Council planning record

Refurbishment and alteration works to office building comprising the reconfiguration of main entrance and expansion of reception area, use of lower ground floor as a bar (sui generis), removal of glazed canopy over main entrance, infill of enclosed area at 5th floor level (creating 37 sqm Use Class E(g)(i) office space), replacement of existing glazed entrance screen; repainting of modern ground floor feature western elevation, guardrails, and window frames; replacement of external lighting and removal of redundant lighting; installation of platform lifts; removal of car lift, roller shutter door and louver to vehicle entrance to north elevation of building and creation of additional glazed entrance and reception; installation of upgraded toilet facilities; use of basement for bike store, gym, sauna, changing facilities, toilets and showers ancillary to existing office use of building; other internal works to enable enhancement of internal spaces; removal of redundant plant to roof level and installation of new plant and PV panels

Freetrade Exchange 37 Peter Street Manchester M2 5GB

FinalReference: 133282/LO/2022Manchester City Council

Last published check: 11 Oct 2026, 06:29. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Valid date

    Published milestoneCouncil source
  2. Decision notice sent date

    Published milestoneCouncil source
  3. Target decision date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Final
Application type
Listed building consent (Alt/Ext)
Received
Not published
Validated
4 Mar 2022
Determination deadline
26 Jul 2022
Local authority
Manchester City Council

Application overview

Refurbishment and alteration works to office building comprising the reconfiguration of main entrance and expansion of reception area, use of lower ground floor as a bar (sui generis), removal of glazed canopy over main entrance, infill of enclosed area at 5th floor level (creating 37 sqm Use Class E(g)(i) office space), replacement of existing glazed entrance screen; repainting of modern ground floor feature western elevation, guardrails, and window frames; replacement of external lighting and removal of redundant lighting; installation of platform lifts; removal of car lift, roller shutter door and louver to vehicle entrance to north elevation of building and creation of additional glazed entrance and reception; installation of upgraded toilet facilities; use of basement for bike store, gym, sauna, changing facilities, toilets and showers ancillary to existing office use of building; other internal works to enable enhancement of internal spaces; removal of redundant plant to roof level and installation of new plant and PV panels

Proposal details

Reference
133282/LO/2022
Alternative references
PP-11049478
Ward
Deansgate
Agent
Mr Don Murphy

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Freetrade Exchange 37 Peter Street Manchester M2 5GB

This record has no verified map location.

Documents 143 of 143

DocumentPublishedAction
CFM.AR(PL)101.pdfPlan · PDF4 Mar 2022View
CFM.AR(10)019.pdfPlan · PDF4 Mar 2022View
CFM.AR(99)019.pdfPlan · PDF4 Mar 2022View
CFM.AR(PL)113.pdfPlan · PDF8 Jun 2022View
CFM.AR(35)012.pdfPlan · PDF4 Mar 2022View
CFM.AR(PL)103.pdfPlan · PDF4 Mar 2022View
CFM.AR(33)015.pdfPlan · PDF4 Mar 2022View
CFM.AR(10)007.pdfPlan · PDF4 Mar 2022View
CFM.AR(10)002.pdfPlan · PDF4 Mar 2022View
CFM.AR(35)003.pdfPlan · PDF4 Mar 2022View
CFM.AR(10)009.pdfPlan · PDF4 Mar 2022View
CFM.AR(42)014.pdfPlan · PDF4 Mar 2022View
CFM.AR(PL)110.pdfPlan · PDF8 Jun 2022View
CFM.AR(99)022.pdfPlan · PDF4 Mar 2022View
CFM.AR(SK)100_Location Plan.pdfLocation Plan · PDF4 Mar 2022View
CFM.AR(22)017.pdfPlan · PDF4 Mar 2022View
CFM.AR(33)014.pdfPlan · PDF4 Mar 2022View
CFM.AR(42)011.pdfPlan · PDF4 Mar 2022View
CFM.AR(10)008.pdfPlan · PDF4 Mar 2022View
CFM.AR(10)014.pdfPlan · PDF4 Mar 2022View
CFM.AR(PL)111.pdfPlan · PDF8 Jun 2022View
CFM.AR(43)016.pdfPlan · PDF4 Mar 2022View
3882-HAN-ZZ-XX-DR-PS-01 PLANNING-3882-HAN-ZZ-XX-DR-PS-01-07.pdfPlan · PDF4 Mar 2022View
CFM.AR(99)008.pdfPlan · PDF4 Mar 2022View
3882-HAN-ZZ-XX-DR-E 04-00 Typical Floor Lighting Layout.pdfPlan · PDF4 Mar 2022View
Freetrade Exchange Crime Impact Statement.pdfSupporting Information · PDF4 Mar 2022View
CFM.AR(22)014.pdfPlan · PDF4 Mar 2022View
CFM.AR(42)018.pdfPlan · PDF4 Mar 2022View
CFM.AR(42)013.pdfPlan · PDF7 Jun 2022View
3882-HAN-ZZ-XX-DR-PS-02 Builders work-3882-HAN-ZZ-BL-DR-PS-02-01.pdfPlan · PDF4 Mar 2022View
CFM.AR(99)002.pdfPlan · PDF4 Mar 2022View
CFM.AR(PL)100.pdfLocation Plan · PDF4 Mar 2022View
CFM.AR(35)018.pdfPlan · PDF4 Mar 2022View
CFM.AR(10)015.pdfPlan · PDF4 Mar 2022View
CFM.AR(35)013.pdfPlan · PDF4 Mar 2022View
CFM.AR(99)012.pdfPlan · PDF4 Mar 2022View
CFM.AR(99)009.pdfPlan · PDF4 Mar 2022View
CFM.AR(35)015.pdfPlan · PDF4 Mar 2022View
CFM.AR(10)004.pdfPlan · PDF4 Mar 2022View
CFM.AR(43)017.pdfPlan · PDF4 Mar 2022View
CFM.AR(43)011.pdfPlan · PDF4 Mar 2022View
3882-HAN-ZZ-XX-DR-PS-01 PLANNING-3882-HAN-ZZ-RL-DR-PS-01-05.pdfPlan · PDF4 Mar 2022View
CFM.AR(99)015.pdfPlan · PDF4 Mar 2022View
3882-HAN-ZZ-XX-DR-E 04-00 Ground Floor Lighting Layout.pdfPlan · PDF4 Mar 2022View
Officer Report FULL.pdfOfficer Report · PDF26 Jul 2022View
Freetrade Exchange Application Cover Letter.pdfCorrespondence · PDF4 Mar 2022View
CFM.AR(22)013.pdfPlan · PDF8 Jun 2022View
CFM.AR(99)016.pdfPlan · PDF4 Mar 2022View
Freetrade Exchange Design and Access Statement.pdfDesign & Access Statement · PDF4 Mar 2022View
CFM.AR(10)021.pdfPlan · PDF4 Mar 2022View
Freetrade Exchange Noise Assessment.pdfNoise assessment or information · PDF4 Mar 2022View
CFM.AR(33)011.pdfPlan · PDF4 Mar 2022View
CFM.AR(10)017.pdfPlan · PDF4 Mar 2022View
3882-HAN-ZZ-XX-DR-M-02-11 Typical Floor Comfort Cooling Layout.pdfPlan · PDF4 Mar 2022View
CFM.AR(10)016.pdfPlan · PDF4 Mar 2022View
CFM.AR(35)017.pdfPlan · PDF4 Mar 2022View
CFM.AR(PL)102.pdfPlan · PDF4 Mar 2022View
CFM.AR(35)006.pdfPlan · PDF4 Mar 2022View
CFM.AR(33)013.pdfPlan · PDF4 Mar 2022View
CFM.AR(42)018.pdfPlan · PDF7 Jun 2022View
CFM.AR(35)016.pdfPlan · PDF4 Mar 2022View
3882-HAN-ZZ-XX-DR-PS-01 PLANNING-3882-HAN-ZZ-XX-DR-PS-01-06.pdfPlan · PDF4 Mar 2022View
CFM.AR(PL)104.pdfPlan · PDF4 Mar 2022View
CFM.AR(35)001.pdfPlan · PDF4 Mar 2022View
CFM.AR(43)014.pdfPlan · PDF4 Mar 2022View
CFM.AR(35)004.pdfPlan · PDF4 Mar 2022View
CFM.AR(10)012.pdfPlan · PDF4 Mar 2022View
CFM.AR(99)018.pdfPlan · PDF4 Mar 2022View
3882-HAN-ZZ-00-DR-M-02-12 Ground Floor Comfort Cooling Layout.pdfPlan · PDF4 Mar 2022View
CFM.AR(35)014.pdfPlan · PDF4 Mar 2022View
CFM.AR(99)010.pdfPlan · PDF4 Mar 2022View
CFM.AR(43)012.pdfPlan · PDF4 Mar 2022View
CFM.AR(99)011.pdfPlan · PDF4 Mar 2022View
CFM.AR(99)001.pdfPlan · PDF4 Mar 2022View
app p.pdfApplication Form · PDF4 Mar 2022View
CFM.AR(PL)114.pdfPlan · PDF8 Jun 2022View
3882-HAN-ZZ-00-DR-M-11-02 Ground Floor BCO Zones.pdfPlan · PDF4 Mar 2022View
CFM.AR(99)017.pdfPlan · PDF4 Mar 2022View
3882-HAN-ZZ-XX-DR-PS-01 PLANNING-3882-HAN-ZZ-XX-DR-PS-01-04.pdfPlan · PDF4 Mar 2022View
CFM.AR(10)013.pdfPlan · PDF4 Mar 2022View
CFM.AR(99)021.pdfPlan · PDF8 Jun 2022View
CFM.AR(35)011.pdfPlan · PDF4 Mar 2022View
CFM.AR(35)002.pdfPlan · PDF4 Mar 2022View
3882-HAN-ZZ-XX-RP-MEP-004.pdfSupporting Information · PDF8 Jun 2022View
MLADrawingRegister2_220210.pdfSupporting Information · PDF4 Mar 2022View
CFM.AR(10)005.pdfPlan · PDF4 Mar 2022View
CFM.AR(42)014.pdfPlan · PDF7 Jun 2022View
CFM.AR(42)016.pdfPlan · PDF7 Jun 2022View
CFM.AR(22)015.pdfPlan · PDF4 Mar 2022View
CFM.AR(42)015.pdfPlan · PDF4 Mar 2022View
CFM.AR(42)015.pdfPlan · PDF7 Jun 2022View
CFM.AR(42)012.pdfPlan · PDF4 Mar 2022View
Freetrade Exchange Planning Statement.pdfSupporting Information · PDF4 Mar 2022View
CFM.AR(42)017.pdfPlan · PDF4 Mar 2022View
CFM.AR(33)012.pdfPlan · PDF4 Mar 2022View
CFM.AR(10)001.pdfPlan · PDF4 Mar 2022View
CFM.AR(35)008.pdfPlan · PDF4 Mar 2022View
CFM.AR(99)014.pdfPlan · PDF4 Mar 2022View
CFM.AR(33)016.pdfPlan · PDF4 Mar 2022View
Freetrade Exchange Heritage Statement.pdfHeritage Statement · PDF7 Jun 2022View
MLADrawingRegister3_220218.pdfSupporting Information · PDF4 Mar 2022View
CFM.AR(42)016.pdfPlan · PDF4 Mar 2022View
3882-HAN-ZZ-XX-DR-E 04-04 Notional Lighting Layout External.pdfPlan · PDF8 Jun 2022View
CFM.AR(33)018.pdfPlan · PDF4 Mar 2022View
CFM.AR(10)006.pdfPlan · PDF4 Mar 2022View
CFM.AR(99)005.pdfPlan · PDF4 Mar 2022View
Freetrade Exchange Damp Proofing Statement.pdfSupporting Information · PDF4 Mar 2022View
CFM.AR(22)018.pdfPlan · PDF4 Mar 2022View
CFM.AR(99)007.pdfPlan · PDF4 Mar 2022View
CFM.AR(99)020.pdfPlan · PDF8 Jun 2022View
CFM.AR(35)005.pdfPlan · PDF4 Mar 2022View
026907.pdfDecision · PDF26 Jul 2022View
CFM.AR(99)013.pdfPlan · PDF8 Jun 2022View
CFM.AR(10)018.pdfPlan · PDF4 Mar 2022View
CFM.AR(35)007.pdfPlan · PDF4 Mar 2022View
CFM.AR(10)020.pdfPlan · PDF8 Jun 2022View
CFM.AR(42)012.pdfPlan · PDF7 Jun 2022View
CFM.AR(42)011.pdfPlan · PDF7 Jun 2022View
CFM.AR(43)013.pdfPlan · PDF4 Mar 2022View
CFM.AR(PL)112.pdfPlan · PDF8 Jun 2022View
3882-HAN-ZZ-XX-DR-PS-01 PLANNING-3882-HAN-ZZ-LG-DR-PS-01-02.pdfPlan · PDF4 Mar 2022View
CFM.AR(99)004.pdfPlan · PDF4 Mar 2022View
CFM.AR(22)012.pdfPlan · PDF8 Jun 2022View
CFM.AR(42)013.pdfPlan · PDF4 Mar 2022View
CFM.AR(99)003.pdfPlan · PDF4 Mar 2022View
Ecophon_Solo_Rectangle-suspended ceiling raft.pdfSupporting Information · PDF7 Jun 2022View
3882-HAN-ZZ-XX-DR-PS-01 PLANNING-3882-HAN-ZZ-BL-DR-PS-01-01.pdfPlan · PDF4 Mar 2022View
Lang_and_Fulton_Louvred_Grilles.pdfSupporting Information · PDF7 Jun 2022View
CFM.AR(10)011.pdfPlan · PDF4 Mar 2022View
Freetrade Exchange Survey Report.pdfSupporting Information · PDF4 Mar 2022View
CFM.AR(22)016.pdfPlan · PDF4 Mar 2022View
Freetrade Exchange Ventilation Statement.pdfSupporting Information · PDF4 Mar 2022View
CFM.AR(PL)105.pdfPlan · PDF4 Mar 2022View
3882-HAN-ZZ-XX-DR-PS-01 PLANNING-3882-HAN-ZZ-GF-DR-PS-01-03.pdfPlan · PDF4 Mar 2022View
CFM.AR(43)018.pdfPlan · PDF4 Mar 2022View
CFM.AR(43)015.pdfPlan · PDF4 Mar 2022View
CFM.AR(33)017.pdfPlan · PDF4 Mar 2022View
CFM.AR(99)006.pdfPlan · PDF4 Mar 2022View
CFM.AR(22)011.pdfPlan · PDF8 Jun 2022View
3882-HAN-ZZ-XX-DR-M-11-01 Typical Floor BCO Zones.pdfPlan · PDF4 Mar 2022View
CFM.AR(42)017.pdfPlan · PDF7 Jun 2022View
CFM.AR(10)003.pdfPlan · PDF4 Mar 2022View
3882-HAN-ZZ-XX-DR-PS-01 Typical Floor MEP Services Section.pdfPlan · PDF4 Mar 2022View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Approve
026907.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.