Council planning record

Demolition of the central atrium, car park ramps, and other elements, retention of casino (Sui Generis), bowling alley and existing food and drink unit (Use Class E) alongside to allow refurbishment, restoration and re-use of the Great Northern Car Park to provide office accommodation, retail and/or food and drink uses (Use Class E) and ancillary areas; and Refurbishment, restoration, partial demolition and erection of a 3-storey extension to Deansgate Terrace (northern section) and Goods Yard Entrance to form office, retail and / or food and drink use (Use Class E) and drinking establishments / hot food takeaway (Sui Generis), with associated public realm works comprising the reconfiguration of Great Northern Square and the introduction of additional public realm with associated hard and soft landscaping, highways works, access and servicing facilities, rooftop plant and other associated works; and Partial demolition of the existing leisure box to erect three residential buildings (ground plus 16, 27 and 34 storeys) to provide 746 residential apartments (Use Class C3), reconfiguration of existing car parking together with the creation of office, retail and / or food and drink use (Use Class E), or Sui Generis (drinking establishments / hot food takeaway) at ground floor and level 3, hard and soft landscaping, together with highways works, access and servicing facilities, rooftop plant and other associated works; and, External alterations and restoration of Deansgate Terrace (southern section) to provide office, retail or food and drink use (Use Class E) or Sui Generis (drinking establishments / hot food takeaway / live music venue), along with delivery of associated public realm, highways works, plant, and associated works

Land Bounded By Deansgate, Great Bridgewater Street, Watson Street & Peter Street Manchester M3 4EN

Recommendation MadeReference: 135565/FO/2022Manchester City Council

Last published check: 19 Oct 2026, 07:30. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Valid date

    Published milestoneCouncil source
  2. Consultation Deadline Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  3. Date of committee

    Published milestoneCouncil source
  4. Target decision date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Recommendation Made
Application type
Full planning permission
Received
Not published
Validated
24 Nov 2022
Determination deadline
29 May 2026
Local authority
Manchester City Council

Application overview

Demolition of the central atrium, car park ramps, and other elements, retention of casino (Sui Generis), bowling alley and existing food and drink unit (Use Class E) alongside to allow refurbishment, restoration and re-use of the Great Northern Car Park to provide office accommodation, retail and/or food and drink uses (Use Class E) and ancillary areas; and Refurbishment, restoration, partial demolition and erection of a 3-storey extension to Deansgate Terrace (northern section) and Goods Yard Entrance to form office, retail and / or food and drink use (Use Class E) and drinking establishments / hot food takeaway (Sui Generis), with associated public realm works comprising the reconfiguration of Great Northern Square and the introduction of additional public realm with associated hard and soft landscaping, highways works, access and servicing facilities, rooftop plant and other associated works; and Partial demolition of the existing leisure box to erect three residential buildings (ground plus 16, 27 and 34 storeys) to provide 746 residential apartments (Use Class C3), reconfiguration of existing car parking together with the creation of office, retail and / or food and drink use (Use Class E), or Sui Generis (drinking establishments / hot food takeaway) at ground floor and level 3, hard and soft landscaping, together with highways works, access and servicing facilities, rooftop plant and other associated works; and, External alterations and restoration of Deansgate Terrace (southern section) to provide office, retail or food and drink use (Use Class E) or Sui Generis (drinking establishments / hot food takeaway / live music venue), along with delivery of associated public realm, highways works, plant, and associated works

Proposal details

Reference
135565/FO/2022
Alternative references
PP-11685778
Ward
Deansgate
Agent
Mr Michael Percival

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Land Bounded By Deansgate, Great Bridgewater Street, Watson Street & Peter Street Manchester M3 4EN

This record has no verified map location.

Documents 383 of 383

DocumentPublishedAction
10422-SHP-Z0-A-B5D9-G100-PL-01-001.pdfSite Plan · PDF24 Nov 2022View
10422-SHP-Z0-A-B5D9-G100-PL-XX-001.pdfLocation Plan · PDF24 Nov 2022View
10422-SHP-Z3B-A-B5D9-G200-XP-RF-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z3B-A-B5D9-G200-XP-03-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-PL-08-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G251-DE-XX-010.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-PL-30-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G240-DE-RF-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z0-A-B5D9-G100-PL-12-001.pdfSite Plan · PDF24 Nov 2022View
Response to HSE Comments.pdfSupporting Information · PDF13 Jan 2023View
10422-SHP-Z2-A-B5D9-G200-XP-RF-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G332-PL-04-001.pdfPlan · PDF24 Nov 2022View
Appendix 8.6 - Verification - 16.11.2022.pdfEnvironmental Statement · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-JC20-XP-02-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-EL-EE-002.pdfPlan · PDF24 Nov 2022View
Great Northern - Listed Building Structural Report.pdfSupporting Information · PDF15 Dec 2022View
10422-SHP-Z4-A-B5D9-F200-PL-XX-005.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-PL-24-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z3-A-B5D9-G251-DE-EE-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z3B-A-B5D9-G200-XP-00-001.pdfPlan · PDF24 Nov 2022View
Appendix 8.4 - Traffic Data - 16.11.2022.pdfEnvironmental Statement · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-PL-15-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-EL-EE-001.pdfPlan · PDF24 Nov 2022View
Appendix 6.2 Great Northern TVIA Photos CBA 10 11 22.pdfEnvironmental Statement · PDF24 Nov 2022View
10422-SHP-Z3B-A-B5D9-G332-PL-00-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G240-DE-RF-005.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G230-DE-XX-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z3A-A-B5D9-G200-PL-03-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z3A-A-B5D9-G200-SE-XX-001.pdfPlan · PDF24 Nov 2022View
Fire Service Response.pdfSupporting Information · PDF13 Jan 2023View
10422-SHP-Z2-A-B5D9-G240-DE-RF-004.pdfPlan · PDF24 Nov 2022View
Appendix 5.7 Great Northern Outline Construction Management Plan.pdfEnvironmental Statement · PDF24 Nov 2022View
2891-PLA-XX-00-DR-L-2000-Softworks - Ground Floor.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z3-A-B5D9-G321-DE-XX-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z1-A-B5D9-G200-PL-RF-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z3A-A-B5D9-JC20-XP-B1-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G200-PL-04-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-XS-XX-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z3B-A-B5D9-G332-XP-00-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-PL-26-001.pdfPlan · PDF24 Nov 2022View
812180.pdfSupporting Information · PDF8 Apr 2026View
10422-SHP-Z3B-A-B5D9-G200-EL-EE-001.pdfPlan · PDF24 Nov 2022View
Great Northern - Public Realm Lighting.pdfSupporting Information · PDF24 Nov 2022View
Great Northern - Viability Executive Summary.pdfSupporting Information · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-PL-19-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z3A-A-B5D9-G200-XP-03-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G321-DE-XX-008.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-XP-RF-001.pdfPlan · PDF24 Nov 2022View
Great Northern Warehouse - Deansgate Terrace FRA and DS.pdfFlood Risk Assessment or Drainage · PDF24 Nov 2022View
10422-SHP-Z3A-A-B5D9-G200-XE-EE-001.pdfPlan · PDF24 Nov 2022View
Appendix 6.1 Great Northern TVIA Maps CBA 10 11 22.pdfEnvironmental Statement · PDF24 Nov 2022View
10422-SHP-Z0-A-B5D9-G100-PL-25-001.pdfSite Plan · PDF24 Nov 2022View
10422-SHP-Z3A-A-B5D9-G200-XS-XX-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z3A-A-B5D9-JC20-XP-02-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z3A-A-B5D9-G200-EL-EE-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-PL-03-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-PL-23-001.pdfPlan · PDF24 Nov 2022View
Appendix 8.2 - Legislation, Policy & Guidance - 16.11.2022.pdfEnvironmental Statement · PDF24 Nov 2022View
Appendix 11.2 Overshadowing Report (surrounding) Rev E.pdfEnvironmental Statement · PDF24 Nov 2022View
126517.pdfCorrespondence · PDF23 Nov 2022View
10422-SHP-Z2-A-B5D9-JC20-XP-RF-001.pdfPlan · PDF24 Nov 2022View
Appendix 5.1 - Leisure Box Car Parking.pdfEnvironmental Statement · PDF24 Nov 2022View
Great Northern - Design and Access Statement.pdfDesign & Access Statement · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-PL-32-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z3B-A-B5D9-G332-PL-02-001.pdfPlan · PDF24 Nov 2022View
Appendix 8.5 - Background Concentrations & Receptors - 16.11.2022.pdfEnvironmental Statement · PDF24 Nov 2022View
Great Northern - Planning and Tall Building Statement.pdfSupporting Information · PDF24 Nov 2022View
10422-SHP-Z3B-A-B5D9-G332-PL-B1-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-SE-AA-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z0-A-B5D9-G100-PL-02-001.pdfSite Plan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-PL-20-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z0-A-B5D9-G100-PL-RF-001.pdfSite Plan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G200-EL-EN-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G321-DE-XX-002.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-JC20-XP-04-001.pdfPlan · PDF24 Nov 2022View
Great Northern - Energy Statement.pdfSupporting Information · PDF24 Nov 2022View
10422-SHP-Z0-A-B5D9-G100-PL-10-001.pdfSite Plan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G200-XE-ES-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z3B-A-B5D9-G200-EL-XX-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z3A-A-B5D9-G332-PL-02-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z3-A-B5D9-G251-DE-EE-003.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z0-A-B5D9-Z460-XP-00-002.pdfSite Plan · PDF24 Nov 2022View
10422-SHP-Z0-A-B5D9-G100-XE-EW-001.pdfSite Plan · PDF24 Nov 2022View
Great Northern - ES Volume 1.pdfEnvironmental Statement · PDF24 Nov 2022View
10422-SHP-Z3B-A-B5D9-JC20-XP-02-001.pdfPlan · PDF24 Nov 2022View
2891-PLA-XX-12-DR-L-1000-Hardworks - Upper Terraces.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G200-PL-M0-001.pdfPlan · PDF24 Nov 2022View
Great Northern LBC - Aura Heritage Survey 2022.pdfHeritage Statement · PDF24 Nov 2022View
10422-SHP-Z3B-A-B5D9-JC20-XP-00-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z3B-A-B5D9-G200-PL-00-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z3B-A-B5D9-G200-PL-RF-001.pdfPlan · PDF24 Nov 2022View
Appendix 2.1 - Scoping Report (August 2022).pdfEnvironmental Statement · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-EL-EW-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z3A-A-B5D9-G200-PL-02-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-PL-16-001.pdfPlan · PDF24 Nov 2022View
Appendix 9.2 - Baseline Noise Survey Details.pdfEnvironmental Statement · PDF24 Nov 2022View
2891-PLA-XX-02-DR-L-3000-Illustrative Sections - Second Floor.pdfPlan · PDF24 Nov 2022View
Great Northern - Transport Statement.pdfTransport or Travel information · PDF24 Nov 2022View
10422-SHP-Z3A-A-B5D9-G200-XS-XX-002.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z3-A-B5D9-G321-DE-XX-002.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z3B-A-B5D9-G200-PL-01-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-PL-27-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-PL-B1-001.pdfPlan · PDF24 Nov 2022View
Great Northern - Phase 1 Detailed Geo-Environmental Study.pdfGround Survey · PDF24 Nov 2022View
2891-PLA-XX-00-DR-L-1000-Hardworks - Ground Floor.pdfPlan · PDF24 Nov 2022View
Appendix 9.5 - Gym Acoustic Treatment.pdfEnvironmental Statement · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G251-DE-XX-009.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z3B-A-B5D9-JC20-XP-RF-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G200-PL-02-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G251-DE-XX-011.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G321-DE-XX-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z0-A-B5D9-Z460-PL-XX-001.pdfSite Plan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G200-XP-01-001.pdfPlan · PDF24 Nov 2022View
Great Northern - Broadband Connectivity Assessment (1).pdfSupporting Information · PDF24 Nov 2022View
Great Northern - Crime Impact Statement.pdfSupporting Information · PDF24 Nov 2022View
10422-SHP-Z3A-A-B5D9-G200-XP-02-001.pdfPlan · PDF24 Nov 2022View
Great Northern - Arboricultural Report.pdfTree survey or information · PDF24 Nov 2022View
Great Northern - Waste and Servicing Strategy.pdfWaste Management · PDF24 Nov 2022View
10422-SHP-Z3A-A-B5D9-G332-XP-02-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z3A-A-B5D9-G200-PL-B1-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-PL-31-001.pdfPlan · PDF24 Nov 2022View
Great Northern - Preliminary Ecological Appraisal.pdfEcology report · PDF17 Jan 2023View
Great Northern - Structural Report.pdfSupporting Information · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G251-DE-00-003.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G200-PL-RF-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-F200-PL-XX-004.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z0-A-B5D9-G100-PL-04-001.pdfSite Plan · PDF24 Nov 2022View
Great Northern - Environmental Standards Statement and BREEAM.pdfSupporting Information · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G251-DE-02-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G251-DE-XX-002.pdfPlan · PDF24 Nov 2022View
Appendix 9.3 - Construction Noise Assessment.pdfEnvironmental Statement · PDF24 Nov 2022View
10422-SHP-Z3B-A-B5D9-G332-XP-01-001.pdfPlan · PDF24 Nov 2022View
Great Northern - Detailed UXO Risk Assessment.pdfSupporting Information · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G200-EL-EE-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-PL-RF-001.pdfPlan · PDF24 Nov 2022View
Great Northern - Aviation Impact Assessment.pdfSupporting Information · PDF24 Nov 2022View
Great Northern - Television Baseline Survey Report (1).pdfSupporting Information · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G240-DE-RF-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-XP-00-001.pdfPlan · PDF24 Nov 2022View
2023.01.24 - Great Northern - Outline CMP Explanatory Note - Rev 00.pdfSupporting Information · PDF24 Jan 2023View
Appendix 5.2 - Tenant Ops.pdfEnvironmental Statement · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G251-DE-XX-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-JC20-XS-SE-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-JC20-XP-03-001.pdfPlan · PDF24 Nov 2022View
Appendix 11.4 - Table 11.2 - Cumulative Table Great Northern.pdfEnvironmental Statement · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G332-PL-02-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-PL-29-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z3A-A-B5D9-G200-SE-XX-002.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-PL-22-001.pdfPlan · PDF24 Nov 2022View
2891-PLA-XX-00-DR-L-0002-Tree Retention and removal - Ground Floor.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z3A-A-B5D9-G332-XP-00-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G321-DE-XX-006.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z0-A-B5D9-G100-XE-EN-001.pdfSite Plan · PDF24 Nov 2022View
Great Northern - Statement of Community Involvement.pdfSupporting Information · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-PL-25-001.pdfPlan · PDF25 Nov 2022View
10422-SHP-Z3B-A-B5D9-G200-PL-02-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z0-A-B5D9-G100-SE-AA-001.pdfSite Plan · PDF24 Nov 2022View
Appendix 11.3 - Glare Report Rev E.pdfEnvironmental Statement · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-XP-03-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G200-SE-AA-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-PL-14-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G251-DE-02-002.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-PL-05-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-PL-21-001.pdfPlan · PDF24 Nov 2022View
2891-PLA-XX-01-DR-L-1000-Hardworks - First Floor.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-JC20-XP-00-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G251-DE-XX-003.pdfPlan · PDF24 Nov 2022View
2891-PLA-XX-02-DR-L-0001-Landscape Masterplan - Second Floor.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G332-PL-00-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G240-DE-00-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z3-A-B5D9-G251-DE-EW-002.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G200-XP-02-001.pdfPlan · PDF24 Nov 2022View
Appendix 8.X - GN 6 Month Monitoring Summary.pdfSupporting Information · PDF13 Jan 2023View
10422-SHP-Z3A-A-B5D9-G200-XP-01-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-EL-EN-002.pdfPlan · PDF24 Nov 2022View
2891-PLA-XX-01-DR-L-4000-Furniture - First Floor.pdfPlan · PDF24 Nov 2022View
812175.pdfSupporting Information · PDF8 Apr 2026View
10422-SHP-Z4-A-B5D9-G200-XP-04-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G332-PL-M1-001.pdfPlan · PDF24 Nov 2022View
Great Northern - Ventilation Strategy.pdfSupporting Information · PDF24 Nov 2022View
10422-SHP-Z3B-A-B5D9-G200-XP-02-001.pdfPlan · PDF24 Nov 2022View
Great Northern - Public Realm Strategy.pdfSupporting Information · PDF24 Nov 2022View
10422-SHP-Z3B-A-B5D9-G332-XP-B1-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G200-XP-03-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G251-DE-XX-008.pdfPlan · PDF24 Nov 2022View
814556.pdfSupporting Information · PDF13 Apr 2026View
10422-SHP-Z3A-A-B5D9-G200-XP-00-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G332-PL-01-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G200-PL-01-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G251-DE-00-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G332-XP-00-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z0-A-B5D9-G100-XS-AA-001.pdfSite Plan · PDF24 Nov 2022View
Great Northern - Security Threat Assessment.pdfSupporting Information · PDF24 Nov 2022View
10422-SHP-Z0-A-B5D9-G100-XE-EE-001.pdfSite Plan · PDF24 Nov 2022View
10422-SHP-Z3B-A-B5D9-JC20-XE-XX-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G200-XS-BB-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z0-A-B5D9-G100-EL-EE-002.pdfSite Plan · PDF24 Nov 2022View
Great Northern Leisurebox - FRA and DS.pdfFlood Risk Assessment or Drainage · PDF24 Nov 2022View
10422-SHP-Z3B-A-B5D9-G332-XP-02-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-F200-PL-XX-001.pdfPlan · PDF24 Nov 2022View
Great Northern LBC - Basement Condition Report 2022.pdfSupporting Information · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-PL-02-001.pdfPlan · PDF24 Nov 2022View
126730.pdfApplication Form · PDF23 Nov 2022View
10422-SHP-Z3A-A-B5D9-JC20-XE-EE-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G200-XP-M1-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z0-A-B5D9-G100-EL-EW-001.pdfSite Plan · PDF24 Nov 2022View
10422-SHP-Z3-A-B5D9-G251-DE-EW-003.pdfPlan · PDF24 Nov 2022View
2891-PLA-XX-01-DR-L-2000-Softworks - First Floor.pdfPlan · PDF24 Nov 2022View
Appendix 6.3 Visualization Methodology CBA 10 11 22.pdfEnvironmental Statement · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-JC20-SC-XX-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-EL-EN-001.pdfPlan · PDF24 Nov 2022View
2891-PLA-XX-02-DR-L-1000-Hardworks - Second Floor.pdfPlan · PDF24 Nov 2022View
2891-PLA-XX-00-DR-L-0001-Landscape Masterplan - Ground Floor.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-JC20-XE-EW-001.pdfPlan · PDF24 Nov 2022View
Great Northern - Leisure Box Fire Statement.pdfSupporting Information · PDF24 Nov 2022View
Great Northern - Private Gardens and Terraces Lighting.pdfSupporting Information · PDF24 Nov 2022View
10422-SHP-Z3B-A-B5D9-G200-XP-B1-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z3B-A-B5D9-G200-SE-XX-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-PL-07-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-EL-EW-002.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z0-A-B5D9-Z460-XP-00-001.pdfSite Plan · PDF24 Nov 2022View
Appendix 8.8 - Impact Assessment Results - 16.11.2022.pdfEnvironmental Statement · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G200-XP-00-001.pdfPlan · PDF24 Nov 2022View
2891-PLA-XX-12-DR-L-4000-Furniture - Upper Terraces.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G200-EL-ES-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z3A-A-B5D9-G200-XE-XX-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G332-XP-04-001.pdfPlan · PDF24 Nov 2022View
Appendix 5.3 - Sitewide Demolition Phasing.pdfEnvironmental Statement · PDF24 Nov 2022View
10422-SHP-Z3A-A-B5D9-G332-XP-B1-001.pdfPlan · PDF24 Nov 2022View
Appendix 10.1 - Wind Microclimate Assessment.pdfEnvironmental Statement · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G251-DE-01-003.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G220-DE-XX-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z0-A-B5D9-G100-PL-33-001.pdfSite Plan · PDF24 Nov 2022View
10422-SHP-Z3B-A-B5D9-G200-PL-03-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z0-A-B5D9-G100-PL-00-001.pdfSite Plan · PDF24 Nov 2022View
10422-SHP-Z3B-A-B5D9-JC20-XP-03-001.pdfPlan · PDF24 Nov 2022View
Great Northern LBC - Roof Report.pdfSupporting Information · PDF24 Nov 2022View
2891-PLA-XX-01-DR-L-0001-Landscape Masterplan-First Floor.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G321-DE-XX-007.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z3B-A-B5D9-G200-PL-B1-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G332-XP-03-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z3A-A-B5D9-G332-PL-B1-001.pdfPlan · PDF24 Nov 2022View
Great Northern - Residential Management Strategy.pdfSupporting Information · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-XE-EW-001.pdfPlan · PDF24 Nov 2022View
2891-PLA-XX-00-DR-L-3000-Levels - Ground Floor.pdfPlan · PDF24 Nov 2022View
Great Northern - Place Strategy.pdfSupporting Information · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-PL-33-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z1-A-B5D9-G200-SE-AA-001.pdfPlan · PDF24 Nov 2022View
Great Northern - Framework Travel Plan.pdfTransport or Travel information · PDF24 Nov 2022View
10422-SHP-Z0-A-B5D9-G100-SE-BB-001.pdfSite Plan · PDF24 Nov 2022View
10422-SHP-Z3-A-B5D9-G240-DE-RF-001.pdfPlan · PDF24 Nov 2022View
Appendix 8.7 - Modelled Buildings - 16.11.2022.pdfEnvironmental Statement · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-PL-34-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-PL-04-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z3A-A-B5D9-JC20-XP-RF-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G251-DE-01-001.pdfPlan · PDF24 Nov 2022View
Appendix 5.6 - Leisure Box Interventions Sequence.pdfEnvironmental Statement · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-JC20-XP-M0-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G251-DE-XX-002.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G200-XE-EN-001.pdfPlan · PDF24 Nov 2022View
Great Northern LBC - Window Survey 2022.pdfSupporting Information · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-XP-B1-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z0-A-B5D9-G100-EL-EN-001.pdfSite Plan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-Z330-SC-XX-001.pdfPlan · PDF24 Nov 2022View
2891-PLA-XX-12-DR-L-0001-Landscape Masterplan - Upper Terraces.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-PL-01-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-XE-EN-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-JC20-XP-01-001.pdfPlan · PDF24 Nov 2022View
Appendix 7.1 - Heritage Assessment.pdfEnvironmental Statement · PDF24 Nov 2022View
10422-SHP-Z3B-A-B5D9-JC20-XP-B1-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G200-PL-M1-001.pdfPlan · PDF24 Nov 2022View
Appendix 5.4 - GNW Sitewide Logistics Plans.pdfEnvironmental Statement · PDF24 Nov 2022View
230113-R00-MA21195-WP3- Fire Service Access Residential Floor-DN-CIC.pdfSupporting Information · PDF13 Jan 2023View
10422-SHP-Z3A-A-B5D9-G200-EL-XX-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G251-DE-01-002.pdfPlan · PDF24 Nov 2022View
Great Northern - Telecommunications Impact Assessment (1).pdfSupporting Information · PDF24 Nov 2022View
135565 draft s106 23 2 24.pdfSection 106 Agreement · PDF28 Feb 2024View
10422-SHP-Z2-A-B5D9-G332-XP-01-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z3-A-B5D9-JC20-SC-XX-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z3A-A-B5D9-JC20-XP-00-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z3A-A-B5D9-G200-PL-00-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z3A-A-B5D9-JC20-XP-01-001.pdfPlan · PDF24 Nov 2022View
Great Northern - Facade Lighting Strategy.pdfSupporting Information · PDF24 Nov 2022View
10422-SHP-Z3B-A-B5D9-G200-XP-01-001.pdfPlan · PDF24 Nov 2022View
Great Northern LBC - Damp Decay Survey 2022.pdfSupporting Information · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-JC20-XE-EN-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-PL-13-001.pdfPlan · PDF24 Nov 2022View
Appendix 11.1 - Daylight Sunlight Report Rev 6.pdfEnvironmental Statement · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-JC20-XP-M1-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-PL-28-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-F200-PL-XX-002.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G200-XP-M0-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z3A-A-B5D9-G200-PL-01-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G332-XP-02-001.pdfPlan · PDF24 Nov 2022View
2891-PLA-XX-00-DR-L-4000-Furniture - Ground Floor.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z3-A-B5D9-G251-DE-EW-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G200-XE-EE-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z3A-A-B5D9-JC20-XE-XX-001.pdfPlan · PDF24 Nov 2022View
Appendix 8.X - GN 6 Month Monitoring Summary.pdfSupporting Information · PDF10 Jan 2023View
2891-PLA-XX-02-DR-L-2000-Softworks - Second Floor.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z3A-A-B5D9-G200-XP-RF-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-PL-17-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G321-DE-XX-004.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z0-A-B5D9-G100-EL-EE-001.pdfSite Plan · PDF24 Nov 2022View
Appendix 9.4 - Overheating and Noise Assessment.pdfEnvironmental Statement · PDF24 Nov 2022View
10422-SHP-Z1-A-B5D9-G200-PL-00-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-PL-10-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z3-A-B5D9-G251-DE-XX-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-PL-00-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G332-PL-M0-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G321-DE-XX-005.pdfPlan · PDF24 Nov 2022View
Great Northern - NTS.pdfEnvironmental Statement · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G220-XD-XX-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-PL-18-001.pdfPlan · PDF24 Nov 2022View
Appendix 9.1 - Legislation and policy.pdfEnvironmental Statement · PDF24 Nov 2022View
10422-SHP-Z3A-A-B5D9-JC20-XP-03-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z3A-A-B5D9-G332-PL-00-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z1-A-B5D9-G200-PL-B1-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G251-DE-XX-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z0-A-B5D9-G100-XP-RF-001.pdfSite Plan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-PL-09-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G200-PL-03-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z1-A-B5D9-G200-EL-XX-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z3A-A-B5D9-G332-XP-01-001.pdfPlan · PDF24 Nov 2022View
221125-R01-MA21195-WP3-Leisure Box_Outline_Fire_Strategy-OF-CIC.pdfSupporting Information · PDF13 Jan 2023View
10422-SHP-Z3-A-B5D9-Z330-SC-XX-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z3B-A-B5D9-G332-PL-01-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z3A-A-B5D9-G200-PL-RF-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G240-DE-RF-002.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G200-EL-EW-001.pdfPlan · PDF24 Nov 2022View
LF-AJ-23-3971-RSA1.pdfSupporting Information · PDF25 Jan 2023View
10422-SHP-Z4-A-B5D9-G200-XP-02-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G240-DE-RF-003.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z0-A-B5D9-Z460-PL-XX-002.pdfSite Plan · PDF24 Nov 2022View
10422-SHP-Z3B-A-B5D9-G200-XE-XX-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G321-DE-XX-010.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G240-DE-00-002.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G251-DE-00-002.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-SE-BB-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G321-DE-XX-003.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G251-DE-XX-005.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G251-DE-XX-004.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G251-DE-XX-006.pdfPlan · PDF24 Nov 2022View
Appendix 8.1 - Glossary of Terms - 16.11.2022.pdfEnvironmental Statement · PDF24 Nov 2022View
10422-SHP-Z3-A-B5D9-G251-DE-EE-002.pdfPlan · PDF24 Nov 2022View
Great Northern - Operational Management Strategy.pdfSupporting Information · PDF24 Nov 2022View
2891-PLA-XX-02-DR-L-4000-Furniture - Second Floor.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G200-XE-EW-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-JC20-XE-EE-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G200-XS-AA-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G200-PL-00-001.pdfPlan · PDF24 Nov 2022View
2891-PLA-XX-12-DR-L-2000-Softworks - Upper Terraces.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-JC20-XE-ES-001.pdfPlan · PDF24 Nov 2022View
Appendix 8.3 - 2019 Manchester Windrose - 16.11.2022.pdfEnvironmental Statement · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-PL-12-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-EL-ES-002.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G251-DE-XX-007.pdfPlan · PDF27 Nov 2022View
10422-SHP-Z3A-A-B5D9-G200-XP-B1-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G200-SE-BB-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-PL-06-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G321-DE-XX-009.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z3B-A-B5D9-JC20-XE-EE-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z0-A-B5D9-G100-XE-EE-002.pdfSite Plan · PDF24 Nov 2022View
2891-PLA-XX-00-DR-L-3001-Illustrative Sections - Ground Floor.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G200-EL-XX-001.pdfPlan · PDF24 Nov 2022View
Appendix 5.5 - Programme Issue.pdfEnvironmental Statement · PDF24 Nov 2022View
10422-SHP-Z3B-A-B5D9-JC20-XP-01-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-JC20-XP-RF-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z3B-A-B5D9-G200-XS-XX-001.pdfPlan · PDF24 Nov 2022View
Appendix 2.2 - Scoping Opinion.pdfEnvironmental Statement · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-PL-11-001.pdfPlan · PDF24 Nov 2022View
Great Northern - Archaelogical Desk Based Assessment.PDFSupporting Information · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-EL-ES-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-XE-ES-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-XE-EE-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-F200-PL-XX-003.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z4-A-B5D9-G200-XP-01-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G332-PL-03-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z3B-A-B5D9-G200-XE-EE-001.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G251-DE-00-004.pdfPlan · PDF24 Nov 2022View
10422-SHP-Z2-A-B5D9-G200-XP-04-001.pdfPlan · PDF24 Nov 2022View
Great Northern - Interior Lighting Strategy.pdfSupporting Information · PDF24 Nov 2022View
10422-SHP-Z3A-A-B5D9-G332-PL-01-001.pdfPlan · PDF24 Nov 2022View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Recommendation Made
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.