Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
11 Bloom Street Manchester M1 3EF
Last published check: 1 Oct 2026, 22:11. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceVariation of Listed Building Consent 119375/LO/2018, as amended by 133906/JO/2022, to amend conditions 2 (Specified Plans), 4 (Heritage) and 5 (Scaffolding).
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details11 Bloom Street Manchester M1 3EF
This record has no verified map location.
| Document | Published | Action |
|---|---|---|
| 24006-HAK-BS-00-DR-M-520-01-DRAINAGE LAYOUT LEVEL 00.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-03-DR-A-9033_P01_Third Floor_Demolition Plan (Proposed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-00-DR-E-68001-FIRE ALARM LAYOUT LEVEL 0.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-05-DR-E-63001-LIGHTING LAYOUT LEVEL 5.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9163_P01_Rear Stair Enclosure - Plans Sheet 1_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-UG-DR-A-9160_P01_Main Entrance Stair and Ramp_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-XX-SH-M-57005-Louvre Schedule.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-02-DR-A-9042_P01_Second Floor_Retention Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-03-DR-Z-5-601-MEP HIGH LEVEL REFLECTED CEILING PLAN LEVEL 3.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-B1-DR-E-61001-CONTAINMENT LAYOUT LEVEL B1.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-05-DR-M-570-01-VENTILATION LAYOUT LEVEL 05.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-02-DR-A-9032_P01_Second Floor_Demolition Plan (Proposed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9012_P01_South-East Elevation_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 631277.pdfDecision · PDF | 3 Dec 2024 | View |
| 24006-HFR-BS-03-DR-A-9053_P01_Third Floor_Heritage Plans_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 1381-TCM-BS-B1-DR-C-0800 - Drainage Layout - Sheet 1_P1.pdfFlood Risk Assessment or Drainage · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-05-DR-A-9135_P01_Fifth Floor - Reflected Ceiling Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-XX-DR-A-9168_P01_Core Arrangement_Sections_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-02-DR-A-9002_P01_Second Floor_GAs_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-XX-SH-M-57004-Attenuator Schedule.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-MH-02-DR-A-9032_P01_Second Floor_Demolition Plan (Proposed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-03-DR-A-9143_P01_Third floor - Floor types and finishes.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-XX-SH-A-9172_P01_Existing Window Schedule_Planning.pdfSupporting Information · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-LG-DR-A-9155_P01_Lower Ground Floor_Internal Partitions ID Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-PW-XX-DR-A-9064_P01_Ironwork Gates_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-02-DR-A-9132_P01_Second Floor - Reflected Ceiling Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-02-DR-A-9102_P01_Second Floor - Existing plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-01-DR-A-9021_P01_First Floor_Demolition Plan (Completed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-01-DR-A-9101_P01_First Floor - Existing Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-01-DR-M-520-01-DRAINAGE LAYOUT LEVEL 01.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-00-DR-E-62001-SMALL POWER, DATA & SECURITY LAYOUT LEVEL 0.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-03-DR-M-59301-SMOKE EXTRACT LAYOUT LEVEL 03.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-XX-DR-A-9157_P01_Internal Wall Partitions Types_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-02-DR-Z-5-601-MEP HIGH LEVEL REFLECTED CEILING PLAN LEVEL 2.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-MH-XX-SH-A-9174_P01_Proposed New Window Schedule_Planning.pdfSupporting Information · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-01-DR-A-9001_P01_First Floor_GAs_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-01-DR-M-560-01-HEATING LAYOUT LEVEL 01.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-XX-DR-A-9178_P01_Window detail - LGF Bloom St._Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-01-DR-A-9131_P01_First Floor - Reflected Ceiling Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-UG-DR-A-9020_P01_Upper Ground Floor_Demolition Plan (Completed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-05-DR-E-61001-CONTAINMENT LAYOUT LEVEL 5.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-00-DR-M-570-01-VENTILATION LAYOUT LEVEL 00.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-MH-02-DR-A-9152_P01_Second Floor_Internal Partitions ID Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-RP-DR-A-9026_P01_Roof _Demolition Plan_Completed_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-XX-SH-A-9173_P01_Secondary Window Schedule_Planning.pdfSupporting Information · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-XX-DR-A-9180_P01_Window detail - UGF Bloom St._Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-02-DR-A-9042_P01_Second Floor_Retention Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-04-DR-M-560-01-HEATING LAYOUT LEVEL 04.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-XX-DR-A-9091_P01_Lightwell Elevations_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-01-DR-A-9151_P01_First Floor_Internal Partitions ID Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-03-DR-E-68001-FIRE ALARM LAYOUT LEVEL 3.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9120_P01_Main Entrance External Wall_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-B1-DR-E-68001-FIRE ALARM LAYOUT LEVEL B1.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-PW-XX-DR-A-9060_P01_Alleyway Design Intent - Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-B1-DR-M-590-01-DRY RISER LAYOUT LEVEL B1.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-04-DR-A-9024_P01_Fourth Floor_Demolition Plan (Completed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-02-DR-A-9142_P01_Second Floor - Foor types and finishes.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-02-DR-M-59301-SMOKE EXTRACT LAYOUT LEVEL 02.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-03-DR-E-62001-SMALL POWER, DATA & SECURITY LAYOUT LEVEL 3.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9012_P01_South-East Elevation_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9115_P01_Cross Section - Existing_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-01-DR-M-57002-VENTILATION ISOMETRIC LAYOUTS LEVEL 01.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-02-DR-A-9052_P01_Second Floor_ Heritge Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-LG-DR-A-9056_P01_Lower Ground Floor_Heritage Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 1381-TCM-BS-B1-DR-C-0801 - Drainage Layout - Sheet 2_P1.pdfFlood Risk Assessment or Drainage · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-02-DR-A-9142_P01_Second Floor - Floor types and finishes.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-02-DR-M-520-01-DRAINAGE LAYOUT LEVEL 02.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-MH-LG-DR-A-9005_P01_Lower Ground Floor_GAs_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-04-DR-A-9154_P01_Fourth Floor_Internal Partitions ID Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-XX-DR-A-9181_P01_Window detail - 1st Floor_Richmond St._Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-LG-DR-A-9035_P01_Lower Ground Floor_Demolition Plan (Proposed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-LG-DR-A-9025_P01_Lower Ground Floor_Demolition Plan (Completed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-04-DR-Z-5-601-MEP HIGH LEVEL REFLECTED CEILING PLAN LEVEL 4.pdfPlan · PDF | 2 Dec 2024 | View |
| 11 Bloom Street LBC Report.pdfOfficer Report · PDF | 3 Dec 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9113_P01_South-West Elevation - Existing_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-01-DR-A-9101_P01_First Floor - Existing plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-04-DR-A-9034_P01_Fourth Floor_Demolition Plan (Proposed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-02-DR-M-57001-VENTILATION LAYOUT LEVEL 02.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-04-DR-E-62001-SMALL POWER, DATA & SECURITY LAYOUT LEVEL 4.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-MH-XX-DR-A-9180_P01_Window Detail - 2nd 3rd Floor Typical Timber Panel Window_Planning 1.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9081_P01_Remedial Works_Internal Elevations_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-04-DR-M-57001-VENTILATION LAYOUT LEVEL 04.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-02-DR-A-9022_P01_Second Floor_Demolition Plan (Completed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9014_P01_Section A-A_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-XX-DR-A-9190_P01_External Doors Elevations_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-01-DR-A-9051_P01_First Floor_ Heritage Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-02-DR-M-590-01-DRY RISER LAYOUT LEVEL 02.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-02-DR-M-570-01-VENTILATION LAYOUT LEVEL 02.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-03-DR-E-63001-LIGHTING LAYOUT LEVEL 3.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9123_P01_Former Entrance External Wall_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-03-DR-A-9103_P01_Third Floor - Existing Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-03-DR-A-9153_P01_Third Floor_Internal Partitions ID Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-05-DR-M-59301-SMOKE EXTRACT LAYOUT LEVEL 05.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-XX-DR-A-9183_P01_Window detail - 2nd Floor Typical_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-01-DR-A-9131_P01_First Floor - Reflected Ceiling Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9111_P01_North East Elevation - Existing_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-RP-DR-A-9036_P01_Roof_Demolition Plan (Proposed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-UG-DR-A-9040_P01_Upper Ground Floor_Retention Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-B2-DR-M-530-01-DOMESTIC WATER LAYOUT LEVEL B2.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-00-DR-M-57001-VENTILATION LAYOUT LEVEL 00.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-02-DR-M-530-01-DOMESTIC WATER LAYOUT LEVEL 02.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-LG-DR-A-9156_P01_Lower Ground Floor_Internal Partitions ID Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-XX-DR-A-9176_P01_Window Detail - UGF Typical New Lime Plaster Window_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-XX-DR-A-9182_P01_Window detail - 1st Floor_Bloom St._Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-ZZ-DR-M-590-01-DRY RISER SECTIONS & 3D.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9090_P01_Lightwell Floor Plans_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-04-DR-A-9044_P01_Fourth Floor_Retention Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-XX-DR-A-9184_P01_Window detail - 3rd Floor Typical_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-B1-DR-Z-5-601-MEP HIGH LEVEL REFLECTED CEILING PLAN LEVEL B1.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-MH-XX-SH-A-9191_P01_External Door Schedule_Planning.pdfSupporting Information · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-XX-DR-A-9070_P01_Roof extension - Design intent_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-05-DR-A-9175_P01_Fifth Floor Curtain Walling_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-LG-DR-A-9145_P01_Lower Ground Floor - Floor types and finishes.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-LG-DR-A-9136_P01_Lower Ground Floor - Reflected Ceiling Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9122_P01_Richmond St. External Wall_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-XX-XX-RP-A-0004 - Section 73-19 Planning statement _21.06.24_4of4.pdfDesign & Access Statement · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-UG-DR-A-9130_P01_Upper Ground Floor - Reflected Ceiling Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-03-DR-M-57001-VENTILATION LAYOUT LEVEL 03.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-01-DR-A-9031_P01_First Floor_Demolition Plan (Proposed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-02-DR-A-9002_P01_Second Floor_GAs_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-MH-03-DR-M-57001-VENTILATION LAYOUT LEVEL 03.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9123_P01_Bloom Street External Wall_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-XX-DR-A-9170_P01_Existing Window Elevations_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9011_P01_North-East Elevation_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9111_P01_North-East Elevation - Existing_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-03-DR-M-530-01-DOMESTIC WATER LAYOUT LEVEL 03.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-MH-LG-DR-A-9045_P01_Lower Ground Floor_Retention Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-04-DR-A-9054_P01_Fourth Floor_Heritage Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-00-DR-Z-5-601-MEP HIGH LEVEL REFLECTED CEILING PLAN LEVEL 0.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-MH-UG-DR-A-9030_P01_Upper Ground Floor_Demolition Plan (Proposed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9161_P01_Main Staircase Plans - Sheet 1_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-05-DR-Z-5-601-MEP HIGH LEVEL REFLECTED CEILING PLAN LEVEL 5.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-05-DR-E-68001-FIRE ALARM LAYOUT LEVEL 5.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-04-DR-M-560-01-HEATING LAYOUT LEVEL 04.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-MH-01-DR-A-9021_P01_First Floor_Demolition Plan (Completed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-XX-DR-A-9181_P01_Window Detail - 2nd 3rd Floor Typical Timber Panel Window 2_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-XX-DR-A-9166_P01_Core Arrangement_Plan 12_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9084_P01_Cleaning works - ceilings_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-04-DR-E-61001-CONTAINMENT LAYOUT LEVEL 4.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-PW-XX-DR-A-9061_P01_Alleyway Design Intent - Lower ground Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-UG-DR-A-9140_P01_Upper Ground Floor - Floor types and finishes.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-XX-DR-A-9072_P01_Roof Details_22_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-04-DR-M-570-01-VENTILATION LAYOUT LEVEL 04.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-00-DR-E-63001-LIGHTING LAYOUT LEVEL 0.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-MH-04-DR-M-57001-VENTILATION LAYOUT LEVEL 04.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-LG-DR-A-9055_P01_Lower Ground Floor_Heritage Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-PW-XX-DR-A-9060_P01_Alleyway Design Intent - Mindel House Elevation and section_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-LG-DR-A-9025_P01_Lower Ground Floor_Demolition Plan_Completed_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-00-DR-M-59301-SMOKE EXTRACT LAYOUT LEVEL 00.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-XX-SH-A-9191_P01_External Door Schedule_Planning.pdfSupporting Information · PDF | 8 Jul 2024 | View |
| 24006-HFR-PW-XX-DR-A-9063_P01_Alleyway Design - Bloom Street Cross Section_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-04-DR-A-9004_P01_Fourth Floor_GAs_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-XX-SH-M-57003-MVHR Schedule.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-MH-01-DR-A-9041_P01_First Floor_Retention Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-02-DR-E-61001-CONTAINMENT LAYOUT LEVEL 2.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-01-DR-E-62001-SMALL POWER, DATA & SECURITY LAYOUT LEVEL 1.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-02-DR-A-9052_P01_Second Floor_Heritage Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-XX-XX-RP-A-0004 - Section 73-19 Planning statement _21.06.24_1of4.pdfDesign & Access Statement · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-05-DR-M-560-01-HEATING LAYOUT LEVEL 05.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-MH-XX-SH-A-9173_P01_Secondary Window Schedule_Planning.pdfSupporting Information · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-XX-DR-A-9071_P01_Roof Details _12_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-04-DR-A-9024_P01_Fourth Floor_Demolition Plan (Completed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9110_P01_North-West Elevation - Existing_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 240321 - 024322-R01-A Environmental noise survey report.pdfNoise assessment or information · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-05-DR-M-530-01-DOMESTIC WATER LAYOUT LEVEL 05.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-MH-04-DR-A-9104_P01_Fourth Floor - Existing plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-01-DR-A-9031_P01_First Floor_Demolition Plan (Proposed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9124_P01_Bloom St. External Wall_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-02-DR-E-62001-SMALL POWER, DATA & SECURITY LAYOUT LEVEL 2.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-03-DR-A-9143_P01_Third Floor - Foor types and finishes.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-UG-DR-A-9160_P01_Main Entrance Stair_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-03-DR-M-560-01-HEATING LAYOUT LEVEL 03.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-MH-LG-DR-A-9105_P01_Lower Ground floor - Existing plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 561425.pdfApplication Form · PDF | 25 Jun 2024 | View |
| 24006-HFR-MH-01-DR-A-9141_P01_First Floor - Floor types and finishes.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-LG-DR-A-9035_P01_Lower Ground Floor_Demolition Plan (Proposed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-MH-B1-DR-M-57001-VENTILATION LAYOUT LEVEL B1.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-RP-DR-A-9036_P01_Roof _Demolition Plan (Proposed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| Piccadilly Warehouse - SCHEDULE OF WORKS Rev 03.pdfSupporting Information · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-XX-DR-A-9182_P01_Window Detail - 4th Floor Typical Exposed Window_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-XX-XX-RP-A-0004 - Section 73-19 Planning statement _21.06.24_2of4.pdfDesign & Access Statement · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-XX-DR-A-9170_P01_Existing Windows Elevations_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-B1-DR-M-530-01-DOMESTIC WATER LAYOUT LEVEL B1.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-01-DR-M-570-01-VENTILATION LAYOUT LEVEL 01.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-02-DR-M-560-01-HEATING LAYOUT LEVEL 02.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9015_P01_Section B-B_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9161_P01_Main Staircase - Plans_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-RP-DR-A-9026_P01_Roof_Demolition Plan_Completed_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9164_P01_Rear Staircase Plans_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-04-DR-A-9104_P01_Fourth Floor - Existing Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9112_P01_South-East Elevation - Existing_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-UG-DR-A-9030_P01_Upper Ground Floor_Demolition Plan (Proposed)_Planning.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-MH-04-DR-A-9134_P01_Fourth Floor - Reflected Ceiling Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006_Waste Strategy_2024.06.21.pdfWaste Management · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9014_P01_Alleyway elevations_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-B1-DR-M-520-01-DRAINAGE LAYOUT LEVEL B1.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-03-DR-A-9023_P01_Third Floor_Demolition Plan (Completed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-UG-DR-A-9000_P01_Upper Ground Floor_GAs_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-02-DR-A-9152_P01_Second Floor_Internal Partitions ID Plan Copy 1.pdfPlan · PDF | 8 Jul 2024 | View |
| Heritage Assessment Addendum (S73 and S19 application) 20.06.2024.pdfHeritage Statement · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-XX-DR-A-9167_P01_Core Arrangment_Plan 22_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-B1-DR-M-57001-VENTILATION LAYOUT LEVEL B1.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-UG-DR-A-9100_P01_Upper Ground Floor - Existing plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-02-DR-E-68001-FIRE ALARM LAYOUT LEVEL 2.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-00-DR-M-530-01-DOMESTIC WATER LAYOUT LEVEL 00.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-MH-03-DR-A-9053_P01_Third Floor_Heritage Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-04-DR-A-9144__Fourth Floor - Foor types and finishes.pdfPlan · PDF | 8 Jul 2024 | View |
| Drawing list.pdfOther · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-05-DR-E-62001-SMALL POWER, DATA & SECURITY LAYOUT LEVEL 5.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9010_P01_North-West Elevations_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9081_P01_Remedial works - Intenal elevations_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-04-DR-A-9044_P01_Fourth Floor_Retention Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-XX-DR-A-9195_P01_Bloom Street - Street Views A_Planning.pdfPhoto · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-01-DR-A-9041_P01_First Floor_Retention Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-03-DR-A-9003_P01_Third Floor_GAs_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9015_P01_Section A-A_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-03-DR-M-570-01-VENTILATION LAYOUT LEVEL 03.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-B1-DR-M-59301-SMOKE EXTRACT LAYOUT LEVEL B1.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-MH-04-DR-A-9154_P01_Fourth Floor_Internal Partitions ID Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-XX-DR-A-9166_P01_Core Arrangement _Plan 12_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| MVHR Ventilation Statement v3.pdfSupporting Information · PDF | 8 Jul 2024 | View |
| PW - Construction Method Statement REV D 10.06.24 - Appendices Included-compressed.pdfSupporting Information · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9016_P01_Section B-B_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-B1-DR-M-570-01-VENTILATION LAYOUT LEVEL B1.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9082_P01_Cleaning Work_Plans_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-PW-XX-DR-A-9156_P01_Floor Details.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-XX-DR-A-9179_P01_Window detail - UGF Richmond St..pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-00-DR-E-61001-CONTAINMENT LAYOUT LEVEL 0.pdfPlan · PDF | 2 Dec 2024 | View |
| 240513 - 024322-R03-A Tender acoustic design report.pdfSupporting Information · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9080_P01_Remedial Works_External Elevation_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9083_P01_Cleaning works - Internal elevations_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-01-DR-M-590-01-DRY RISER LAYOUT LEVEL 01.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9162_P01_Main Staircase Plans - Sheet 2_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9120_P01_Main Entrance External Wall_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-01-DR-E-68001-FIRE ALARM LAYOUT LEVEL 1.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-MH-UG-DR-A-9050_P01_Upper Ground Floor_Heritage Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-XX-XX-RP-A-0004 - Section 73-19 Planning statement _21.06.24_3of4.pdfDesign & Access Statement · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-01-DR-M-570-02-VENTILATION ISOMETRIC LAYOUTS LEVEL 01.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-MH-XX-DR-A-9175_P01_Window Detail - LGF Window Tanking_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-UG-DR-A-9020_P01_Upper Ground Floor_Demolition Plan (Completed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-UG-DR-A-9140_P01_Upper Ground Floor - Floor types and finishes.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9080_P01_Proposed Remedial Works Elevation_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-XX-SH-M-57001-Extract Grille Schedule.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-XX-DR-A-9186_P01_Basement Grille_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9178_P01_Window Detail - 1st Floor Typical Timber Panel Window 1_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-03-DR-M-520-01-DRAINAGE LAYOUT LEVEL 03.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-LG-DR-A-9105_P01_Lower Ground Floor - Existing Plan Copy 1.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HRF-BS-XX-DR-A-9176_P01_Bin Store Curtain Walling_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-PW-XX-DR-A-9159_P01_Tanking Details.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-04-DR-M-590-01-DRY RISER LAYOUT LEVEL 04.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9116_P01_Long Section - Existing_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-03-DR-M-590-01-DRY RISER LAYOUT LEVEL 03.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-MH-03-DR-A-9133_P01_Third Floor - Reflected Ceiling Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-03-DR-A-9003_P01_Third Floor_GAs_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-XX-DR-A-9185_P01_Window detail - 4th Floor Typical_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-05-DR-A-9145_P01_Fifth Floor - Foor types and finishes.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-PW-XX-DR-A-9158_P01_Bloom Street and Mindel House Shadow Gap Details.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9164_P01_Rear Stair Enclosure - Plans Sheet 2_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-05-DR-A-9005_P01_Fifth Floor_GAs_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9115_P01_Cross Section - Existing_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-UG-DR-A-9100_P01_Upper Ground Floor - Existing Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9121_P01_Minshull St. External Wall..pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-XX-DR-A-9071_P01_Roof Extension details_12_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-XX-DR-A-9177_P01_Window detail - LGF Richmond St._Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-01-DR-Z-5-601-MEP HIGH LEVEL REFLECTED CEILING PLAN LEVEL 1.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-RP-DR-A-9007_P01_Roof Plan_GAs_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-MH-00-DR-M-57001-VENTILATION LAYOUT LEVEL 00.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9083_P01_Cleaning Works_internal Elevations_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-04-DR-A-9134_P01_Fourth Floor - Reflected Ceiling Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9113_P01_South West Elevation - Existing_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-05-DR-M-520-01-DRAINAGE LAYOUT LEVEL 05.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9125_P01_Penthouse Extension_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-03-DR-A-9033_P01_Third Floor_Demolition Plan (Proposed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-XX-DR-A-9072_P01_Roof extension details_22_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-04-DR-A-9004_P01_Fourth Floor_GAs_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-PW-XX-DR-A-9062_P01_Alleyway Design - Bloom Street - Elevation and section_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-UG-DR-A-9040_P01_Upper Ground Floor_Retention Plans_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9116_P01_Long Section - Existing_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-00-DR-M-590-01-DRY RISER LAYOUT LEVEL 00.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-XX-SH-M-57002-Supply Grille Schedule.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-B1-DR-E-63001-LIGHTING LAYOUT LEVEL B1.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9121_P01_Alleyway External Wall_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-UG-DR-A-9050_P01_Upper Ground Floor_Heritage Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9082_P01_Cleaning works - Plans_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-ZZ-ZZ-DR-M-57001-VENTILATION TYPICAL SECTIONS.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-XX-DR-A-9190_P01_External Doors Elevations_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-LG-DR-A-9045_P01_Lower Ground Floor_Retention Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9163_P01_Main Staircase Sections_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| Planning Statement Addendum 20.06.2024.pdfSupporting Information · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-04-DR-M-59301-SMOKE EXTRACT LAYOUT LEVEL 04.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-UG-DR-A-9150_P01_Upper Ground Floor_Internal Partitions ID Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-04-DR-M-530-01-DOMESTIC WATER LAYOUT LEVEL 04.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-02-DR-E-63001-LIGHTING LAYOUT LEVEL 2.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9010_P01_North-West Elevation_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9110_P01_North West Elevation - Existing_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-03-DR-A-9043_P01_Third Floor_Retention Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 20 - 1659 Piccadilly Warehouse PRA Report.pdfEcology report · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-XX-SH-A-9172_P01_Existing Window Schedule_Planning.pdfSupporting Information · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-03-DR-A-9043_P01_Third Floor_Retention Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-03-DR-A-9023_P01_Third Floor_Demolition Plan (Completed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-XX-DR-A-9171_P01_Secondary and New Windows Elevations_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9165_P01_Rear Stair Enclosure - Sections_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-XX-DR-A-9171_P01_Secondary and New Windows Elevations_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-RP-DR-A-9046_P01_Roof_Retention Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-05-DR-M-590-01-DRY RISER LAYOUT LEVEL 05.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-MH-01-DR-A-9001_P01_First Floor_GAs_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-04-DR-A-9144_P01_Fourth floor - Floor types and finishes.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-01-DR-M-57001-VENTILATION LAYOUT LEVEL 01.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-04-DR-A-9054_P01_Fourh Floor_Heritage Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-04-DR-M-520-01-DRAINAGE LAYOUT LEVEL 04.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-LG-DR-A-9146_P01_Lower Ground Floor - Foor types and finishes.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-01-DR-A-9141__First Floor - Floor Types and finishes.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9122_P01_Rear Exit External Wall_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-02-DR-A-9022_P01_Second Floor_Demolition Plan (Completed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-03-DR-A-9103_P01_Third Floor - Existing plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-01-DR-M-59301-SMOKE EXTRACT LAYOUT LEVEL 01.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-MH-UG-DR-A-9150_P01_Upper Ground Floor_Internal Partitions ID Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-XX-SH-A-9174_P01_Proposed New Window Schedule_Planning.pdfSupporting Information · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-03-DR-A-9133_P01_Third Floor - Reflected Ceiling Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-01-DR-M-530-01-DOMESTIC WATER LAYOUT LEVEL 01.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-MH-XX-DR-A-9177_P01_Window Detail - UGF Typical Timber Panel Window_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-RP-DR-A-9006_P01_Roof Plan_GAs_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| S73 and S19 Application Covering Letter (24.06.2024) combined.pdfCorrespondence · PDF | 8 Jul 2024 | View |
| 24006-HAK-MH-02-DR-M-57001-VENTILATION LAYOUT LEVEL 02.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-04-DR-A-9034_P01_Fourth Floor_Demolition Plan (Proposed)_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-XX-DR-A-9196_P01_Bloom Street - Street Views B_Planning.pdfPhoto · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9162_P01_Main Staircase - Sections_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-UG-DR-A-9000_P01_Upper Ground Floor_GAs_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| TECHNICAL NOTE 002 - Drainage Statement.pdfFlood Risk Assessment or Drainage · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-03-DR-A-9153_P01_Third Floor_Internal Partitions ID Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9165_P01_Rear Staircase Sections_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-02-DR-A-9132_P01_Second Floor - Reflected Ceiling Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-B1-DR-E-62001-SMALL POWER, DATA & SECURITY LAYOUT LEVEL B1.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-B1-DR-M-560-01-HEATING LAYOUT LEVEL B1.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-01-DR-E-61001-CONTAINMENT LAYOUT LEVEL 1.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-MH-ZZ-DR-A-9013_P01_South-West Elevation_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-UG-DR-A-9130_P01_Upper Ground Floor - Reflected Ceiling Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-01-DR-A-9051_P01_First Floor_Heritage Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-05-DR-A-9155_P01_Fifth Floor_Internal Partitions ID_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-LG-DR-A-9006_P01_Lower Ground Floor_GAs_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-MH-01-DR-M-57001-VENTILATION LAYOUT LEVEL 01.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-XX-DR-A-9168_P01_Core Arrangement_Sections_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-LG-DR-A-9135_P01_Lower Ground Floor - Reflected Ceiling Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-04-DR-E-63001-LIGHTING LAYOUT LEVEL 4.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9084_P01_Cleaning Works_Ceilings_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-01-DR-E-63001-LIGHTING LAYOUT LEVEL 1.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-XX-DR-A-9167_P01_Core Arrangement_Plan 22_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-XX-DR-A-9179_P01_Window Detail - 1st Floor Typical Timber Panel Window 2_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9114_P01_Alleyway Elevation - Existing_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-XX-DR-A-9070_P01_Roof sections_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9011_P01_North-East Elevation_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-MH-XX-DR-A-9136_P01_Ceiling Type Details_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-04-DR-E-68001-FIRE ALARM LAYOUT LEVEL 4.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-02-DR-A-9102_P01_Second Floor - Existing Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9112_P01_South East Elevation - Existing_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-05-DR-M-57001-VENTILATION LAYOUT LEVEL 05.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HFR-BS-01-DR-A-9151_P01_First Floor_Internal Partitions ID Plan_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
| 24006-HAK-BS-00-DR-M-560-01-HEATING LAYOUT LEVEL 00.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HAK-BS-03-DR-E-61001-CONTAINMENT LAYOUT LEVEL 3.pdfPlan · PDF | 2 Dec 2024 | View |
| 24006-HFR-BS-ZZ-DR-A-9013_P01_South-West Elevation_Planning.pdfPlan · PDF | 8 Jul 2024 | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
No related records were published in this section.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.