Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Mindel House (10 Minshull Street) And 11 Bloom Street Manchester M1 3EF
Last published check: 1 Oct 2026, 22:21. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceVariation of application 119374/FO/2018, as varied by 133975/JO/2022, to amend conditions 2 (Specified Plans), 10 (Construction Management Plan), 11 (Heritage), and 13 (Environmental Standards).
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsMindel House (10 Minshull Street) And 11 Bloom Street Manchester M1 3EF
This record has no verified map location.
| Document | Published | Action |
|---|---|---|
| 24006-HFR-MH-ZZ-DR-A-9083_P01_Cleaning works - Internal elevations_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-00-DR-E-61001-CONTAINMENT LAYOUT LEVEL 0.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-XX-SH-M-57004-Attenuator Schedule.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-04-DR-E-68001-FIRE ALARM LAYOUT LEVEL 4.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-UG-DR-A-9020_P01_Upper Ground Floor_Demolition Plan (Completed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-B1-DR-M-560-01-HEATING LAYOUT LEVEL B1.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-03-DR-A-9023_P01_Third Floor_Demolition Plan (Completed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9111_P01_North East Elevation - Existing_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-02-DR-E-68001-FIRE ALARM LAYOUT LEVEL 2.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-02-DR-A-9032_P01_Second Floor_Demolition Plan (Proposed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-03-DR-A-9043_P01_Third Floor_Retention Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-XX-DR-A-9182_P01_Window detail - 1st Floor_Bloom St._Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-05-DR-M-59301-SMOKE EXTRACT LAYOUT LEVEL 05.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-B1-DR-E-62001-SMALL POWER, DATA & SECURITY LAYOUT LEVEL B1.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9161_P01_Main Staircase - Plans_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-XX-SH-M-57005-Louvre Schedule.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9110_P01_North West Elevation - Existing_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-02-DR-A-9022_P01_Second Floor_Demolition Plan (Completed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-02-DR-A-9032_P01_Second Floor_Demolition Plan (Proposed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-XX-SH-A-9172_P01_Existing Window Schedule_Planning.pdfSupporting Information · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-01-DR-A-9141__First Floor - Floor Types and finishes.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9112_P01_South-East Elevation - Existing_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-04-DR-M-57001-VENTILATION LAYOUT LEVEL 04.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-RP-DR-A-9046_P01_Roof_Retention Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-04-DR-M-59301-SMOKE EXTRACT LAYOUT LEVEL 04.pdfPlan · PDF | 2 Dec 2024 | View |
| MVHR Ventilation Statement v3.pdfSupporting Information · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9116_P01_Long Section - Existing_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-UG-DR-A-9130_P01_Upper Ground Floor - Reflected Ceiling Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-XX-SH-A-9173_P01_Secondary Window Schedule_Planning.pdfSupporting Information · PDF | 8 Jul 2024 | View |
| 240513 - 024322-R03-A Tender acoustic design report.pdfNoise assessment or information · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-UG-DR-A-9130_P01_Upper Ground Floor - Reflected Ceiling Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9114_P01_Alleyway Elevation - Existing_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-02-DR-M-560-01-HEATING LAYOUT LEVEL 02.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9084_P01_Cleaning works - ceilings_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-04-DR-M-590-01-DRY RISER LAYOUT LEVEL 04.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-03-DR-E-62001-SMALL POWER, DATA & SECURITY LAYOUT LEVEL 3.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-02-DR-A-9052_P01_Second Floor_Heritage Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-01-DR-E-63001-LIGHTING LAYOUT LEVEL 1.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9123_P01_Bloom Street External Wall_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-05-DR-Z-5-601-MEP HIGH LEVEL REFLECTED CEILING PLAN LEVEL 5.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-LG-DR-A-9146_P01_Lower Ground Floor - Foor types and finishes.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-XX-SH-A-9172_P01_Existing Window Schedule_Planning.pdfSupporting Information · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-01-DR-A-9051_P01_First Floor_Heritage Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 563969.pdfApplication Form · PDF | 26 Jun 2024 | View |
| 24006-HAK-BS-XX-SH-M-57003-MVHR Schedule.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-02-DR-A-9132_P01_Second Floor - Reflected Ceiling Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-XX-DR-A-9190_P01_External Doors Elevations_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-04-DR-A-9034_P01_Fourth Floor_Demolition Plan (Proposed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-XX-DR-A-9091_P01_Lightwell Elevations_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 631278.pdfDecision · PDF | 3 Dec 2024 | View |
| 24006-HAK-BS-04-DR-M-570-01-VENTILATION LAYOUT LEVEL 04.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9162_P01_Main Staircase Plans - Sheet 2_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-01-DR-A-9051_P01_First Floor_ Heritage Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-XX-DR-A-9178_P01_Window detail - LGF Bloom St._Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9080_P01_Proposed Remedial Works Elevation_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9163_P01_Main Staircase Sections_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-XX-SH-M-57002-Supply Grille Schedule.pdfPlan · PDF | 2 Dec 2024 | View |
| 240321 - 024322-R01-A Environmental noise survey report.pdfNoise assessment or information · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-LG-DR-A-9156_P01_Lower Ground Floor_Internal Partitions ID Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-00-DR-M-520-01-DRAINAGE LAYOUT LEVEL 00.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-MH-02-DR-A-9102_P01_Second Floor - Existing plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-LG-DR-A-9035_P01_Lower Ground Floor_Demolition Plan (Proposed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-03-DR-M-59301-SMOKE EXTRACT LAYOUT LEVEL 03.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-03-DR-M-590-01-DRY RISER LAYOUT LEVEL 03.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-XX-SH-A-9191_P01_External Door Schedule_Planning.pdfSupporting Information · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-LG-DR-A-9135_P01_Lower Ground Floor - Reflected Ceiling Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-RP-DR-A-9036_P01_Roof_Demolition Plan (Proposed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9123_P01_Former Entrance External Wall_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9164_P01_Rear Staircase Plans_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-B1-DR-M-520-01-DRAINAGE LAYOUT LEVEL B1.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-MH-XX-DR-A-9175_P01_Window Detail - LGF Window Tanking_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-XX-DR-A-9170_P01_Existing Windows Elevations_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9011_P01_North-East Elevation_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-03-DR-M-57001-VENTILATION LAYOUT LEVEL 03.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9125_P01_Penthouse Extension_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-B1-DR-M-59301-SMOKE EXTRACT LAYOUT LEVEL B1.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-RP-DR-A-9026_P01_Roof_Demolition Plan_Completed_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-XX-SH-M-57001-Extract Grille Schedule.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-XX-DR-A-9185_P01_Window detail - 4th Floor Typical_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-03-DR-Z-5-601-MEP HIGH LEVEL REFLECTED CEILING PLAN LEVEL 3.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-MH-RP-DR-A-9026_P01_Roof _Demolition Plan_Completed_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-00-DR-M-560-01-HEATING LAYOUT LEVEL 00.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-04-DR-A-9054_P01_Fourh Floor_Heritage Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-04-DR-A-9154_P01_Fourth Floor_Internal Partitions ID Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-02-DR-A-9022_P01_Second Floor_Demolition Plan (Completed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-00-DR-E-62001-SMALL POWER, DATA & SECURITY LAYOUT LEVEL 0.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-B1-DR-E-61001-CONTAINMENT LAYOUT LEVEL B1.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-RP-DR-A-9007_P01_Roof Plan_GAs_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9113_P01_South West Elevation - Existing_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-B1-DR-Z-5-601-MEP HIGH LEVEL REFLECTED CEILING PLAN LEVEL B1.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-LG-DR-A-9056_P01_Lower Ground Floor_Heritage Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-UG-DR-A-9030_P01_Upper Ground Floor_Demolition Plan (Proposed)_Planning.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-03-DR-M-520-01-DRAINAGE LAYOUT LEVEL 03.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9121_P01_Minshull St. External Wall..pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-05-DR-M-520-01-DRAINAGE LAYOUT LEVEL 05.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9124_P01_Bloom St. External Wall_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-LG-DR-A-9005_P01_Lower Ground Floor_GAs_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9090_P01_Lightwell Floor Plans_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-XX-DR-A-9171_P01_Secondary and New Windows Elevations_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-00-DR-E-63001-LIGHTING LAYOUT LEVEL 0.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-01-DR-E-61001-CONTAINMENT LAYOUT LEVEL 1.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-XX-DR-A-9181_P01_Window detail - 1st Floor_Richmond St._Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-02-DR-A-9132_P01_Second Floor - Reflected Ceiling Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-XX-SH-A-9174_P01_Proposed New Window Schedule_Planning.pdfSupporting Information · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-05-DR-A-9135_P01_Fifth Floor - Reflected Ceiling Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9122_P01_Rear Exit External Wall_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| Drawing list.pdfOther · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-04-DR-A-9024_P01_Fourth Floor_Demolition Plan (Completed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-04-DR-M-520-01-DRAINAGE LAYOUT LEVEL 04.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-01-DR-M-560-01-HEATING LAYOUT LEVEL 01.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-00-DR-M-59301-SMOKE EXTRACT LAYOUT LEVEL 00.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9082_P01_Cleaning Work_Plans_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-XX-DR-A-9070_P01_Roof extension - Design intent_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-XX-DR-A-9196_P01_Bloom Street - Street Views B_Planning.pdfPhoto · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-XX-DR-A-9166_P01_Core Arrangement _Plan 12_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-04-DR-A-9104_P01_Fourth Floor - Existing plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-LG-DR-A-9045_P01_Lower Ground Floor_Retention Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-XX-SH-A-9173_P01_Secondary Window Schedule_Planning.pdfSupporting Information · PDF | 8 Jul 2024 | View |
| Mindel House and 11 Bloom Street Report.pdfOfficer Report · PDF | 3 Dec 2024 | View |
| 24006-HAK-BS-B1-DR-M-530-01-DOMESTIC WATER LAYOUT LEVEL B1.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-MH-02-DR-A-9142_P01_Second Floor - Floor types and finishes.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-03-DR-E-63001-LIGHTING LAYOUT LEVEL 3.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-04-DR-A-9144__Fourth Floor - Foor types and finishes.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9011_P01_North-East Elevation_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-XX-DR-A-9157_P01_Internal Wall Partitions Types_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-01-DR-M-530-01-DOMESTIC WATER LAYOUT LEVEL 01.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9121_P01_Alleyway External Wall_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-XX-DR-A-9167_P01_Core Arrangement_Plan 22_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-04-DR-A-9004_P01_Fourth Floor_GAs_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-XX-DR-A-9071_P01_Roof Details _12_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-03-DR-A-9023_P01_Third Floor_Demolition Plan (Completed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-04-DR-A-9104_P01_Fourth Floor - Existing Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-02-DR-A-9002_P01_Second Floor_GAs_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-01-DR-M-590-01-DRY RISER LAYOUT LEVEL 01.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-UG-DR-A-9140_P01_Upper Ground Floor - Floor types and finishes.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-05-DR-E-63001-LIGHTING LAYOUT LEVEL 5.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-MH-04-DR-M-57001-VENTILATION LAYOUT LEVEL 04.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-01-DR-Z-5-601-MEP HIGH LEVEL REFLECTED CEILING PLAN LEVEL 1.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-02-DR-E-62001-SMALL POWER, DATA & SECURITY LAYOUT LEVEL 2.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9010_P01_North-West Elevation_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-XX-DR-A-9190_P01_External Doors Elevations_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-04-DR-A-9134_P01_Fourth Floor - Reflected Ceiling Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9081_P01_Remedial Works_Internal Elevations_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-UG-DR-A-9150_P01_Upper Ground Floor_Internal Partitions ID Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-XX-DR-A-9186_P01_Basement Grille_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-01-DR-M-560-01-HEATING LAYOUT LEVEL 01.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-03-DR-A-9033_P01_Third Floor_Demolition Plan (Proposed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9120_P01_Main Entrance External Wall_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-03-DR-A-9133_P01_Third Floor - Reflected Ceiling Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-UG-DR-A-9100_P01_Upper Ground Floor - Existing plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9111_P01_North-East Elevation - Existing_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-01-DR-M-57002-VENTILATION ISOMETRIC LAYOUTS LEVEL 01.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-01-DR-A-9021_P01_First Floor_Demolition Plan (Completed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-04-DR-A-9034_P01_Fourth Floor_Demolition Plan (Proposed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-01-DR-E-68001-FIRE ALARM LAYOUT LEVEL 1.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-04-DR-M-530-01-DOMESTIC WATER LAYOUT LEVEL 04.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-UG-DR-A-9040_P01_Upper Ground Floor_Retention Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-05-DR-A-9005_P01_Fifth Floor_GAs_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-02-DR-A-9042_P01_Second Floor_Retention Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-00-DR-Z-5-601-MEP HIGH LEVEL REFLECTED CEILING PLAN LEVEL 0.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9083_P01_Cleaning Works_internal Elevations_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-03-DR-E-61001-CONTAINMENT LAYOUT LEVEL 3.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-XX-DR-A-9171_P01_Secondary and New Windows Elevations_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9165_P01_Rear Staircase Sections_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-UG-DR-A-9100_P01_Upper Ground Floor - Existing Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-UG-DR-A-9040_P01_Upper Ground Floor_Retention Plans_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-XX-DR-A-9177_P01_Window Detail - UGF Typical Timber Panel Window_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-LG-DR-A-9045_P01_Lower Ground Floor_Retention Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-01-DR-A-9131_P01_First Floor - Reflected Ceiling Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-MH-01-DR-M-57001-VENTILATION LAYOUT LEVEL 01.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-02-DR-A-9002_P01_Second Floor_GAs_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-02-DR-A-9052_P01_Second Floor_ Heritge Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-UG-DR-A-9160_P01_Main Entrance Stair_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-LG-DR-A-9055_P01_Lower Ground Floor_Heritage Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-B1-DR-M-570-01-VENTILATION LAYOUT LEVEL B1.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-02-DR-E-61001-CONTAINMENT LAYOUT LEVEL 2.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-ZZ-ZZ-DR-M-57001-VENTILATION TYPICAL SECTIONS.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9161_P01_Main Staircase Plans - Sheet 1_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 20 - 1659 Piccadilly Warehouse PRA Report.pdfEcology report · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-01-DR-A-9101_P01_First Floor - Existing Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-XX-DR-A-9071_P01_Roof Extension details_12_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9113_P01_South-West Elevation - Existing_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 1381-TCM-BS-B1-DR-C-0801 - Drainage Layout - Sheet 2_P1.pdfFlood Risk Assessment or Drainage · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-03-DR-A-9133_P01_Third Floor - Reflected Ceiling Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-05-DR-M-570-01-VENTILATION LAYOUT LEVEL 05.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-B1-DR-M-590-01-DRY RISER LAYOUT LEVEL B1.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9115_P01_Cross Section - Existing_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-00-DR-M-530-01-DOMESTIC WATER LAYOUT LEVEL 00.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9012_P01_South-East Elevation_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9164_P01_Rear Stair Enclosure - Plans Sheet 2_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9015_P01_Section A-A_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-PW-XX-DR-A-9060_P01_Alleyway Design Intent - Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-LG-DR-A-9105_P01_Lower Ground Floor - Existing Plan Copy 1.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-01-DR-A-9131_P01_First Floor - Reflected Ceiling Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-XX-DR-A-9072_P01_Roof Details_22_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-01-DR-M-520-01-DRAINAGE LAYOUT LEVEL 01.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-PW-XX-DR-A-9062_P01_Alleyway Design - Bloom Street - Elevation and section_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-03-DR-A-9003_P01_Third Floor_GAs_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-01-DR-M-57001-VENTILATION LAYOUT LEVEL 01.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-01-DR-A-9031_P01_First Floor_Demolition Plan (Proposed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-XX-XX-RP-A-0004 - Section 73-19 Planning statement _21.06.24_1of4.pdfDesign & Access Statement · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-LG-DR-A-9035_P01_Lower Ground Floor_Demolition Plan (Proposed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-04-DR-A-9134_P01_Fourth Floor - Reflected Ceiling Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-PW-XX-DR-A-9156_P01_Floor Details.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9116_P01_Long Section - Existing_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-B1-DR-E-68001-FIRE ALARM LAYOUT LEVEL B1.pdfPlan · PDF | 2 Dec 2024 | View |
| S73 and S19 Application Covering Letter (24.06.2024) combined.pdfCorrespondence · PDF | 26 Jun 2024 | View |
| TECHNICAL NOTE 002 - Drainage Statement.pdfFlood Risk Assessment or Drainage · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-01-DR-E-62001-SMALL POWER, DATA & SECURITY LAYOUT LEVEL 1.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-05-DR-M-590-01-DRY RISER LAYOUT LEVEL 05.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-XX-XX-RP-A-0004 - Section 73-19 Planning statement _21.06.24_3of4.pdfDesign & Access Statement · PDF | 8 Jul 2024 | View |
| 24006-HAK-MH-00-DR-M-57001-VENTILATION LAYOUT LEVEL 00.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-01-DR-M-59301-SMOKE EXTRACT LAYOUT LEVEL 01.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9112_P01_South East Elevation - Existing_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-UG-DR-A-9000_P01_Upper Ground Floor_GAs_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-05-DR-E-61001-CONTAINMENT LAYOUT LEVEL 5.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9014_P01_Alleyway elevations_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9016_P01_Section B-B_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-04-DR-M-560-01-HEATING LAYOUT LEVEL 04.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-04-DR-E-61001-CONTAINMENT LAYOUT LEVEL 4.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-XX-DR-A-9184_P01_Window detail - 3rd Floor Typical_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| Heritage Assessment Addendum (S73 and S19 application) 20.06.2024.pdfHeritage Statement · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-04-DR-A-9154_P01_Fourth Floor_Internal Partitions ID Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-B1-DR-E-63001-LIGHTING LAYOUT LEVEL B1.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-PW-XX-DR-A-9061_P01_Alleyway Design Intent - Lower ground Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-02-DR-Z-5-601-MEP HIGH LEVEL REFLECTED CEILING PLAN LEVEL 2.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-02-DR-A-9152_P01_Second Floor_Internal Partitions ID Plan Copy 1.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-01-DR-A-9151_P01_First Floor_Internal Partitions ID Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-XX-DR-A-9180_P01_Window detail - UGF Bloom St._Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-02-DR-E-63001-LIGHTING LAYOUT LEVEL 2.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-01-DR-A-9021_P01_First Floor_Demolition Plan (Completed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-XX-DR-A-9170_P01_Existing Window Elevations_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-UG-DR-A-9050_P01_Upper Ground Floor_Heritage Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-UG-DR-A-9050_P01_Upper Ground Floor_Heritage Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9080_P01_Remedial Works_External Elevation_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-04-DR-A-9044_P01_Fourth Floor_Retention Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-03-DR-M-560-01-HEATING LAYOUT LEVEL 03.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9081_P01_Remedial works - Intenal elevations_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-05-DR-M-57001-VENTILATION LAYOUT LEVEL 05.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-PW-XX-DR-A-9060_P01_Alleyway Design Intent - Mindel House Elevation and section_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-03-DR-A-9143_P01_Third Floor - Foor types and finishes.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-UG-DR-A-9140_P01_Upper Ground Floor - Floor types and finishes.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-00-DR-M-570-01-VENTILATION LAYOUT LEVEL 00.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-01-DR-M-570-01-VENTILATION LAYOUT LEVEL 01.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-MH-03-DR-A-9053_P01_Third Floor_Heritage Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-UG-DR-A-9160_P01_Main Entrance Stair and Ramp_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-02-DR-M-570-01-VENTILATION LAYOUT LEVEL 02.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-LG-DR-A-9006_P01_Lower Ground Floor_GAs_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9082_P01_Cleaning works - Plans_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-XX-DR-A-9167_P01_Core Arrangment_Plan 22_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-MH-B1-DR-M-57001-VENTILATION LAYOUT LEVEL B1.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-01-DR-A-9101_P01_First Floor - Existing plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-LG-DR-A-9155_P01_Lower Ground Floor_Internal Partitions ID Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-XX-DR-A-9182_P01_Window Detail - 4th Floor Typical Exposed Window_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-XX-DR-A-9168_P01_Core Arrangement_Sections_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 1381-TCM-BS-B1-DR-C-0800 - Drainage Layout - Sheet 1_P1.pdfFlood Risk Assessment or Drainage · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-XX-SH-A-9191_P01_External Door Schedule_Planning.pdfSupporting Information · PDF | 8 Jul 2024 | View |
| 24006-HFR-PW-XX-DR-A-9159_P01_Tanking Details.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-04-DR-A-9044_P01_Fourth Floor_Retention Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-03-DR-M-570-01-VENTILATION LAYOUT LEVEL 03.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-MH-01-DR-A-9001_P01_First Floor_GAs_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9015_P01_Section B-B_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-05-DR-M-530-01-DOMESTIC WATER LAYOUT LEVEL 05.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-XX-SH-A-9174_P01_Proposed New Window Schedule_Planning.pdfSupporting Information · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-01-DR-A-9001_P01_First Floor_GAs_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9013_P01_South-West Elevation_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9014_P01_Section A-A_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-02-DR-A-9102_P01_Second Floor - Existing Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-02-DR-M-57001-VENTILATION LAYOUT LEVEL 02.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-XX-XX-RP-A-0004 - Section 73-19 Planning statement _21.06.24_2of4.pdfDesign & Access Statement · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-02-DR-M-59301-SMOKE EXTRACT LAYOUT LEVEL 02.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9110_P01_North-West Elevation - Existing_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-05-DR-M-560-01-HEATING LAYOUT LEVEL 05.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9165_P01_Rear Stair Enclosure - Sections_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-LG-DR-A-9025_P01_Lower Ground Floor_Demolition Plan (Completed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-03-DR-A-9143_P01_Third floor - Floor types and finishes.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9120_P01_Main Entrance External Wall_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-XX-DR-A-9183_P01_Window detail - 2nd Floor Typical_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-XX-DR-A-9180_P01_Window Detail - 2nd 3rd Floor Typical Timber Panel Window_Planning 1.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9162_P01_Main Staircase - Sections_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9013_P01_South-West Elevation_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-05-DR-A-9175_P01_Fifth Floor Curtain Walling_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-UG-DR-A-9000_P01_Upper Ground Floor_GAs_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-03-DR-A-9103_P01_Third Floor - Existing plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9122_P01_Richmond St. External Wall_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-01-DR-A-9151_P01_First Floor_Internal Partitions ID Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-01-DR-A-9141_P01_First Floor - Floor types and finishes.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-LG-DR-A-9136_P01_Lower Ground Floor - Reflected Ceiling Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-04-DR-E-62001-SMALL POWER, DATA & SECURITY LAYOUT LEVEL 4.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-01-DR-A-9041_P01_First Floor_Retention Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-LG-DR-A-9105_P01_Lower Ground floor - Existing plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-ZZ-DR-M-590-01-DRY RISER SECTIONS & 3D.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-05-DR-E-68001-FIRE ALARM LAYOUT LEVEL 5.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-03-DR-A-9153_P01_Third Floor_Internal Partitions ID Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-PW-XX-DR-A-9158_P01_Bloom Street and Mindel House Shadow Gap Details.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-03-DR-A-9053_P01_Third Floor_Heritage Plans_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9178_P01_Window Detail - 1st Floor Typical Timber Panel Window 1_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-PW-XX-DR-A-9064_P01_Ironwork Gates_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-B2-DR-M-530-01-DOMESTIC WATER LAYOUT LEVEL B2.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-00-DR-E-68001-FIRE ALARM LAYOUT LEVEL 0.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-MH-02-DR-A-9042_P01_Second Floor_Retention Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-RP-DR-A-9006_P01_Roof Plan_GAs_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-XX-DR-A-9195_P01_Bloom Street - Street Views A_Planning.pdfPhoto · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-05-DR-A-9155_P01_Fifth Floor_Internal Partitions ID_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-03-DR-A-9103_P01_Third Floor - Existing Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-04-DR-A-9004_P01_Fourth Floor_GAs_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-02-DR-M-590-01-DRY RISER LAYOUT LEVEL 02.pdfPlan · PDF | 2 Dec 2024 | View |
| CRIME_IMPACT_STATEMENT-880951.pdfSupporting Information · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-03-DR-A-9033_P01_Third Floor_Demolition Plan (Proposed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-PW-XX-DR-A-9063_P01_Alleyway Design - Bloom Street Cross Section_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-LG-DR-A-9145_P01_Lower Ground Floor - Floor types and finishes.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-01-DR-A-9041_P01_First Floor_Retention Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| PW - Construction Method Statement REV D 10.06.24 - Appendices Included-compressed.pdfSupporting Information · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-RP-DR-A-9036_P01_Roof _Demolition Plan (Proposed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-03-DR-M-530-01-DOMESTIC WATER LAYOUT LEVEL 03.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9115_P01_Cross Section - Existing_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-B1-DR-M-57001-VENTILATION LAYOUT LEVEL B1.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-XX-DR-A-9168_P01_Core Arrangement_Sections_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HRF-BS-XX-DR-A-9176_P01_Bin Store Curtain Walling_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-XX-DR-A-9072_P01_Roof extension details_22_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-LG-DR-A-9025_P01_Lower Ground Floor_Demolition Plan_Completed_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-02-DR-A-9142_P01_Second Floor - Foor types and finishes.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-XX-DR-A-9179_P01_Window detail - UGF Richmond St..pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9010_P01_North-West Elevations_Planning.pdfPlan · PDF | 11 Jul 2024 | View |
| 24006-HFR-MH-03-DR-A-9043_P01_Third Floor_Retention Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-04-DR-E-63001-LIGHTING LAYOUT LEVEL 4.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-00-DR-M-590-01-DRY RISER LAYOUT LEVEL 00.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-UG-DR-A-9150_P01_Upper Ground Floor_Internal Partitions ID Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9012_P01_South-East Elevation_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-MH-03-DR-M-57001-VENTILATION LAYOUT LEVEL 03.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-XX-DR-A-9176_P01_Window Detail - UGF Typical New Lime Plaster Window_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-05-DR-E-62001-SMALL POWER, DATA & SECURITY LAYOUT LEVEL 5.pdfPlan · PDF | 2 Dec 2024 | View |
| Planning Statement Addendum 20.06.2024.pdfSupporting Information · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-02-DR-A-9152_P01_Second Floor_Internal Partitions ID Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-XX-DR-A-9179_P01_Window Detail - 1st Floor Typical Timber Panel Window 2_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-XX-XX-RP-A-0004 - Section 73-19 Planning statement _21.06.24_4of4.pdfDesign & Access Statement · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-04-DR-A-9144_P01_Fourth floor - Floor types and finishes.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-XX-DR-A-9181_P01_Window Detail - 2nd 3rd Floor Typical Timber Panel Window 2_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-UG-DR-A-9020_P01_Upper Ground Floor_Demolition Plan (Completed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-02-DR-M-530-01-DOMESTIC WATER LAYOUT LEVEL 02.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-XX-DR-A-9177_P01_Window detail - LGF Richmond St._Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-XX-DR-A-9070_P01_Roof sections_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9163_P01_Rear Stair Enclosure - Plans Sheet 1_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-04-DR-Z-5-601-MEP HIGH LEVEL REFLECTED CEILING PLAN LEVEL 4.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-01-DR-M-570-02-VENTILATION ISOMETRIC LAYOUTS LEVEL 01.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-03-DR-E-68001-FIRE ALARM LAYOUT LEVEL 3.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-MH-04-DR-A-9054_P01_Fourth Floor_Heritage Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-MH-02-DR-M-57001-VENTILATION LAYOUT LEVEL 02.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006_Waste Strategy_2024.06.21.pdfWaste Management · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-UG-DR-A-9030_P01_Upper Ground Floor_Demolition Plan (Proposed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9084_P01_Cleaning Works_Ceilings_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-03-DR-A-9153_P01_Third Floor_Internal Partitions ID Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-03-DR-A-9003_P01_Third Floor_GAs_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-XX-DR-A-9136_P01_Ceiling Type Details_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-XX-DR-A-9166_P01_Core Arrangement_Plan 12_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-04-DR-A-9024_P01_Fourth Floor_Demolition Plan (Completed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-02-DR-M-520-01-DRAINAGE LAYOUT LEVEL 02.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-00-DR-M-57001-VENTILATION LAYOUT LEVEL 00.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-05-DR-A-9145_P01_Fifth Floor - Foor types and finishes.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-01-DR-A-9031_P01_First Floor_Demolition Plan (Proposed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
No related records were published in this section.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.