a podium across lower ground and upper ground floors and a new building (C2 Building) to form offices (Class E) and flexible commercial and community uses (Class E, F2 and/or Sui Generis drinking establishment), alterations to the existing Sculptural Wall (Hollaway Wall), relocation of existing art work, landscaping works, highways, access, servicing, infrastructure and other associated works; Phase C - change of use and associated works to railway Viaduct arches to form flexible commercial units (Class E and/or Sui Generis drinking establishment) including highways, access and servicing arrangements, and other associated works.

Proposal details

Reference
143024/FO/2025
Alternative references
PP-13937828
Ward
Piccadilly
Agent
John Cooper

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Sister Plot C Former UMIST Campus Altrincham Street Manchester M1 7JA

This record has no verified map location.

Documents 192 of 192

DocumentPublishedAction
Hollaway Wall - Fabric Alteration (LBC) SISC0-AAM-ZZ-ZZ-DR-AR-07611_P01.pdfPlan · PDF23 May 2025View
Broadband Connectivity Survey- Plot C.pdfSupporting Information · PDF23 May 2025View
Placemaking Strategy - Plot C.pdfSupporting Information · PDF23 May 2025View
Statement of Consultation - Plot C.pdfSupporting Information · PDF23 May 2025View
Green and Blue Infrastructure Statement - Plot C.pdfSupporting Information · PDF23 May 2025View
Flood Risk Assessment - Plot C.pdfFlood Risk Assessment or Drainage · PDF18 Sept 2025View
Framework Travel Plan - Plot C.pdfTransport or Travel information · PDF23 May 2025View
C20 20 Jun_Redacted.pdfConsultee Comment · PDF20 Jun 2025View
695152.pdfPublic Comment · PDF6 Jun 2025View
ES Vol 2 Appendix 7.3 - Townscape baseline and assessment.pdfEnvironmental Statement · PDF23 May 2025View
Proposed Level 6 GA Plan SISC0-AAM-ZZ-06-DR-AR-07106_P01.pdfPlan · PDF23 May 2025View
highways 4 Jul_Redacted.pdfConsultee Comment · PDF4 Jul 2025View
ES Vol 2 Appendix 5.1 Hoarding Layout.pdfEnvironmental Statement · PDF23 May 2025View
ES Vol 2 Appendix 7.4 AVR Methodology.pdfEnvironmental Statement · PDF23 May 2025View
Proposed Section D SISC0-AAM-ZZ-ZZ-DR-AR-07303_P01.pdfPlan · PDF18 Sept 2025View
ES Vol 2 Appendix 14.3 - Operational Stage Impacts.pdfEnvironmental Statement · PDF23 May 2025View
ES Vol 2 Appendix 15.1- Drawings (Scenario 1)- 21766-REL02-IS01-DS-03-EXI_3D.pdfEnvironmental Statement · PDF23 May 2025View
Proposed Elevation Altrincham Street Viaduct North and South Elevation SISC0-AAM-ZZ-ZZ-DR-AR-07206_P01.pdfPlan · PDF18 Sept 2025View
800297.pdfOfficer Report · PDF6 Mar 2026View
HE 143024 19 Jun_Redacted.pdfConsultee Comment · PDF19 Jun 2025View
Sister Plot C - Flooding Sequential Test .pdfFlood Risk Assessment or Drainage · PDF18 Sept 2025View
ES Vol 2 Appendix 8.2 Construction Dust Risk Assessment.pdfEnvironmental Statement · PDF23 May 2025View
Proposed Level 18 GA Plan SISC0-AAM-ZZ-18-DR-AR-07118_P01.pdfPlan · PDF23 May 2025View
690316.pdfApplication Form · PDF23 May 2025View
ES Vol 2 Appendix 15.3- Overshadowing Results (Scenario 2)- June-SHOG June Proposed.pdfEnvironmental Statement · PDF23 May 2025View
ES Vol 2 Appendix 9.4 Legislation, Policy and Guidance.pdfEnvironmental Statement · PDF23 May 2025View
Outline Operational Management Strategy - Plot C.pdfSupporting Information · PDF23 May 2025View
aerodrome 6 Jun.pdfConsultee Comment · PDF6 Jun 2025View
Altrincham Street Viaduct - Existing (LBC) SISC0-AAM-ZZ-ZZ-DR-AR-07600_P01.pdfPlan · PDF23 May 2025View
ES Vol 2 Appendix 15.2 - Daylight & Sunlight Results (Scenario 1 v 5)-21766_2_2_DS.pdfEnvironmental Statement · PDF23 May 2025View
SISC0-AAM-ZZ-ZZ-DR-AR-07004_P01_Annotated.pdfSite Plan · PDF8 Jul 2025View
Proposed Composite Ground Floor SISC0-AAM-ZZ-ZZ-DR-AR-07004_P01.pdfPlan · PDF23 May 2025View
Waste Proforma - Plot C.pdfWaste Management · PDF23 May 2025View
ES Vol 2 Appendix 15.3- Overshadowing Results (Scenario 5)- June-Phase 2 SHOG June Proposed.pdfEnvironmental Statement · PDF23 May 2025View
Landscaping Proposed Levels SISC0-SLA-LA-ZZ-DR-LA-00002.pdfPlan · PDF18 Sept 2025View
Proposed Roof GA Plan SISC0-AAM-ZZ-R2-DR-AR-07121_P01.pdfPlan · PDF23 May 2025View
Sister Plot C - TVIA Design and Landscaping Update - Technical Note.pdfSupporting Information · PDF18 Sept 2025View
695824.pdfPublic Comment · PDF9 Jun 2025View
GMAAS 27 Jun_Redacted.pdfConsultee Comment · PDF27 Jun 2025View
Proposed Section B SISC0-AAM-ZZ-ZZ-DR-AR-07301_P01.pdfPlan · PDF18 Sept 2025View
695670.pdfPublic Comment · PDF8 Jun 2025View
ES Vol 2 Appendix 17.2 - Site Investigation Report. April 202551019-CE-02-XX-R-G-1002 P04.pdfEnvironmental Statement · PDF23 May 2025View
ES Vol 2 Appendix 15.1- Drawings (Scenario 5)-21766-REL02-IS02-DS-06-PROP_3D.pdfEnvironmental Statement · PDF23 May 2025View
Sister Plot C - PTBS Statement Addendum.pdfSupporting Information · PDF18 Sept 2025View
ES Vol 2 Appendix 2.1- EIA Scoping Report.pdfEnvironmental Statement · PDF23 May 2025View
Arboricultural Impact Assessment - Plot C.pdfSupporting Information · PDF23 May 2025View
ES Vol 2 Appendix 14.7 - Fear and Intimidation Construction Stage Calculations.pdfEnvironmental Statement · PDF23 May 2025View
Proposed Typical Lower Level GA (03-05) SISC0-AAM-ZZ-ZZ-DR-AR-07103_P01.pdfPlan · PDF23 May 2025View
ES Vol 2 Appendix 16.2– Preliminary Noise Management Plan_Redacted.pdfEnvironmental Statement · PDF23 May 2025View
ES Vol 2 Appendix 12.3 - Health determinants and their relevance to the Proposed Development.pdfEnvironmental Statement · PDF23 May 2025View
Aviation Safeguarding Technical Note - Plot C.pdfSupporting Information · PDF23 May 2025View
Site Plan SISC0-AAM-ZZ-R2-DR-AR-07003_P01.pdfSite Plan · PDF23 May 2025View
Context Elevation - Mill Lane (S) SISC0-AAM-ZZ-ZZ-DR-AR-07022_P01.pdfPlan · PDF18 Sept 2025View
Sister Plot C - DAS Addendum - SISC0-AAM-XX-XX-RP-AR-00003_P01.pdfDesign & Access Statement · PDF18 Sept 2025View
Proposed Section C SISC0-AAM-ZZ-ZZ-DR-AR-07302_P01.pdfPlan · PDF18 Sept 2025View
ES Vol 2 Appendix 15.3- Overshadowing Results (Scenario 5)- March-PHASE 2 SHOG March Proposed.pdfEnvironmental Statement · PDF23 May 2025View
EHO 26 Jun_Redacted.pdfConsultee Comment · PDF26 Jun 2025View
695134.pdfPublic Comment · PDF5 Jun 2025View
Site Phasing Plans and Sections SISC0-AAM-ZZ-ZZ-DR-AR-07005_P01.pdfSite Plan · PDF23 May 2025View
Statutory Biodiversity Metric - Plot C.xlsmEcology report18 Sept 2025View
Proposed Section A SISC0-AAM-ZZ-ZZ-DR-AR-07300_P01.pdfPlan · PDF18 Sept 2025View
Proposed Approach - Manchester Room (LBC) SISC0-AAM-ZZ-ZZ-DR-AR-07614_P01.pdfPlan · PDF23 May 2025View
Proposed Level 11 GA Plan SISC0-AAM-ZZ-11-DR-AR-07111_P01.pdfPlan · PDF23 May 2025View
Context Elevation - Altrincham Street (N) SISC0-AAM-ZZ-ZZ-DR-AR-07020_P01.pdfPlan · PDF18 Sept 2025View
Hollaway Wall Structural Appraisal and Outline Methodology Report - Plot C.pdfSupporting Information · PDF23 May 2025View
Works and skills 2 Jun_Redacted.pdfConsultee Comment · PDF2 Jun 2025View
EHO 07.08.25_Redacted.pdfConsultee Comment · PDF7 Aug 2025View
ES Vol 2 Appendix 15.1- Drawings (Scenario 5)- 21766-REL02-IS02-DS-05-PROP_3D.pdfEnvironmental Statement · PDF23 May 2025View
Proposed Typical Mid Level GA (07-09) SISC0-AAM-ZZ-ZZ-DR-AR-07107_P01.pdfPlan · PDF23 May 2025View
ES Vol 2 Appendix 2.4 - EIA Scoping Opinion Summary of Comments, Responses and Updates.pdfEnvironmental Statement · PDF23 May 2025View
ES Vol 2 Appendix 7.1 - Tables.pdfEnvironmental Statement · PDF23 May 2025View
ES Vol 2 Appendix 12.4 - Assessment of Health Determinants_clean.pdfEnvironmental Statement · PDF23 May 2025View
Transport Assessment - Plot C.pdfTransport or Travel information · PDF23 May 2025View
ES Vol 2 Appendix 9.3 Scope 3 Emissions Considerations.pdfEnvironmental Statement · PDF23 May 2025View
Proposed Approach - Mill Lane (LBC) SISC0-AAM-ZZ-ZZ-DR-AR-07615_P01.pdfPlan · PDF23 May 2025View
ES Vol 2 Appendix 12.1 - Guidance and Regulation.pdfEnvironmental Statement · PDF23 May 2025View
ES Vol 2 Appendix 2.3 - Committed Devs Map.pdfEnvironmental Statement · PDF23 May 2025View
719349.pdfPublic Comment · PDF3 Aug 2025View
695112.pdfPublic Comment · PDF5 Jun 2025View
Sister Plot C - Ecology Landscaping Updates Technical Note.pdfEcology report · PDF18 Sept 2025View
EA 18 Jul_Redacted.pdfConsultee Comment · PDF18 Jul 2025View
Operational Waste Management and Servicing Strategy - Plot C.pdfWaste Management · PDF23 May 2025View
ES Vol 2 Appendix 14.5 - IDM Masterplan Assessment with Cumulative Trips.pdfEnvironmental Statement · PDF23 May 2025View
Circular Economy Statement - Plot C.pdfSupporting Information · PDF23 May 2025View
SISC0-BHE-ZZ-ZZ-RP-SU-00010_Redacted.pdfSupporting Information · PDF4 Aug 2025View
Network Rail 10 Jul_Redacted.pdfConsultee Comment · PDF10 Jul 2025View
Desk-Based Satellite Television Interference Assessment.pdfSupporting Information · PDF23 May 2025View
Proposed Level 10 GA Plan SISC0-AAM-ZZ-10-DR-AR-07110_P01.pdfPlan · PDF23 May 2025View
Proposed Upper GF GA Plan SISC0-AAM-ZZ-UG-DR-AR-07100_P01.pdfPlan · PDF23 May 2025View
701560.pdfPublic Comment · PDF21 Jun 2025View
eho 22.07.25_Redacted.pdfConsultee Comment · PDF22 Jul 2025View
Local Labour Agreement - Plot C.pdfSupporting Information · PDF23 May 2025View
ES Vol 2 Appendix 9.2 Greenhouse Gas Calculation Inputs.pdfEnvironmental Statement · PDF23 May 2025View
ES Vol 2 Appendix 15.2 - Daylight & Sunlight Results (Scenario 1 v 2)-21766_2_1_DS.pdfEnvironmental Statement · PDF23 May 2025View
701496.pdfPublic Comment · PDF20 Jun 2025View
Crime Impact Statement - Plot C.pdfSupporting Information · PDF23 May 2025View
800243.pdfDecision · PDF6 Mar 2026View
Sister Plot C - Hollaway Wall Heritage Response (C20 & HE) .pdfHeritage Statement · PDF18 Sept 2025View
Sister Plot C - Public Art Appendix 3 M&G Exploratory Study Report (Updated).pdfSupporting Information · PDF18 Sept 2025View
Proposed Approach - Hollaway Place (LBC) SISC0-AAM-ZZ-ZZ-DR-AR-07613_P01.pdfPlan · PDF23 May 2025View
highways 10.09.2025_Redacted.pdfConsultee Comment · PDF10 Sept 2025View
695746.pdfPublic Comment · PDF9 Jun 2025View
758564.pdfConsultee Comment · PDF6 Nov 2025View
ES Vol 2 Appendix 15.2 - Daylight & Sunlight Results (Scenario 1 v 2)- 21766_2__1_NSL Contours.pdfEnvironmental Statement · PDF23 May 2025View
ES Vol 2 Appendix 15.1- Drawings (Scenario 1) -21766-REL02-IS01-DS-01-EXI_PLN.pdfEnvironmental Statement · PDF23 May 2025View
Archaeological Assessment - Plot C.pdfSupporting Information · PDF23 May 2025View
Detailed UXO Risk Assessment - Plot C.pdfSupporting Information · PDF23 May 2025View
Energy and Carbon Proforma - Plot C.xlsxSupporting Information23 May 2025View
ES Vol 2 Appendix 12.2 - Assessing the Outcomes for Health and Wellbeing.pdfEnvironmental Statement · PDF23 May 2025View
Proposed Level 1 GA Plan - SISC0-AAM-ZZ-01-DR-AR-07101_P01.pdfPlan · PDF23 May 2025View
ES Vol 2 Appendix 9.1 Climate Change Resilience Risk Assessment.pdfEnvironmental Statement · PDF23 May 2025View
Event Strategy - Plot C.pdfSupporting Information · PDF23 May 2025View
Demolition GA Plan SISC0-AAM-ZZ-ZZ-DR-AR-07001_P01.pdfPlan · PDF23 May 2025View
Proposed Section E SISC0-AAM-ZZ-ZZ-DR-AR-07304_P01.pdfPlan · PDF18 Sept 2025View
ES Vol 2 Appendix 14.8 - Transport Assessment.pdfEnvironmental Statement · PDF23 May 2025View
Context Elevation - The Square (W) SISC0-AAM-ZZ-ZZ-DR-AR-07023_P01.pdfPlan · PDF18 Sept 2025View
695150.pdfPublic Comment · PDF5 Jun 2025View
ES Vol 2 Appendix 15.1- Drawings (Scenario 2)- 21766-REL02-IS01-DS-06-PROP_3D.pdfEnvironmental Statement · PDF23 May 2025View
800199.pdfSection 106 Agreement · PDF6 Mar 2026View
ES Vol 2 Appendix 14.2 - Construction Stage Impacts.pdfEnvironmental Statement · PDF23 May 2025View
flood 24 Jun.pdfConsultee Comment · PDF24 Jun 2025View
Sister Plot C - Additional Information Covering Letter.pdfCorrespondence · PDF18 Sept 2025View
693336.pdfPublic Comment · PDF1 Jun 2025View
Proposed Lower GF GA Plan SISC0-AAM-ZZ-LG-DR-AR-07099_P01.pdfPlan · PDF23 May 2025View
Existing Levels SISC0-AAM-ZZ-ZZ-DR-AR-07002_P01.pdfPlan · PDF23 May 2025View
Covering Letter- Plot C.pdfCorrespondence · PDF23 May 2025View
ES Vol 2 Appendix 11.1 - Solar Glare Methodology.pdfEnvironmental Statement · PDF23 May 2025View
700418.pdfPublic Comment · PDF18 Jun 2025View
ES Vol 2 Appendix 10.2 Wind Microclimate CFD Results.pdfEnvironmental Statement · PDF23 May 2025View
ES Vol 2 Appendix 17.1 Civic Earth 2025 Sister - Plot C and Enanling Works Area. Phase 1 Desk Study and Data Review.pdfEnvironmental Statement · PDF23 May 2025View
758523.pdfPublic Comment · PDF14 Nov 2025View
Proposed Level 2 GA Plan SISC0-AAM-ZZ-02-DR-AR-07102_P01.pdfPlan · PDF23 May 2025View
Sister Plot C_SLHA_Renold Listing_Group Value Note_Update.pdfHeritage Statement · PDF18 Sept 2025View
ES Vol 2 Appendix 15.2 - Daylight & Sunlight Results (Scenario 1 v 5)-21766_2__2_NSL Contours.pdfEnvironmental Statement · PDF23 May 2025View
Proposed Basement GA Plan SISC0-AAM-ZZ-B1-DR-AR-07098_P01.pdfPlan · PDF23 May 2025View
Landscaping Sections AABB SISC0-SLA-LA-XX-DR-LA-00001.pdfPlan · PDF18 Sept 2025View
ES Vol 2 Appendix 14.6 - Scoping in-out of Cumulative Sites.pdfEnvironmental Statement · PDF23 May 2025View
ES Vol 2 Appendix 15.1- Drawings (Scenario 1)- 21766-REL02-IS01-DS-02-EXI_3D.pdfEnvironmental Statement · PDF23 May 2025View
GMEU 27 Jun_Redacted.pdfConsultee Comment · PDF27 Jun 2025View
ES Vol 2 Appendix 15.1- Drawings (Scenario 2)- 21766-REL02-IS01-DS-05-PROP_3D.pdfEnvironmental Statement · PDF23 May 2025View
ATE 16 Jul.pdfConsultee Comment · PDF16 Jul 2025View
Sister Plot C - Solar Glare - Technical Note.pdfDaylight & Sunlight assessment · PDF18 Sept 2025View
Landscaping Sections CCDDEE SISC0-SLA-LA-XX-DR-LA-00002.pdfPlan · PDF18 Sept 2025View
Hollaway Wall - Existing Condition (LBC) SISC0-AAM-ZZ-ZZ-DR-AR-07610_P01.pdfPlan · PDF23 May 2025View
ES Vol 2 Appendix 11.2 - Solar Glare Assessment.pdfEnvironmental Statement · PDF23 May 2025View
696937.pdfPublic Comment · PDF10 Jun 2025View
Sister Plot C EIA Addendum (ES Volume 1) Final.pdfEnvironmental Statement · PDF18 Sept 2025View
Public Art Strategy - Plot C.pdfSupporting Information · PDF18 Sept 2025View
Altrincham Street Viaduct Proposed (LBC) - SISC0-AAM-ZZ-ZZ-DR-AR-07602_P01.pdfPlan · PDF18 Sept 2025View
Proposed Level 19 GA Plan SISC0-AAM-ZZ-19-DR-AR-07119_P01.pdfPlan · PDF23 May 2025View
Certificate C Notice Confirmation - Public Notice Portal (MEN).pdfSupporting Information · PDF23 May 2025View
ES Vol 2 Appendix 15.1- Drawings (Scenario 5)- 21766-REL02-IS02-DS-04-PROP_PLN.pdfEnvironmental Statement · PDF23 May 2025View
Accommodation Schedule - SISC0-AAM-ZZ-ZZ-SH-AR-07901_P01.pdfSupporting Information · PDF23 May 2025View
ES Vol 2 Appendix 8.3 Air Quality Assessment Appendices.pdfEnvironmental Statement · PDF23 May 2025View
Proposed Typical Upper Level GA (12-17) SISC0-AAM-ZZ-ZZ-DR-AR-07112_P01.pdfPlan · PDF23 May 2025View
Topographic Survey - Plot C.pdfSupporting Information · PDF23 May 2025View
Ventilation Statement - Plot C.pdfSupporting Information · PDF23 May 2025View
ES Vol 2 Appendix 15.3- Overshadowing Results (Scenario 1)- March-PHASE 2 SHOG March Existing.pdfEnvironmental Statement · PDF23 May 2025View
695674.pdfPublic Comment · PDF8 Jun 2025View
ES Vol 2 Appendix 15.3- Overshadowing Results (Scenario 2)- March-PHASE 1 SHOG March Proposed.pdfEnvironmental Statement · PDF23 May 2025View
697403.pdfPublic Comment · PDF11 Jun 2025View
ES Volume 1- Plot C.pdfEnvironmental Statement · PDF23 May 2025View
ES Vol 2 Appendix 6.1 Heritage Statement.pdfEnvironmental Statement · PDF18 Sept 2025View
ES Vol 2 Appendix 14.1 - Construction Traffic Information.pdfEnvironmental Statement · PDF23 May 2025View
EHO 9 Sep_Redacted.pdfConsultee Comment · PDF9 Sept 2025View
ES Vol 2 Appendix 16.1– Baseline Noise and Vibration Survey.pdfEnvironmental Statement · PDF23 May 2025View
Terrestrial Televsion Baseline Survey Report - Plot C.pdfSupporting Information · PDF23 May 2025View
Sister Plot C - Wind Design and Landscaping Update - Technical Note.pdfSupporting Information · PDF18 Sept 2025View
Design and Access Statement - Plot C.pdfDesign & Access Statement · PDF28 May 2025View
Altrincham Street Viaduct - Fabric Alterations (LBC) SISC0-AAM-ZZ-ZZ-DR-AR-07601_P01.pdfPlan · PDF23 May 2025View
Ecological Impact Assessment - Plot C.pdfEcology report · PDF18 Sept 2025View
SISC0-SLA-LA-ZZ-DR-LA-00001 (1).pdfPlan · PDF18 Sept 2025View
ES Vol 2 Appendix 15.1- Drawings (Scenario 2)- 21766-REL02-IS01-DS-04-PROP_PLN.pdfEnvironmental Statement · PDF23 May 2025View
ES Vol 2 Appendix 7.2- Visual baseline and assessment.pdfEnvironmental Statement · PDF23 May 2025View
Environmental Standards Statement and Energy and Carbon Statement - Plot C.pdfSupporting Information · PDF23 May 2025View
Proposed Level 20 GA Plan SISC0-AAM-ZZ-20-DR-AR-07120_P01.pdfPlan · PDF23 May 2025View
EH 26 Jun_Redacted.pdfConsultee Comment · PDF26 Jun 2025View
695885.pdfPublic Comment · PDF9 Jun 2025View
ES Vol 2 Appendix 2.2-EIA Scoping Opinion.pdfEnvironmental Statement · PDF23 May 2025View
Context Elevation - London Rd (E) SISC0-AAM-ZZ-ZZ-DR-AR-07021_P01.pdfPlan · PDF18 Sept 2025View
Drainage Strategy - Plot C.pdfFlood Risk Assessment or Drainage · PDF23 May 2025View
ES Vol 2 Appendix 8.1 Legislation, Policy and Guidance.pdfEnvironmental Statement · PDF23 May 2025View
701470.pdfPublic Comment · PDF20 Jun 2025View
695073.pdfPublic Comment · PDF5 Jun 2025View
Site Location Plan Existing SISC0-AAM-ZZ-ZZ-DR-AR-07000_P01.pdfLocation Plan · PDF23 May 2025View
ES Vol 2 Appendix 10.1 Detailed Wind Microclimate Methodology.pdfEnvironmental Statement · PDF23 May 2025View
Hollaway Wall - Proposed Condition (LBC) SISC0-AAM-ZZ-ZZ-DR-AR-07612_P01.pdfPlan · PDF23 May 2025View
P2335-PTM-1-JLS P02 - Gym Planning Addendum.pdfNoise assessment or information · PDF3 Sept 2025View
Sister Plot C Drainage Landscaping Update - Technical Note.pdfFlood Risk Assessment or Drainage · PDF18 Sept 2025View
ES Vol 2 Appendix 14.4 - Cumulative Assessment.pdfEnvironmental Statement · PDF23 May 2025View
Planning and Tall Building Statement - Plot C.pdfSupporting Information · PDF23 May 2025View
ES Vol 2 Appendix 15.3- Overshadowing Results (Scenario 1)- June- Phase 2 SHOG June Existing.pdfEnvironmental Statement · PDF23 May 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Approve
800243.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.